Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Storm Water Services / General Services

CHEMICAL GROUTING AND PIPE LINING

  • Posting Number: 2022-Q3(Jul-Sep)-CSWS-8987
  • Anticipated Posting Date: 2022-07-18
  • Last Updated: 09/21/22
Add to Calendar 2022-07-18 2022-07-18 CHEMICAL GROUTING AND PIPE LINING

The objective of this RFP is to solicit proposals for chemical grouting and pipe lining services.

The company shall provide chemical grouting and cured in place pipe lining at various public and private locations as needed within the City of Charlotte.  The services included are but not limited to:

    • Chemical grouting, and cured in place pipe lining
      • Provide professional consultant service for best practices
      • Provide recommendation on the installation process
      • Provide recommendation during the design and installation phase of the project
      • Provide professional representation during the design and installation of the project
    • Installation process
      • Shall be able to install chemical grouting, and cured in place pipe lining
      • Shall be able to remove and replace
        • Storm drainage structures
        • Curb & gutter
        • Asphalt
        • Incidental work to complete the chemical grouting, and cured in place pipe lining

Archived

Aviation / Commodities & Goods

Aviation Ground Support Equipment

  • Posting Number: 2022-Q3(Jul-Sep)-AVI-9332
  • Anticipated Posting Date: 2022-09-20
  • Last Updated: 09/20/22
Add to Calendar 2022-09-20 2022-09-20 Aviation Ground Support Equipment

The scope of this contract shall be to provide aviation ground support equipment for airport operation services. The term will be 3 years with the option to renew for 2 additional one year terms.

Archived

Charlotte Area Transit System / Technology Goods & Services

CATS Financial Management System

  • Posting Number: 2022-Q3(Jul-Sep)-CATS-8495
  • Anticipated Posting Date: 2022-09-14
  • Last Updated: 09/19/22
Add to Calendar 2022-09-14 2022-09-14 CATS Financial Management System

Charlotte Area Transit System (CATS) is seeking a Finance & Procurement system for CATS Bus Operations Facility.  Accounting software will be Cloud Based to Include AP, AR, G/L, Report Writer as well as fixed assets.
It must Support City of Charlotte (COC) General Ledger account strings.
Possibility to integrate with COC System
Requires workflow approval Multiple modules to include Requisitions, Request for Checks and Purchase Order Change Orders.
Accounts payable invoice matching to Purchase Orders with ability to attach electronic copies to the Purchase Orders as well as unique invoice confirmation.
OCR Capability
Support multiple ledger types.
Vendor central module.
Interface with outside vendors such for payroll and maintenance.
Data must export to CSV, Excel and other formats.
Report Writer
Multi User with user access managed at user level or user group.
PSR 1274

Archived

Charlotte Storm Water Services / Construction

Bonwood Storm Drainage Improvement Project

  • Posting Number: 2022-Q3(Jul-Sep)-CSWS-5449
  • Anticipated Posting Date: 2022-09-16
  • Last Updated: 09/19/22
Add to Calendar 2022-09-16 2022-09-16 Bonwood Storm Drainage Improvement Project

The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Bonwood Storm Drainage Improvement Project (SDIP) area.

The Bonwood SDIP is bordered by Wendover Road to the south, Canterbury Drive to the east and Chadsford Place to the west. This project is within a drainage area of approximately 124 acres and the improvements include paving, curb and gutter, culvert replacements, pipe system lining/repair and upgrades, and minor open channel improvements.

Archived

Charlotte Water / Construction

Goose Creek Sanitary Sewer to Cresthill

  • Posting Number: 2022-Q3(Jul-Sep)-CW-9013
  • Anticipated Posting Date: 2022-08-31
  • Last Updated: 09/08/22
Add to Calendar 2022-08-31 2022-08-31 Goose Creek Sanitary Sewer to Cresthill

Project site is mainly wooded and has minimal housing. There will be one crossing on Lawyers Rd. The project will consist of approximately 5,500 linear feet of 8-inch gravity sewer.

Archived

Charlotte Storm Water Services / Construction

5508 Hughes Drive Storm Drainage Improvement Project

  • Posting Number: 2022-Q3(Jul-Sep)-CSWS-5439
  • Anticipated Posting Date: 2022-09-07
  • Last Updated: 09/08/22
Add to Calendar 2022-09-07 2022-09-07 5508 Hughes Drive Storm Drainage Improvement Project

Work performed under this contract will consist of the installation of storm drainage, updated drainage system outfall, curb, gutter, and resurfacing of the cul-de-sac.  ​

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2023-D

  • Posting Number: 2022-Q3(Jul-Sep)-CSWS-9046
  • Anticipated Posting Date: 2022-08-11
  • Last Updated: 09/06/22
Add to Calendar 2022-08-11 2022-08-11 Storm Water Repair and Improvement FY2023-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve: mobilization, earthwork, drainage structures,  storm drain pipe systems, and channels.   Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2023-E

  • Posting Number: 2022-Q3(Jul-Sep)-CSWS-9048
  • Anticipated Posting Date: 2022-08-16
  • Last Updated: 09/06/22
Add to Calendar 2022-08-16 2022-08-16 Storm Water Repair and Improvement FY2023-E

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve: mobilization, earthwork, drainage structures,  storm drain pipe systems, and channels.   Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Archived

Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2023-F

  • Posting Number: 2022-Q3(Jul-Sep)-CSWS-9050
  • Anticipated Posting Date: 2022-08-18
  • Last Updated: 09/06/22
Add to Calendar 2022-08-18 2022-08-18 Storm Water Repair and Improvement FY2023-F

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve: mobilization, earthwork, drainage structures,  storm drain pipe systems, and channels.   Additional work will include: working over, under, near, and around existing private utilities, asphalt paving concrete flatwork, landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.