Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

Can Lift Stations Phase III-CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-7390
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/13/24
Add to Calendar 2024-09-01 2024-09-01 Can Lift Stations Phase III-CANCELLED

Rehabilitation of wastewater pumping stations. Includes replacement of submersible pumps and pump controls. Makes improvements to flow metering and SCADA systems.

5/13 consolidated with Lift Station Improvements Phrase III.

Archived

Charlotte Water / Construction

Elevated Storge Tank #2 – Woodlawn – CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12254
  • Anticipated Posting Date: 2024-09-02
  • Last Updated: 05/07/24
Add to Calendar 2024-09-02 2024-09-02 Elevated Storge Tank #2 – Woodlawn – CANCELLED

Construction of the second elevated storage tank at the Woodlawn site if there is sufficient funding after starting construction on the first elevated storage tank (Sunset Road). The second elevated storage tank has a capacity of three million gallons. The project is fully designed and permitted.

  • inactivate due to budget reprioritization

In Development

Charlotte Department of Transportation / Construction

CDOT Sweden Rd EVSE

  • Posting Number: 2024-Q3(Jul-Sep)-CDT-14489
  • Anticipated Posting Date: 2024-08-01
  • Last Updated: 04/10/24
Add to Calendar 2024-08-01 2024-08-01 CDOT Sweden Rd EVSE

In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The CDOT Sweden Rd facility currently contains many fleet vehicles and buses that are run on gasoline. In order to meet the 2030 target, the City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the CDOT Sweden Rd Facility with EV Chargers.

Archived

Charlotte Water / Construction

FY25 Street Mains Extensions Contract 1 – CANCELLED

  • Posting Number: 2025-Q3(Jul-Sep)-CW-12275
  • Anticipated Posting Date: 2025-07-01
  • Last Updated: 03/25/24
Add to Calendar 2025-07-01 2025-07-01 FY25 Street Mains Extensions Contract 1 – CANCELLED

This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.

Cancelled as of 3/25/2024.

Archived

Charlotte Area Transit System / Commodities & Goods

Vanpool Vehicle Purchase Contract 2023 – CANCELLED

  • Posting Number: 2023-Q3(Jul-Sep)-CATS-11900
  • Anticipated Posting Date: 2023-08-15
  • Last Updated: 03/25/24
Add to Calendar 2023-08-15 2023-08-15 Vanpool Vehicle Purchase Contract 2023 – CANCELLED

CATS BOD is requesting a solicitation for a  1-year contract with 4 one-year renewals to purchase revenue vehicles for the Vanpool Program.

73 Replacement Vehicles and 10 Expansion
65- Seven Passenger Vans
18- Fifteen Passenger Vans
Totaling 83 Vans

PSR # 1430

Archived

Charlotte Area Transit System / Construction

CATS MOW Tremont Grade Crossing Gate Mast Relocation FY24 Shutdown CAN ... CATS MOW Tremont Grade Crossing Gate Mast Relocation FY24 Shutdown CANCELLED

  • Posting Number: 2023-Q3(Jul-Sep)-CATS-10604
  • Anticipated Posting Date: 2023-08-14
  • Last Updated: 03/21/24
Add to Calendar 2023-08-14 2023-08-14 CATS MOW Tremont Grade Crossing Gate Mast Relocation FY24 Shutdown CANCELLED

Contractor shall furnish the necessary equipment, traffic control and labor to remove the existing west bound traffic gate and install a new gate per the approved Plans. The Owner (CATS) shall provide the existing cable, gate foundation and new crossing gate, with all appurtenances, to be installed.
Contractor shall:
A. Contractor shall submit a schedule and detailed workplan for approval prior to the start of work.
B. Contractor shall develop, and submit for approval, test procedures and test forms for the new gate and crossing prior to executing field work.
C. Set up approved traffic control to protect the crossing during the Work both vehicle traffic and pedestrian traffic..
D. Remove the existing gate and deliver it to the North Yard Maintenance Facility or other CATS property as directed.
E. Remove all, or a sufficient amount, of the gates’ foundation so as to replace the soil and sidewalk.
F. Contractor shall demolish the sidewalk and excavate for a new gate foundation per approved Plans. Existing conduit shall be intercepted and rerouted into the new foundation. Contractor shall provide the necessary conduit, sweeps, supports, couplings and glue. Existing cable shall be un-landed, tested and terminated for the new gate.
G. Contractor shall remove and install new ADA compliant Truncated Dome.
H. Contractor shall set the new foundation and gate, provided by the Owner, and adjust gate arm length, counterweights, arm lights and light directions per the approved Plans and MUTCD requirements.
I. Contractor shall test the new gate and crossing operation.
J. Contractor shall submit test results for review and approval.

PSR #1476

Archived

Charlotte Area Transit System / Commodities & Goods

CATS Promotion Items CANCELLED

  • Posting Number: 2023-Q3(Jul-Sep)-CATS-11952
  • Anticipated Posting Date: 2023-08-22
  • Last Updated: 03/21/24
Add to Calendar 2023-08-22 2023-08-22 CATS Promotion Items CANCELLED

Purchase 600 gorge sling bags as CATS promotional items

 

PSR # 1530

Archived

Charlotte Water / Construction

978 Zone Water Transmission Main and Booster Pump Station-CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12256
  • Anticipated Posting Date: 2024-07-01
  • Last Updated: 03/20/24
Add to Calendar 2024-07-01 2024-07-01 978 Zone Water Transmission Main and Booster Pump Station-CANCELLED

Project consists of a large diameter water transmission main and booster pump station. Request for Qualifications and engineering services design contract for a water transmission main from Franklin Water Treatment Plant to Statesville Avenue and 978 Zone Booster Pump Station (Northeast Water Transmission Project). Preliminary assessment of project alternatives being completed now.

cancelled on 3/15

Archived

Charlotte Water / Construction

FY24 Small Diameter Water and Sewer Services Contract #2-CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12244
  • Anticipated Posting Date: 2024-07-10
  • Last Updated: 03/20/24
Add to Calendar 2024-07-10 2024-07-10 FY24 Small Diameter Water and Sewer Services Contract #2-CANCELLED

This contract is for the continuous installation of small water and sewer services, as needed, for commercial or residential purposes with a diameter of less than one and a half inches. Charlotte Water installed about 1,800 new residential water and sewer taps in the last 12 months. This contract will help meet the demand for these kinds of service connections for the next two years.

cancelled on 3/14/2024