Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

In Development

Aviation / Construction

South End-Around Taxiway (SEAT)

  • Posting Number: 2024-Q3(Jul-Sep)-AVI-12918
  • Anticipated Posting Date: 2024-09-30
  • Last Updated: 05/13/24
Add to Calendar 2024-09-30 2024-09-30 South End-Around Taxiway (SEAT)

As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the south end of new Runway 1C-19C and existing Runway 18C-36C.  This project will construct the South End-Around Taxiway (SEAT).  The project includes erosion and sedimentation control, grading, drainage, retaining wall construction, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the SEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Archived

Charlotte Water / Construction

960 East/West Water Main-CANCELLED

  • Posting Number: 2027-Q3(Jul-Sep)-CW-12261
  • Anticipated Posting Date: 2027-07-01
  • Last Updated: 05/13/24
Add to Calendar 2027-07-01 2027-07-01 960 East/West Water Main-CANCELLED

Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd.  This project improves the water transmission capacity in the 960 pipe zone.  Project is in final design, permitting and easement acquisition.

5/13 cancelled due to project schedule reprioritization.

Archived

Charlotte Water / Construction

Can Lift Stations Phase III-CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-7390
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/13/24
Add to Calendar 2024-09-01 2024-09-01 Can Lift Stations Phase III-CANCELLED

Rehabilitation of wastewater pumping stations. Includes replacement of submersible pumps and pump controls. Makes improvements to flow metering and SCADA systems.

5/13 consolidated with Lift Station Improvements Phrase III.

In Development

Department of General Services / Construction

RFQ – CMAR Services – Charlotte Mecklenburg Goverment Cent ... RFQ – CMAR Services – Charlotte Mecklenburg Goverment Center ADA Implementation Phase II

  • Posting Number: 2024-Q3(Jul-Sep)-DGS-14783
  • Anticipated Posting Date: 2024-07-01
  • Last Updated: 05/13/24
Add to Calendar 2024-07-01 2024-07-01 RFQ – CMAR Services – Charlotte Mecklenburg Goverment Center ADA Implementation Phase II

The Charlotte-Mecklenburg Government Center (CMGC) and the adjacent parking garage have been identified in the City-wide ADA Transition Plan for Program Implementation (Program).

The CMGC facility is an existing 14-story, nominally 440,000 square foot building, located at 600 East 4th Street (parcel ID 12502601) and houses several City & County Departments. The adjacent CMGC Parking Garage (parcel 12502501) is a 5-story concrete deck.

Phase II of this ADA Implementation includes all public and non-public facing spaces of the facilities (with the exception of the Council Chambers) and will resolve the physical, non-conforming ADA barriers identified in the ADA Transition Plan, or as required to meet the City of Charlotte ADA Design Guidelines and the 2010 ADA Standards for Accessible Design.

The CMGC is required to stay open to the public and staff during all phases of the project. Active coordination with tenants, facilities staff, and stakeholders will be critical for the successful completion of this project.

 

 

 

 

Archived

Charlotte Water / Construction

Elevated Storge Tank #2 – Woodlawn – CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12254
  • Anticipated Posting Date: 2024-09-02
  • Last Updated: 05/07/24
Add to Calendar 2024-09-02 2024-09-02 Elevated Storge Tank #2 – Woodlawn – CANCELLED

Construction of the second elevated storage tank at the Woodlawn site if there is sufficient funding after starting construction on the first elevated storage tank (Sunset Road). The second elevated storage tank has a capacity of three million gallons. The project is fully designed and permitted.

  • inactivate due to budget reprioritization

In Development

Charlotte Water / Construction

Water Main Replacement Bid Package

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12279
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/07/24
Add to Calendar 2024-09-01 2024-09-01 Water Main Replacement Bid Package

Construction contract utilized for water main replacement. Replacement focuses on assets that have reached end of useful life that are now causing operational issues. Primarily focuses on assets that are 12 inches and smaller.

In Development

Charlotte Water / Construction

McAlpine Biosolids Improvements

  • Posting Number: 2024-Q3(Jul-Sep)-CW-5775
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/07/24
Add to Calendar 2024-09-01 2024-09-01 McAlpine Biosolids Improvements

Rehabilitation of Biosolids Facilities and Processes which includes the dewatering facility, digester complexes and digesters.  Includes cleanout of eight digesters.  Major mechanical, process work, and electrical upgrades will also be completed.

In Development

Charlotte Water / Construction

McAlpine Preliminary and Primary Treatment Construction Package #1

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12250
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/06/24
Add to Calendar 2024-09-01 2024-09-01 McAlpine Preliminary and Primary Treatment Construction Package #1

Provides for rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.

In Development

Charlotte Water / Construction

FY24 Water/Sewer Infrastructure Construction – Contract 3

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12248
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/06/24
Add to Calendar 2024-09-01 2024-09-01 FY24 Water/Sewer Infrastructure Construction – Contract 3

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.