/ Opportunities

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Archived

Charlotte Water / Construction

FY24 Water/Sewer Infrastructure Construction – Contract 2-CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12246
  • Anticipated Posting Date: 2024-07-10
  • Last Updated: 06/26/24
Add to Calendar 2024-07-10 2024-07-10 FY24 Water/Sewer Infrastructure Construction – Contract 2-CANCELLED

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

Cancelled 6/25

Archived

Charlotte Water / Construction

FY24 Water/Sewer Infrastructure Construction – Contract 3 -CANCELLED ... FY24 Water/Sewer Infrastructure Construction – Contract 3 -CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-12248
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 06/21/24
Add to Calendar 2024-09-01 2024-09-01 FY24 Water/Sewer Infrastructure Construction – Contract 3 -CANCELLED

This contract consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low-pressure sanitary sewer, water distribution system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

Archived

Charlotte Water / Construction

FY24 Water/Sewer Infrastructure Construction – Contract 1

  • Posting Number: 2023-Q3(Jul-Sep)-CW-12188
  • Anticipated Posting Date: 2023-08-15
  • Last Updated: 06/21/24
Add to Calendar 2023-08-15 2023-08-15 FY24 Water/Sewer Infrastructure Construction – Contract 1

The Project consists of an undetermined number of individual projects consisting of water and/or sewer extensions, water and/or sewer replacements, low pressure sanitary sewer, water distribution
system reliability improvement projects, and/or sanitary sewer capacity assurance projects, which will be assigned by the Project Engineer.

Archived

Charlotte Storm Water Services / General Services

Pavement Sweeping and Cleaning – Storm Water Services

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-14903
  • Anticipated Posting Date: 2024-07-23
  • Last Updated: 05/31/24
Add to Calendar 2024-07-23 2024-07-23 Pavement Sweeping and Cleaning – Storm Water Services

Services needed by Storm Water Services for street and sidewalk sweeping and cleaning services.

Archived

Charlotte Mecklenburg Police Department / General Services

CMPD Workload Analysis Services

  • Posting Number: 2024-Q3(Jul-Sep)-CMPD-14827
  • Anticipated Posting Date: 2024-07-01
  • Last Updated: 05/15/24
Add to Calendar 2024-07-01 2024-07-01 CMPD Workload Analysis Services

The Charlotte Mecklenburg Police Department (“CMPD”) staffs a large number of units and divisions with unique work responsibilities.  This Contract pertains to conducting a Workload Analysis for a minimum of two to three units/divisions per year depending on the size and scope of work for each. CMPD will request work through Task Orders containing specific scopes of work. The Company shall provide the total work hours required to complete the work defined in each Task Order. Final cost for each Task Order will be based on the proposed work hours and the hourly rate awarded under this Contract.

Archived

Charlotte Water / General Services

Hydraulic Modeling and Baseline Capacity Analysis Update-Cancelled

  • Posting Number: 2024-Q3(Jul-Sep)-CW-17278
  • Anticipated Posting Date: 2024-09-25
  • Last Updated: 05/15/24
Add to Calendar 2024-09-25 2024-09-25 Hydraulic Modeling and Baseline Capacity Analysis Update-Cancelled

The purpose of this work is to provide modeling support to Charlotte Water (CLTWater) for the Capacity Assurance Program. The tasks involved include updating models for specific basins, revising baseline available capacities for those same basins, conducting individual capacity analyses as directed by CLTWater, and providing additional support services.

Cancelled as of 9/18

Archived

Charlotte Water / Construction

960 East/West Water Main-CANCELLED

  • Posting Number: 2027-Q3(Jul-Sep)-CW-12261
  • Anticipated Posting Date: 2027-07-01
  • Last Updated: 05/13/24
Add to Calendar 2027-07-01 2027-07-01 960 East/West Water Main-CANCELLED

Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd.  This project improves the water transmission capacity in the 960 pipe zone.  Project is in final design, permitting and easement acquisition.

5/13 cancelled due to project schedule reprioritization.

Archived

Charlotte Water / Construction

Can Lift Stations Phase III-CANCELLED

  • Posting Number: 2024-Q3(Jul-Sep)-CW-7390
  • Anticipated Posting Date: 2024-09-01
  • Last Updated: 05/13/24
Add to Calendar 2024-09-01 2024-09-01 Can Lift Stations Phase III-CANCELLED

Rehabilitation of wastewater pumping stations. Includes replacement of submersible pumps and pump controls. Makes improvements to flow metering and SCADA systems.

5/13 consolidated with Lift Station Improvements Phrase III.

In Development

Department of General Services / Construction

RFQ – CMAR Services – Charlotte Mecklenburg Goverment Cent ... RFQ – CMAR Services – Charlotte Mecklenburg Goverment Center ADA Implementation Phase II

  • Posting Number: 2024-Q3(Jul-Sep)-DGS-14783
  • Anticipated Posting Date: 2024-07-01
  • Last Updated: 05/13/24
Add to Calendar 2024-07-01 2024-07-01 RFQ – CMAR Services – Charlotte Mecklenburg Goverment Center ADA Implementation Phase II

The Charlotte-Mecklenburg Government Center (CMGC) and the adjacent parking garage have been identified in the City-wide ADA Transition Plan for Program Implementation (Program).

The CMGC facility is an existing 14-story, nominally 440,000 square foot building, located at 600 East 4th Street (parcel ID 12502601) and houses several City & County Departments. The adjacent CMGC Parking Garage (parcel 12502501) is a 5-story concrete deck.

Phase II of this ADA Implementation includes all public and non-public facing spaces of the facilities (with the exception of the Council Chambers) and will resolve the physical, non-conforming ADA barriers identified in the ADA Transition Plan, or as required to meet the City of Charlotte ADA Design Guidelines and the 2010 ADA Standards for Accessible Design.

The CMGC is required to stay open to the public and staff during all phases of the project. Active coordination with tenants, facilities staff, and stakeholders will be critical for the successful completion of this project.

 

 

 

 

1 2 14 15 16 46 47