Opportunities per Page
/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
Solicitation Category
- Architectural / Engineering Services
- Commodities & Goods
- Construction
- Construction Cost Estimating
- General Services
- Technology Goods & Services
Utilization
- SBE-Small Business Enterprise
- DBE-Disadvantaged Business Enterprise
- MBE-Minority Business Enterprise
- WBE-Women Owned Business Enterprise
Expected Release Date
From Date
To Date
Estimated Total Value
- $10,000 - 49,999
- $50,000 - 99,999
- $100,000 - 249,999
- $250,000 - 499,999
- $500,000 - 999,999
- $1,000,000 -4,999,999
- $5,000,000 - 9,999,999
- $10,000,000+
In Development
Charlotte Department of Transportation / Commodities & Goods
Trip Hazard Removal Services
In Development
City Manager's Office / General Services
Grant Administration for Artists, Creatives, and Collaboration
- Posting Number: 2025-Q1(Jan-Mar)-CMO-16533
- Anticipated Posting Date: 2025-01-11
- Last Updated: 12/19/24
The City is seeking a partner to serve as the lead agency to develop, support, and administer grant funds for the City’s Art and Culture department. Proposals should include and demonstrate:
- Experience and history with grant making, specifically in the arts and culture sector
- Alignment with the Charlotte Arts and Culture Plan
- Communications plan that promotes diversity, equity, and inclusion in soliciting proposals
- Project management plan
- Award selection plan and process
- Data and reporting in all phases of grant administration (engagement, application, final selection)
- Demographics (age, race/ethnicity, gender) of applicants and intended audience served
- Geography of intended audience served
- Inclusion of diverse communities (examples, not definitive)
- LGBTQ+
- Different abilities/disabilities
- Non-english speakers
Applicants should develop a timeline that ensure all funds are disbursed by June 30, 2025.
In Development
Charlotte Water / General Services
Field Surveying Services (Geographic Information Systems Group and Cap ... Field Surveying Services (Geographic Information Systems Group and Capacity Assurance Program)
- Posting Number: 2025-Q2(Apr-Jun)-CW-14816
- Anticipated Posting Date: 2025-04-11
- Last Updated: 12/19/24
This opportunity involves providing survey services to support Charlotte Water’s GIS and Capacity Assurance Programs, including the following tasks:
- Review available data and consult with the city to clarify and define the city’s requirements.
- Obtain necessary information, conduct investigations, and make reasonable efforts for the Surveyor to become familiar with the philosophy and purpose of each project.
- Identify and analyze requirements from governmental authorities with jurisdiction and assist the city in obtaining the required approvals.
In Development
Charlotte Water / Construction
Paving and Patching and Other Misc Water and Sewer Repairs
- Posting Number: 2025-Q1(Jan-Mar)-CW-13964
- Anticipated Posting Date: 2025-01-10
- Last Updated: 12/19/24
A construction contract to repairs roadways and their appurtenances related to water and sewer infrastructure. In addition, minor work could be related to other existing water sewer infrastructure. The scope will also include some concrete and asphalt work within Charlotte Water.
In Development
Aviation / General Services
Consulting Services for Roof and Skylight Inspections
- Posting Number: 2024-Q1(Jan-Mar)-AVI-16719
- Anticipated Posting Date: 2024-02-06
- Last Updated: 12/19/24
The purpose of these services is to inspect each facility roof and exterior walls by qualified personnel as scheduled by client. This consists of all elements of roofs and building envelopes. No invasive roof openings are anticipated as part of these services. Additionally, perform water tests as scheduled by the client at Skylights, Windows, Exterior Walls or Through-Wall Flashings utilizing a spray rack or standard garden hoses and portable communication.
In Development
Charlotte Water / General Services
FY25 Subsurface Utility Locating Services
- Posting Number: 2025-Q2(Apr-Jun)-CW-15164
- Anticipated Posting Date: 2025-04-12
- Last Updated: 12/19/24
This contract will be for the subsurface utility locates associated with miscellaneous projects, from identifying infrastructure around our existing water and sewer lines to assisting in planning for future water and sewer projects. The contract will be used on an as-needed basis, shared between all engineering divisions of Charlotte Water. This will cover Charlotte Water’s entire service area.
In Development
Charlotte Department of Transportation / General Services
Pavement Markings, Thermoplastic Pavement Markings
- Posting Number: 2025-Q1(Jan-Mar)-CDT-13590
- Anticipated Posting Date: 2025-01-31
- Last Updated: 12/19/24
The pavement markings and line removal will be performed on roadways maintained by the City of Charlotte and the North Carolina Department of Transportation (NCDOT).
This is a task order-based contract for on-call services. The services will be established via task orders. Each task order should include the following: Mobilization, Pavement Markings, Thermoplastic Pavement Markings, Thermoplastic Line Removal, and Traffic Control.
In Development
Charlotte Department of Transportation / Architectural / Engineering Services
Design of Bridge Repairs
- Posting Number: 2024-Q4(Oct-Dec)-CDT-13550
- Anticipated Posting Date: 2025-01-31
- Last Updated: 12/19/24
The Consultant shall prepare technical plans and specifications for the required repairs to the City’s bridges per the Inspection Reports. The Consultant shall schedule completion dates for each bridge. Before the beginning of the next inspection cycle, all bridge repairs should be completed by the contractor.
The Consultant shall prepare two (2) bid documents (including one for guardrail work). Each shall include the technical plans and specifications for the bid packages for each bridge, as well as bid information/requirements for potential contractors.
In Development
Aviation / Architectural / Engineering Services
South Ramp Expansion
- Posting Number: 2025-Q1(Jan-Mar)-AVI-15154
- Anticipated Posting Date: 2025-01-13
- Last Updated: 12/16/24
This will be an RFQ for professional engineering services including final design, of grading, drainage, electrical, pavement, construction administration, surveying, materials testing services. The project will expand the exiting main terminal ramp to the south, in order to provide dual taxi lanes and create the space for the ultimate expansion of Concourse C.
In Development
Aviation / Technology Goods & Services
Design, Implement and Maintenance Services for a Content Management Sy ... Design, Implement and Maintenance Services for a Content Management System (CMS)
- Posting Number: 2025-Q1(Jan-Mar)-AVI-14731
- Anticipated Posting Date: 2025-02-20
- Last Updated: 12/12/24
Company is responsible for designing, developing and maintaining the approved web and mobile application. The website should consume content and web assets from the Content Management Database (CMDB) similar to the function of a headless web Content Management System (CMS). The mobile application will also consume content from the CMDB. The content
will be created and editable in the CMDB and accessed via a feed or API to the front-end website and mobile application.
In Development
Aviation / Technology Goods & Services
CLT Technology Public Wi-Fi
- Posting Number: 2025-Q1(Jan-Mar)-AVI-14787
- Anticipated Posting Date: 2025-01-16
- Last Updated: 12/12/24
This Contract is to provide a Public WiFi solution addressing the full spectrum of CLT’s technology systems. The Work will include, without limitation, program/project management, organizational change management, and implementation services covering the complete lifecycle of technology systems from inception, starting with planning, through design, procurement, configuration, integration, install, test, operational-readiness-activation-training (ORAT), and operation & maintenance (O&M), and replacement. This Public Wifi effort will cover all areas where existing coverage is present and to include any newly constructed areas.
In Development
Aviation / Technology Goods & Services
On Call Technology Services
- Posting Number: 2025-Q1(Jan-Mar)-AVI-14734
- Anticipated Posting Date: 2025-02-25
- Last Updated: 12/12/24
Contract(s) will be used to provide maintenance and support for systems purchased under these Contracts. Contracts may include additional software licenses, services, and hardware. These task order Contracts will provide Aviation the necessary flexibility to ensure the needs of the rapidly changing environment are met. It is critical to ensure the Airport’s technology systems are stable and safe to allow tenants to connect to their own technology systems.
In Development
Aviation / General Services
On-Call Window Washing Services
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16004
- Anticipated Posting Date: 2025-01-09
- Last Updated: 12/12/24
The scope of this contract shall be to provide window cleaning services through the Airport’s main terminal, business valet parking decks, daily parking decks, hourly parking deck, old terminal, and ramp tower. The services will include interior and exterior window cleaning on an “on-call” basis.
In Development
Aviation / Technology Goods & Services
CLT VoiP Migration
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16036
- Anticipated Posting Date: 2025-01-21
- Last Updated: 12/12/24
The primary goal of this project is to upgrade the existing telecommunications infrastructure at the airport from copper Plain Old Telephone Service (POTS) lines to a more advanced, efficient Voice over Internet Protocol (VoIP) system. This transition is aimed at addressing the current limitations of the outdated system, which include lack of modern communication features and inefficiency in handling the airport’s operational demands.
In Development
Aviation / General Services
Triennial Exercise Contract Services
- Posting Number: 2024-Q4(Oct-Dec)-AVI-16648
- Anticipated Posting Date: 2024-12-23
- Last Updated: 12/12/24
The City of Charlotte (“City”) Aviation Department is seeking bids for the FAA mandated Charlotte Douglas International Airport Full-Scale Triennial Exercise (the “Work”) to be held in October 2025.
In Development
Charlotte Storm Water Services / Construction
Collective AF Storm Drainage Improvement Project:
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-12654
- Anticipated Posting Date: 2025-02-16
- Last Updated: 12/12/24
Collective Storm Drainage Improvement Projects Series AF will involve 3 projects throughout the City of Charlotte 6112 Bridlewood Ln, 6108 Bridlewood Ln, 6032 Bridlewood Ln. 6112 Bridlewood Ln will consist of lining approx. 149 LF 15” RCP; 243 LF 30” RCP; 151 LF 36” RCP with CIPP. Scope also includes replacing rerouting the existing system into the r/w and adding approx. 177 42” RCP and 122 LF of 34×53 elliptical pipe and storm drainage structure replacement. There will also be approx. 418 LF of sewer replacement with 8” DIP. Pavement resurfacing and curb and gutter replacement are also to be included in this project. 6108 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 31 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include approx. 31LF of 15” RCP replacement along with replacement of (1) CB, concrete driveway replacement, curb and gutter and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs. 6032 Bridlewood Ln will consist of removing an existing CMP pipe and replacing with approx. 30 LF of 9×7 RCBC. A temporary pedestrian bridge will be added to cross the creek during time of construction for the property owners. The scope is also to include concrete driveway replacement, curb and gutter, and pavement resurfacing. There will also be grading around the existing creek that will tie into (2) new HWs.
In Development
Charlotte Storm Water Services / Construction
Collective AC Storm Drainage Improvement Program
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-12090
- Anticipated Posting Date: 2025-02-26
- Last Updated: 12/12/24
Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 1925 Arnold Dr, 10112 Fairway Ridge, and 1127 Willhaven Dr. 1925 Arnold Dr will involve new drainage structures and reinforced concrete pipe, a modified pipe alignment, new curb and gutter, concrete driveway replacement, sanitary sewer replacement as well as full depth asphalt replacement along Arnold Dr. 10112 Fairway Ridge will involve new drainage structures and elliptical reinforced concrete pipe, a modified pipe alignment, sanitary sewer replacement, concrete driveway and full depth asphalt replacement along Fairway Ridge. 1127 Willhaven Dr will consist of reinforced concrete pipe and drainage structure installation, ditch grading, full-depth asphalt replacement as well as curb and gutter replacement along Willhaven Drive. There will be 2 culvert replacements not located along Willhaven Drive, 1 will be a driveway culvert located at 5328 Randolph Rd and the other will be crossing under Crestbrook Drive. Both culverts will consist of reinforced concrete pipe, drainage structures, asphalt replacement, and channel grading. The culvert under Crestbrook Drive will also require curb and gutter as well as sidewalk replacement.
In Development
Charlotte Storm Water Services / Construction
Collective AD Storm Drainage Improvement Program
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-12092
- Anticipated Posting Date: 2025-06-15
- Last Updated: 12/12/24
Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd. 4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place. 2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement. 4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.
In Development
Charlotte Storm Water Services / Construction
Collective Q Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-8357
- Anticipated Posting Date: 2025-03-15
- Last Updated: 12/12/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Birmingham 6317 Storm Drain Improvement Project
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-7062
- Anticipated Posting Date: 2025-05-18
- Last Updated: 12/12/24
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Storm Water Services / Construction
Beckwith-Meadow Storm Drainage Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-5445
- Anticipated Posting Date: 2024-12-29
- Last Updated: 12/12/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Louise Ave Storm Drainage Improvement Project
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-3434
- Anticipated Posting Date: 2025-06-15
- Last Updated: 12/12/24
This construction project is located just east of downtown along an unnamed tributary to Little Sugar Creek on Louise Ave. The purpose and need for the project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.
In Development
Charlotte Storm Water Services / Construction
Marlwood/Waverly (Dredging) Surface Water Quality Improvement Project ... Marlwood/Waverly (Dredging) Surface Water Quality Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-12169
- Anticipated Posting Date: 2025-01-30
- Last Updated: 12/12/24
The Marlwood/Waverly project area consists of the two ponds, Marlwood Lake located south of Albemarle Road near Marlwood Circle, and Waverly Lake located north of Albemarle Road near Almond Road. The existing ponds have silted in and project improvements include pond dredging to specified projects depths.
In Development
Charlotte Storm Water Services / Construction
Summerlin Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-11509
- Anticipated Posting Date: 2025-01-28
- Last Updated: 12/11/24
This project is on Brynwood Drive, Wessynton Drive, and Summerline Place. The existing drainage system consists of a pipe system under city-maintained roads. The improvements include pipe system upgrades.
In Development
Charlotte Storm Water Services / Construction
Foxwood Road 2727 Storm Drain Improvement Project
- Posting Number: 2025-Q4(Oct-Dec)-CSWS-7058
- Anticipated Posting Date: 2025-10-02
- Last Updated: 12/11/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Storm Water Services / Construction
Craighead/Tryon Storm Drainage Improvement Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-11515
- Anticipated Posting Date: 2025-08-07
- Last Updated: 12/11/24
The Craighead/Tryon Storm Drainage Improvement Project is bordered by Glory Street to the north, Little Sugar Creek to the south, Sugar Creek Road to the east and Craighead Road to the west. The existing drainage system consists of pipe system under city-maintained road, state-maintained road, and private property. The improvements include pipe system upgrades.
In Development
Charlotte Storm Water Services / Construction
Shamrock Gardens Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3461
- Anticipated Posting Date: 2025-01-15
- Last Updated: 12/11/24
This construction project is located near Eastway Drive and Shamrock Drive and involves addressing a deteriorated corrugated metal pipe system located within the Shamrock Gardens Apartment complex as well as flooding of multiple roadway crossings. An analysis of existing conditions will be performed to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, design and construction of needed improvements. The Shamrock Gardens Storm Drainage Improvement Project is bordered by Purser Drive to the north, Shamrock Drive to the south, Briar Creek to the east and Eastway Drive to the west.
In Development
Charlotte Storm Water Services / Construction
Dobson Dr (832) Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3463
- Anticipated Posting Date: 2025-01-29
- Last Updated: 12/11/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Cedar St Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-11513
- Anticipated Posting Date: 2025-01-29
- Last Updated: 12/11/24
This project is located on South Cedar Street between Stadium View Drive and Westmere Avenue. The existing drainage system consists of a culvert under a city-maintained road. The improvements include culvert and pipe system upgrades.
In Development
Charlotte Storm Water Services / Construction
Storm Water Repair and Improvement FY2025 G
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-16654
- Anticipated Posting Date: 2025-01-10
- Last Updated: 12/11/24
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, , and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.
In Development
Charlotte Department of Transportation / Construction
Asphalt Rejuvenating Application Services
- Posting Number: 2024-Q4(Oct-Dec)-CDT-16021
- Anticipated Posting Date: 2024-12-31
- Last Updated: 12/11/24
This contract is for GUARDRAIL INSTALLATION & REPAIRS ON VARIOUS ROADS, AS NEEDED, UPON REQUEST IN THE CITY OF CHARLOTTE. The Engineer and or designee will designate maintenance and repair of guardrail at various locations in the city. The maintenance and repair of guardrail throughout the city will vary on the amount of existing or damaged guardrail on each route and should take this into consideration when submitting the bid. During maintenance and/or repair of damaged sections of guardrail, the contractor shall replace all needed components of guardrail as directed by the Engineer and stabilize existing guardrail and appurtenances at the site. All work and materials shall be in accordance with the provisions of the General Guidelines of this contract, the Project Special Provisions, the North Carolina Department of Transportation Standard Specifications for Roads and Structures, January 2024, the North Carolina Department of Transportation Roadway Standard Drawings, January 2024, and the current edition of the Manual of Uniform Traffic Control Devices (MUTCD).
In Development
Aviation / Construction
Coffey Creek Environmental Mitigation (2nd Re-Solicitation)
- Posting Number: 2024-Q1(Jan-Mar)-AVI-16623
- Anticipated Posting Date: 2024-01-31
- Last Updated: 12/11/24
The purpose of the Coffey Creek Environmental Mitigation bid is to establish a lump sum contract with a qualified contractor to construct the features and components of the Corrective Action Plan that has been designed by WSP, (as Wood Environment & Infrastructure Solutions, Inc.) (the “CAP Design”) for the former U.S. Airways Maintenance Hangar site located at 5020 Hangar Road in Charlotte, Mecklenburg County, North Carolina on behalf of Charlotte Douglas International Airport (CLT). The CAP Design (dated October 20, 2022) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) for review. NCDEQ issued a Notice of Regulatory Requirements (NORR) letter (dated November 30, 2022) indicating approval of the Corrective Action Plan (CAP).
In Development
Charlotte Department of Transportation / General Services
Asphalt Rejuvenating Application Services
- Posting Number: 2024-Q4(Oct-Dec)-CDT-15307
- Anticipated Posting Date: 2024-12-31
- Last Updated: 12/11/24
The Contractor shall furnish all labor, material, and equipment necessary to perform all services for the application of asphalt-rejuvenating agent to asphaltic concrete surfaces at various locations throughout the City of Charlotte. The rejuvenation of surface roads shall be by spray application of a cationic rejuvenating agent composed of petroleum oils and resins emulsified with water. All work shall be in accordance with the specifications, and the applicable drawings, and subject to the terms and specifications conditions of the contract.
In Development
Charlotte Department of Transportation / General Services
Locating Services for the Charlotte Department of Transportation (CDOT ... Locating Services for the Charlotte Department of Transportation (CDOT)
- Posting Number: 2024-Q4(Oct-Dec)-CDT-16377
- Anticipated Posting Date: 2024-12-31
- Last Updated: 12/11/24
This contract will be for fiber optic cable physical locating, marking, and positive responses to NC811 of CDOT’s underground infrastructure as required by the Underground Utility Safety and Damage Prevention Act, Article 8A of Chapter 87 of the North Carolina General Statutes. Work provided under this contract is to supplement CDOT’s current in-house locates unit and will cover the city of Charlotte limits.
In Development
City Wide / Commodities & Goods
Safety Supplies
- Posting Number: 2024-Q1(Jan-Mar)-CTW-16645
- Anticipated Posting Date: 2024-02-01
- Last Updated: 12/11/24
The City of Charlotte is requesting a new contract to provide safety supplies and personal protective equipment. The successful bidder shall agree to receive all orders from the Charlotte Department of Transportation, Neighborhood and Business Services, Charlotte Water, and Solid Waste Services as well as other departments and deliver items ordered to a specified address.
All Products and component parts furnished under the Contract shall be new, shall comply with the specifications and terms and conditions.
In Development
Charlotte Water / General Services
On-Call Doors, Lock and Hardware Services
- Posting Number: 2025-Q1(Jan-Mar)-CW-16635
- Anticipated Posting Date: 2025-01-07
- Last Updated: 12/06/24
This contract is for On-Call Services on an as-needed basis for door, lock and hardware installation and repair services for any and all properties managed by Charlotte Water Building Services.
In Development
City Wide / General Services
Vehicle and Equipment Wash Services
- Posting Number: 2025-Q1(Jan-Mar)-CTW-16181
- Anticipated Posting Date: 2025-01-24
- Last Updated: 12/06/24
The City of Charlotte requires qualified vendors to provide chemicals, repair parts, and maintenance and repair services for drive-through wash facilities owned by the City. The chemicals and services are used to wash, maintain, and disinfect various vehicles and equipment, including but not limited to heavy-duty trucks such as Solid Waste Services collection trucks, dump trucks, sewer trucks, and rodder trucks operated by Charlotte Water; salt spreaders and road repair equipment operated by the Charlotte Department of Transportation; and rail cars operated by the City.
In Development
Charlotte Water / Commodities & Goods
Uniform, Work Clothing, Branded Specialty Items
- Posting Number: 2025-Q1(Jan-Mar)-CW-16441
- Anticipated Posting Date: 2025-01-17
- Last Updated: 12/06/24
This solicitation is to provide employees located in various locations throughout the City of Charlotte and Mecklenburg County with embroidered and non-embroidered uniform and work related clothing. Shirts (including polo, short sleeve, and long sleeve), Coveralls, High Visibility Work Shirt, all jackets, windbreakers, hats and lab coats will require the City of Charlotte logo embroidered on the items. Charlotte Water employees may also order screen print for screen T-shirts.
In Development
Department of General Services / General Services
Vehicle and Equipment Graphics Services
- Posting Number: 2024-Q4(Oct-Dec)-DGS-14707
- Anticipated Posting Date: 2024-12-31
- Last Updated: 12/06/24
The City is seeking a qualified provider to facilitate the performance of city vehicle graphics manufacturing, application, removal, and inventory management services, including but not limited to the following:
• Application, removal, or repair of myriad vehicle graphics for various city vehicles, including but not limited to Charlotte Fire Department staff and service vehicles, Charlotte-Mecklenburg Police Department (CMPD) vehicles, Mecklenburg County Sheriff’s Office (MCSO) vehicles, and Solid Waste heavy trucks.
• Transportation or light and medium vehicles from designated storage areas to the building work area, without assistance from City personnel, to complete service requirements;
• Providing immediate (same day or next day) turnaround service upon request for emergency or exception situations;
• Offering online ordering;
• Designating personnel to share service, inventory data, availability, and service/delivery information;
• Organizing meetings to facilitate service improvements, contract compliance, and addressing other relevant service issues.
Some Additional requirements:
• The Company must maintain active production operations and be physically located within a 50-mile radius of 1105 Otts Street, Charlotte, NC 28205.
• The City has established 3M film specifications. No other film specifications will be considered for this RFP.
• All installation and removal work shall take place at the City’s Vehicle Commission/Decommission Facility located at:
5550 B Wilkinson Boulevard
Charlotte, North Carolina 28208.
In Development
Aviation / General Services
Succession Planning Framework and Related Consulting Services
- Posting Number: 2024-Q1(Jan-Mar)-AVI-16558
- Anticipated Posting Date: 2024-03-01
- Last Updated: 12/04/24
CLT is seeking proposals from capable consultants with expertise in delivering succession planning framework and related consulting services. This initiative pertains to pivotal roles including executive, directorial, and other vital positions, where seamless and effective personnel transitions are paramount to sustain operational efficiency. Leveraging existing internal talent to bridge transitional gaps and preserving indispensable operational insights, knowledge and procedures stand as imperative objectives for CLT. We seek a consultant who can deliver a practical and comprehensive succession plan that is realistic for our business and employee population and can be adapted as needed and maintained by CLT Staff.
In Development
City Wide / General Services
Citywide Janitorial Services
- Posting Number: 2024-Q4(Oct-Dec)-CTW-4726
- Anticipated Posting Date: 2024-12-19
- Last Updated: 12/03/24
The City is seeking qualified companies to provide janitorial services at various city facilities. These services include, but are not limited to, supplying supervision, tools, materials, equipment, cleaning supplies, and expertise to maintain cleanliness in building offices, classrooms, lobbies, corridors, passageways, restrooms, exercise facilities, locker rooms, and industrial or specialized areas, including warehouses and trailers.
In Development
Charlotte Water / Technology Goods & Services
Smart Hydrants
- Posting Number: 2025-Q1(Jan-Mar)-CW-15269
- Anticipated Posting Date: 2025-01-17
- Last Updated: 12/03/24
Charlotte Water is seeking a contract with a company to provide smart hydrants. Charlotte Water is testing multiple solutions to measure system pressure throughout the water network. The solutions utilize “smart hydrants” that take pressure measurements at pre-defined intervals and store the information to a cloud-based application. The selected solution will be used to replace the existing monitors currently in use. The existing monitors are attached to hydrants and require the hydrants to be charged. They are also removed during the winter months and reinstalled in the spring. The new “smart hydrants” will not need to be removed/installed every year and do not need the hydrant to be manually opened to record pressure readings. The new solution will stream-line the process for Charlotte Water and allow for more frequent/timely measurements.
In Development
Department of General Services / Architectural / Engineering Services, Construction
RFQ: Design-Builder – CMPD Helicopter Hangar Relocation
- Posting Number: 2024-Q1(Jan-Mar)-DGS-15259
- Anticipated Posting Date: 2024-01-01
- Last Updated: 12/03/24
Relocation of existing CMPD Helicopter Hangar to an off-site location alongside Billy Graham Parkway will be performed via Alternative Delivery Method, specifically Progressive Design-Build (D/B). FAA regulatory studies, analysis, coordination and permitting is a requirement of this projects scope. A Design Build team will be solicited to implement the project scope.
In Development
Charlotte Storm Water Services / Construction
Rhodes SDIP
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-16570
- Anticipated Posting Date: 2025-05-15
- Last Updated: 12/03/24
Rhodes SDIP is a minor bid project that was created to address the service request at 3738 Rhodes and is located on the City project dashboard.
In Development
Charlotte Storm Water Services / Construction
The Shade Valley Pond Repairs Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-16568
- Anticipated Posting Date: 2025-02-15
- Last Updated: 12/03/24
The Shade Valley Pond Repairs project was initiated in order to relieve the City of significant efforts and costs of ongoing pond maintenance. Proposed improvements to the pond are intended to address nuisance vegetation, increase storage capacity, address geese issues, and enhance the overall aesthetics of the pond. Goals are to restore pond to “below normal pool” volumes via dredging of forebay and main pool to increase water quality function and remove available nutrients contributing to duckweed and algal blooms. The entirety of the pond and littoral shelf will be replanted with wetland plantings and trees to enhance aesthetics and decrease attractiveness of pond to geese. Geese preventative measures are proposed to establish plantings.
In Development
Charlotte Storm Water Services / Construction
Collective Storm Drainage Improvement Projects Series AJ
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-16566
- Anticipated Posting Date: 2025-03-15
- Last Updated: 12/03/24
Collective Storm Drainage Improvement Projects Series AJ will involve 6 projects throughout the City of Charlotte, 1614 Lombardy Circle, 2033 Teddington Drive, 2316 Kilborne Drive, 10513 Moss Mill Lane, 435 Norwood Drive, and 5447 Kerry Glen Lane. These projects will consist of reinforced concrete pipe replacement and realignment. The project pipe will consist of a range of different sizes from 15 inch to 36 inch as well as some elliptical pipe. These projects will also consist of CIPP liner, storm drainage structure replacement, non-standard endwalls, full depth asphalt, curb and gutter, concrete driveway, foundation assessment, foundation protection, boulder toe, soil lifts, and watermain replacement.
In Development
Aviation / Construction
Secondary Airfield PCC Spall Repair Program
- Posting Number: 2024-Q4(Oct-Dec)-AVI-15311
- Anticipated Posting Date: 2024-12-05
- Last Updated: 11/22/24
The Airfield Maintenance Department of the Facilities Division of CLT maintains hard surface areas of CLT’s airfield, and other areas as-needed. The intent of this solicitation is to select a company to provide repairs utilizing selected construction materials for specific projects at various locations on airport property on an as needed basis during the duration of the scheduled contract. The Scope of Services requires the contractor to furnish all supervision, labor, materials, machinery, tools, equipment, and services, and perform and complete all work in an efficient and workmanlike manner necessary to complete construction of the PCC Spall Repair Program.
In Development
Charlotte Storm Water Services / Construction
Morning Dale Storm Drainage Improvement Project
- Posting Number: 2026-Q1(Jan-Mar)-CSWS-16551
- Anticipated Posting Date: 2026-01-10
- Last Updated: 11/22/24
The Morning Dale Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 560 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. This project area is bordered by Hinson Drive to the north, Stratfordshire Drive to the south, Tadlock Place to the east and Morning Dale Road to the west.
In Development
Charlotte Water / Construction
Service Water Improvements and Flow Meter Modifications
- Posting Number: 2025-Q2(Apr-Jun)-CW-16474
- Anticipated Posting Date: 2025-05-30
- Last Updated: 11/14/24
This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.
In Development
Charlotte Water / Construction
McDowell Creek WRRF Primary Clarifier Rehabilitation
- Posting Number: 2025-Q1(Jan-Mar)-CW-16478
- Anticipated Posting Date: 2025-01-31
- Last Updated: 11/14/24
This project will rehabilitate Primary Clarifier #5 at the McDowell Creek Water Resource Recovery Facility. The scope of work includes the demolition and replacement of the existing clarifier mechanism, various concrete repairs, and regrouting of the clarifier floor. Additionally, pressure-reducing valves, plug valves, and telescoping valves will be replaced, and existing electrical and instrumentation systems will be reconnected to the new clarifier mechanism. These improvements will enhance the functionality and durability of the primary clarifier.
In Development
Charlotte Water / Construction
Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) D ... Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) Disinfection System Upgrades
- Posting Number: 2025-Q1(Jan-Mar)-CW-16470
- Anticipated Posting Date: 2025-02-07
- Last Updated: 11/14/24
This project involves the replacement of the existing ultraviolet disinfection system at the Sugar Creek Water Resource Recovery Facility. The scope of work includes upgrading the UV disinfection system while utilizing the existing UV channels, extending these channels, and replacing the current level control gates with fixed finger weirs. A new non-potable water (NPW) pump station wet well will be added, and the drain valve of the East Equalization Basin will be replaced. During this upgrade, a temporary disinfection system will be provided to maintain disinfection while the UV system is out of service. Additionally, two existing NPW pumps will be relocated, and three NPW pumps will be replaced in kind. The Filter Backwash Return Pump wet well work will include the installation of a backwash return pump, the necessary piping and valves, and the replacement of a flow meter.
In Development
Charlotte Water / Construction
Paw Creek Sewer Rehabilitation and Sewer Diversion
- Posting Number: 2025-Q4(Oct-Dec)-CW-13021
- Anticipated Posting Date: 2025-11-01
- Last Updated: 11/14/24
This project consists of the sanitary sewer rehabilitation of approximately 4,700 LF of sewer outfall with cured-in-place lining. This project will extend along the Paw Creek outfall. A 112 LF, 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 LF, 8-inch LF collector sewer. All work will occur within Charlotte Water’s existing easement. A small portion of work on a county parcel.
In Development
Department of General Services / Construction
Lawyers Rd SW (Harri Ann to Chestnut)
- Posting Number: 2026-Q4(Oct-Dec)-DGS-16279
- Anticipated Posting Date: 2026-10-01
- Last Updated: 11/05/24
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
In Development
Charlotte Storm Water Services / Construction
Robert L. Smith Park Pond Surface Water Quality Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-12165
- Anticipated Posting Date: 2025-01-21
- Last Updated: 11/05/24
The project is located at Robert L. Smith Park which can be accessed by Little Rock Road and Starnes Road. An existing pond has a breached dam embankment. Project improvements include dam embankment, forebay, outlet structure, and spillway upgrades.
In Development
Charlotte Storm Water Services / Construction
Newell Stream Restoration Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-12167
- Anticipated Posting Date: 2025-09-25
- Last Updated: 11/05/24
The Newell Stream Restoration Project is located near WT Harris Boulevard (NC 24) and Old Concord Road along a network of tributaries to Toby Creek. Project improvements include restoring approximately 2,500 LF of degraded stream channel, floodplain, and riparian buffer.
In Development
Charlotte Storm Water Services / Construction
Collective AE Storm Drainage Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-12652
- Anticipated Posting Date: 2024-12-16
- Last Updated: 11/05/24
Collective Storm Drainage Improvement Projects Series AE will involve 3 projects throughout the City of Charlotte, 3880 Jeff Adams Dr, 4440 Holbrook Dr, 4611 Denver Av Phase 2. 3880 Jeff Adams Dr will consist of lining approx. 562 LF 54″ CMP with CIPP. Also to include lining 12″ and 15″ systems that tie into main 54” system. We will also be doing invert repair in 54″ pipe where it has eroded. This project will need traffic control along Jeff Adams during construction and foundation protection on the permanent structure located on site. MH and DI adjustments are included in this scope along with asphalt resurfacing around them. 4440 Holbrook Dr scope will include installation of approx. 165LF 30″ RCP; 65LF 36″ RCP; 110LF 29×45 Elliptical pipe; 11LF 24″ RCP; 12LF 18″ RCP; 28LF 15″ RCP. Approx 200 LF of 30” RCP and 15” RCP will be removed and another approx. 200LF of RCP is to be plugged and abandoned. Scope also intends to replace approx. 105LF of sewer with 8” DIP and replace (2) sewer manholes. Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement to also be included. 4611 Denver Av Phase 2 scope will include removal of approx. 75 LF of duel 60” CMP and installation of 65LF of a 10×5 RCBC. Project to include approx. 314 LF of sewer replacement and (6) MHs. Scope also to include conc headwalls and full depth pavement resurfacing.
In Development
Charlotte Storm Water Services / Construction
Severn/Tyndal Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-8349
- Anticipated Posting Date: 2025-03-25
- Last Updated: 11/05/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is located in the overall Sunnyvale Storm Drainage Improvement Project (SDIP) area. The scope of work for the Tyndale Avenue project includes replacing a corrugated metal pipe between Tyndale Avenue and Chandworth Road. Replacement of the system is needed to address reported house flooding in the immediate area. The upgrade to the system also allows for the construction of the upstream improvements currently in design from the Storm Water’s queue that will address seven requests for service of failing infrastructure and flooding requests. Approximately 500 linear feet of 48-inch to 66-inch corrugated pipe will need to be replaced to address the undersized and deteriorating system in the Severn Avenue project area.
In Development
Aviation / Construction
D/E Connector (DECO) Expansion Project
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16376
- Anticipated Posting Date: 2025-02-03
- Last Updated: 11/05/24
The Project includes the renovation of the existing Concourses D & E Connector (DECO) and a building addition, totaling approximately 160,000 SF which includes:
- Providing a service area at the Ramp Level to accommodate operational needs per the project program including freight, service and passenger elevators, concessions and club loading docks, and airport storage while maintaining current traffic patterns.
- Repositioning and increasing the area of the major passenger circulation route of the D/E connector from the Atrium to the end of the moving walkways at the approach of Concourse D.
- Relocating the existing airline club space from the Departures Level to a new Mezzanine Level location providing approximately 40,000sf for the new club.
- Providing a new passenger destination and experience at the Departures Level approximately 51,000sf of new concessions and office space.
- Providing a new Roof Level mechanical penthouse of approximately 9,000sf.
- Relocating and upgrading utilities and jet fuel system impacted by the project.
- Coordinating with the Terminal Life Safety project for egress, fire sprinklers, and voice evacuation
- Accommodating the Terminal Operations, requiring coordination of Construction Activities as a 2nd priority to Passenger, Airline, Concession and Facility Operations.
- Providing new signage and wayfinding, aligning with current CLT standards.
- Providing a right of way for a future sterile corridor passing through the DECO project extents. Access to each end of the corridor will be provided under a separate project.
It is anticipated that the project will follow the City of Charlotte sustainability requirements and will be pursuing a Green Globes Certification. It is anticipated that a Construction Manager will participate in Green Globe Project Survey and provide services required to achieve the Construction Activity Participation.
Project Schedule
Design and Preconstruction Services: May, 2024 through May, 2025
Permitting Phase: May 2025 through August, 2025
CMAR Bidding and GMP Reconciliation Phase: August, 2025 through December, 2025
Construction Phase: January, 2026 through January, 2028
Project Delivery Method Selected and Justification
The project will deliver new cabinets through a Design-Bid-Build project delivery method. This method will provide the airport with the most cost-effective solution for installing 155 new AEDs cabinets. It will also standardize signage, locations, and AED types across the entire airport campus.
In Development
Aviation / Construction
4th Parallel Runway Package 3: Parallel Taxiway and NAVAIDS
- Posting Number: 2025-Q2(Apr-Jun)-AVI-12922
- Anticipated Posting Date: 2025-04-22
- Last Updated: 11/05/24
As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.
To support CLT’s Fourth Parallel Runway Program, this project will also include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure. The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.
In Development
Charlotte Area Transit System / Commodities & Goods
CATS Mobile Town Hall Vehicle Upfit
- Posting Number: 2025-Q2(Apr-Jun)-CATS-15049
- Anticipated Posting Date: 2025-06-30
- Last Updated: 11/04/24
This vehicle upfit will serve as a mobile town hall for community events and will be available for use by all city departments. CATS will have first priority given the role CATS has served in bringing this mobile town hall to life.
PSR # 1729
In Development
Department of General Services / Construction
Morris Field Bridge Replacement
- Posting Number: 2025-Q2(Apr-Jun)-DGS-8971
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/28/24
This project will replace the bridge on Morris Field Drive between Wilkinson Boulevard and Golf Acres Drive, over the Norfolk Southern Railroad.
In Development
Department of General Services / Construction
DeArmon Road Improvements Project
- Posting Number: 2026-Q2(Apr-Jun)-DGS-5221
- Anticipated Posting Date: 2026-04-01
- Last Updated: 10/28/24
The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
In Development
Department of General Services / Construction
Monroe Road Streetscape
- Posting Number: 2025-Q2(Apr-Jun)-DGS-8925
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/28/24
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
In Development
Department of General Services / Construction
Central Kilborne Norland Intersection & Street Upgrade
- Posting Number: 2025-Q3(Jul-Sep)-DGS-8945
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/28/24
Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.
In Development
Department of General Services / Construction
Brown Grier Road Upgrades
- Posting Number: 2026-Q3(Jul-Sep)-DGS-8941
- Anticipated Posting Date: 2026-07-01
- Last Updated: 10/28/24
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
In Development
Department of General Services / Construction
Prosperity Church Road (Old Ridge to Benfield) Improvements
- Posting Number: 2024-Q4(Oct-Dec)-DGS-9862
- Anticipated Posting Date: 2024-11-12
- Last Updated: 10/28/24
The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.
In Development
Department of General Services / Construction
Idlewild Road/Rama Road/Monroe Road Intersection
- Posting Number: 2025-Q3(Jul-Sep)-DGS-8922
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/28/24
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
In Development
Charlotte Storm Water Services / Construction
Collective V (Multiple Isolated Storm Drainage Improvements Projects)
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-9970
- Anticipated Posting Date: 2024-11-27
- Last Updated: 10/28/24
This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.
In Development
Department of General Services / Construction
Monroe Road Multi Use Path (MUP)
- Posting Number: 2025-Q1(Jan-Mar)-DGS-9854
- Anticipated Posting Date: 2025-01-01
- Last Updated: 10/27/24
The purpose of this project is to provide safer pedestrian conditions along Monroe Road from Eaton Road to McCullen Way. Currently, there are two active city projects in the vicinity of this project. This MUP will fill a key gap between these two projects, providing a safer and more connected route for pedestrians and cyclists.
In Development
Department of General Services / Construction
Shamrock Drive Complete Street
- Posting Number: 2025-Q3(Jul-Sep)-DGS-9860
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/27/24
Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.
In Development
Charlotte Storm Water Services / Construction
Wheeler 6301 Storm Water Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-8351
- Anticipated Posting Date: 2024-12-27
- Last Updated: 10/27/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Water / Architectural / Engineering Services
McAlpine Preliminary and Primary Treatment Reliability
- Posting Number: 2025-Q1(Jan-Mar)-CW-14159
- Anticipated Posting Date: 2025-01-17
- Last Updated: 10/27/24
This project provides design services to Charlotte Water. The project involves rehabilitation of Preliminary and Primary Treatment Facilities. Facilities generally include headworks, flow equalization basins, primary clarifiers, and gravity thickeners. A facilities evaluation, conducted by the design team, will determine the final scope of work.
In Development
Charlotte Area Transit System / General Services
CATS Facilities General Maintenance and Repair Services
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16174
- Anticipated Posting Date: 2024-12-10
- Last Updated: 10/27/24
CATS is looking to contract general maintenance and repair services for various mechanical and electrical systems. Contractor will need to be available at all times on an on-call basis. Preventative services, along with routine maintenance and repair, are required.
PSR # 1783
In Development
Charlotte Area Transit System / General Services
FTA 5310 FY23 Call for Projects
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16177
- Anticipated Posting Date: 2024-12-10
- Last Updated: 10/27/24
The Charlotte Area Transit System is seeking contractors for the U.S. Department of Transportation Federal Transit Administration Enhanced Mobility of Seniors and Individuals with Disabilities Grant Program (Section 5310). Section 5310 funds are available for capital and operating expenses to support transportation projects that meet the special transportation needs of seniors (individuals 65 years and older) and individuals with disabilities. All projects must be situated in the Charlotte-Mecklenburg Urbanized area and must be derived from the Coordinated Human Services Transportation Plan for the Charlotte Urbanized Area (FY2022-FY2027).
PSR # 1785
In Development
Charlotte Area Transit System / General Services
CATS On-Call Doors, Locks, Hardware Install & Repair
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16094
- Anticipated Posting Date: 2024-12-07
- Last Updated: 10/27/24
The Charlotte Area Transit System (CATS) anticipates contracting out the repair, installation, and supply of interior and exterior doors, locks, and hardware. CATS is responsible for security and controlled entry for a variety of municipal facilities, structures and assets with a range of uses including office, warehouse, storage, parking, and vehicle maintenance facilities. CATS operates on a 24/7/365 basis and requires 24-hour emergency repair services, as well as the ability to provide additions and alterations to existing and new locations on an ongoing basis.
PSR # 1780
In Development
Charlotte Area Transit System / General Services
CATS Pump Station Pit Cleaning
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16098
- Anticipated Posting Date: 2024-12-07
- Last Updated: 10/27/24
Pump Station Pit Cleaning and disposal services in Charlotte Area Transit System (CATS). The selected contractor will be responsible for the annual, optional, and emergency cleaning, removal, and disposal of material from pump station pits across various CATS Facilities. The scope of work includes specific equipment, safety, and disposal requirements.
PSR # 1781
In Development
Charlotte Area Transit System / General Services
CATS Buildings Roof Maintenance & Repair
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16077
- Anticipated Posting Date: 2024-12-03
- Last Updated: 10/27/24
The Charlotte Area Transit System is responsible for maintaining a portfolio of approximately (44) facilities, including Administrative Offices, Maintenance Facilities, Park & Ride Facilities, Light Rail Facilities and offices, equipment shops, Parking Decks, Power Stations, Transit Power Sub- stations, etc.
Contractor shall inspect and maintain CATS owned building roof systems, provide minor roof repairs to prevent roof system leakage, take digital photos, and provide a report on each system.
PSR # 1778
In Development
Charlotte Area Transit System / General Services
HVAC REPAIR SERVICES
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16057
- Anticipated Posting Date: 2024-11-30
- Last Updated: 10/27/24
The Company shall provide repair Services for HVAC systems at all
Charlotte Area Transit System Facilities. Repair services shall be
comprehensive of all tasks necessary to ensure HVAC systems regain
operational status at their established capacity and efficiency. Original Equipment Manufacturer (OEM) standards shall be followed, including reference to capacity and efficiency ratings. Charlotte Area Transit System has several different types and sizes of HVAC systems located throughout the City of Charlotte.
PSR # 1766
In Development
Charlotte Area Transit System / General Services
CATS ANNUAL BOILER MAINTENANCE & REPAIR SERVICES
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16059
- Anticipated Posting Date: 2024-11-30
- Last Updated: 10/27/24
This is a contract that will provide for preventative maintenance and repair for (8) AERCO boiler equipment at the CATS South Tryon Maintenance Facility Complex and CATS South Boulevard Light Rail Vehicle Maintenance Facility. This equipment can only be serviced by AERCO certified technicians with access to proprietary parts.
PSR # 1769
In Development
Charlotte Area Transit System / General Services
Hoist and Crane Repair, Services, and Training
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16053
- Anticipated Posting Date: 2024-12-30
- Last Updated: 10/27/24
The general scope of the offered three-year (3 years) contract shall
be to perform basic OSHA inspections, safety inspections, full·
service preventive maintenance, repairs of Its hoist and crane
equipment, and training.
PSR # 1761
In Development
Charlotte Storm Water Services / Construction
Thermal Culvert Storm Drainage Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-8345
- Anticipated Posting Date: 2024-12-17
- Last Updated: 10/23/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Elvis Storm Drainage Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-5447
- Anticipated Posting Date: 2024-12-17
- Last Updated: 10/23/24
This project consists of two culverts in series under Cedarbrook Drive and Denbur Drive. Both culvert crossings consist of triple barrel corrugated metal pipe systems. This is a project that was identified by the asset management team and both culvert crossings are actively failing, and preliminary calculations show that the culverts are also undersized.
In Development
Charlotte Storm Water Services / Construction
Dry Detention Water Quality Enhancement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-15863
- Anticipated Posting Date: 2024-12-17
- Last Updated: 10/23/24
This project includes constructing forebays to increase pretreatment of solids and create sheet flow through the basin, removing and replacing of existing turf grass in the bottom of the basins with a hardier herbaceous vegetative mix that provides more treatment, and modification of outlet structures of basins that increase retention time within the basins to increase pollutant removal.
In Development
Charlotte Storm Water Services / Construction
Ideal Way 816 Storm Drain Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-7060
- Anticipated Posting Date: 2024-12-17
- Last Updated: 10/23/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Water / Commodities & Goods
Water Treatment Polymer Trials
- Posting Number: 2025-Q1(Jan-Mar)-CW-15475
- Anticipated Posting Date: 2025-01-09
- Last Updated: 10/22/24
The scope of this Invitation to Bid (ITB) is to establish a contract for the purchase, delivery, and other inherently related activities of liquid emulsion polymer for solids dewatering for Charlotte Water’s Franklin WTP in compliance with the specifications and terms and conditions set forth in this ITB.
Polymer Trials will take place prior to receiving bids for the polymer. All Products and parts furnished under the Contract shall be new, shall comply with the specifications and terms and conditions set forth in this ITB, and shall operate in full compliance with the Specifications.
In Development
Aviation / General Services
Integrated Pest Management Services
- Posting Number: 2025-Q3(Jul-Sep)-AVI-15207
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/22/24
The Airport is seeking a qualified company to provide Integrated Pest Management (IPM) services. The company must supply all necessary supervision, labor, materials, tools, supplies, equipment, transportation, and applicable licenses and permits required to perform these services at CLT. CLT’s IPM program is defined as a comprehensive approach to preventing and solving pest issues through education, inspection, identification, sanitation, exclusion, communication, biological and mechanical controls, and, when appropriate, targeted applications. IPM services must be conducted in a way that ensures the health and well-being of both the public and airport personnel. The company is also responsible for removing and disposing of all dead pests covered under this contract. The job site includes approximately 2 million square feet of interior facilities, multiple on-property buildings, CLT buses, and parking lots.
In Development
Charlotte Area Transit System / General Services
CATS Facilities Unit Paving and Repair
- Posting Number: 2024-Q4(Oct-Dec)-CATS-16172
- Anticipated Posting Date: 2024-12-10
- Last Updated: 10/21/24
Charlotte Area Transit System (CATS) is looking to contract out unit paving and repair services focusing on the following:
- Clay brick pavers along sidewalks within public right of ways
- Precast concrete pavers at Light Rail Station as shown on the plans, as well
as at CATS Bus Stops and Facilities - Precast truncated dome pavers at all accessible ramp areas as indicated by
CATS Management. - Replacement units where needed and as indicated by CATS
Management
PSR # 1782
In Development
Charlotte Department of Transportation / Technology Goods & Services
Big Data Transportation Services
- Posting Number: 2025-Q1(Jan-Mar)-CDT-16233
- Anticipated Posting Date: 2025-01-01
- Last Updated: 10/21/24
Cloud-based current and historical transportation data with an interactive dashboard for the three-county CRTPO region. It should include at minimum origin-destination flow data, trip characteristics and metrics, speed and travel time data, congestion data, and traffic volumes, and it should provide this data by time of day and for personal vehicles, commercial trucks, transit, and non-motorized modes.
CRTPO: Charlotte Regional Transportation Planning Organization
In Development
Aviation / Construction
Concourse A Modifications
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16193
- Anticipated Posting Date: 2025-02-25
- Last Updated: 10/18/24
This Project aims to modify and relocate existing equipment, replace tables, add an experiential element, and extend tenant services at the Charlotte Douglas International Airport. The modifications of the existing equipment will accommodate a dual-use system at each Gate Counter including the electrical and data infrastructure leading up to the network. There will be a Flight Information Display System” that will need to be relocated in the connecting corridor which includes structural attachments to the building and repairs to the existing Terrazzo. Work hours between 2300 – 0500 EST to prevent disruption to Airport Operations. This project will require 100% badging for all workers. |
In Development
Aviation / Construction
Concourse E – Phase 10
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16195
- Anticipated Posting Date: 2025-02-25
- Last Updated: 10/17/24
Add a small addition onto concourse E of approximately 4,350-7,150sf for offices. Base bid will be a 4,350sf addition with 2ea add alternates to add a 1,400sf bay/ea alternate for a potential maximum of 7,150sf. This area to be shell space, divided into 2 separate tenant spaces. Divider wall will be designed and installed to separate the two separate tenant spaces. Location of proposed addition is on the west side of concourse E between the employee turnstile and aircraft envelope E4.
In Development
Department of General Services / Construction
LaSalle Street/Beatties Ford Road Intersection Improvements
- Posting Number: 2025-Q1(Jan-Mar)-DGS-14208
- Anticipated Posting Date: 2025-01-01
- Last Updated: 10/17/24
Install decorative crosswalks (interconnected preformed thermoplastic), milling and resurfacing, and pavement markings.
In Development
Department of General Services / Construction
Solid Waste EVSE
- Posting Number: 2024-Q3(Jul-Sep)-DGS-14486
- Anticipated Posting Date: 2024-08-01
- Last Updated: 10/11/24
In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The Solid Waste facility currently contains many refuse collection vehicles that are run on gasoline. In order to meet the 2030 target, The City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the Solid Waste facility with EV Chargers for refuse collection vehicles.
In Development
Department of General Services / Construction
Sharon Road at Eastburn Road Improvements
- Posting Number: 2026-Q1(Jan-Mar)-DGS-14074
- Anticipated Posting Date: 2026-01-01
- Last Updated: 10/08/24
This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.
In Development
Aviation / Construction
Main Terminal Air Handling Unit Replacements: AHU-6, AHU-49
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16090
- Anticipated Posting Date: 2025-01-15
- Last Updated: 10/08/24
The scope of this project is to replace AHU-6 and AHU-49 with new AHUs. New controls, ductwork, associated VAV’s and piping will be installed as part of a complete unit replacement. Each AHU replacement will require a detailed construction phasing process to ensure limited system downtime. Temporary AHUs will be installed as needed during the equipment replacement.
In Development
Department of General Services / Construction
Margaret Wallace Road Sidewalk (Summerfield Ridge Lane to Marshbrooke ... Margaret Wallace Road Sidewalk (Summerfield Ridge Lane to Marshbrooke Road)
- Posting Number: 2025-Q3(Jul-Sep)-DGS-14166
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/08/24
This project will install a 6′ concrete sidewalk, 8′ planting strip, concrete curb ramps, Pedestrian Refuge Island, concrete driveways, 2′-6″ concrete curb and gutter, storm drainage systems, and street trees along Margaret Wallace Road from Summerfield Ridge Lane to Marshbrooke Road. The project length is 1,900 LF/0.40 miles.
In Development
Department of General Services / Construction
Cross Charlotte Trail (XCLT)− Matheson to Craighead
- Posting Number: 2025-Q2(Apr-Jun)-DGS-14020
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/08/24
The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.
In Development
Department of General Services / Architectural / Engineering Services
Construction Manager at Risk for Robinson Church Road Phase 2
- Posting Number: 2025-Q1(Jan-Mar)-DGS-15753
- Anticipated Posting Date: 2025-01-01
- Last Updated: 10/08/24
CMAR (aka CMGC) Services
The project is in the early stages of the design phase. A CMAR will bring value in determining the most cost-effective alignment and provide potential construction phasing options, thereby minimizing schedule risks and constructability concerns.
In Development
Department of General Services / Construction
Rea Road Widening (I-485 to Williams Pond Lane)
- Posting Number: 2025-Q3(Jul-Sep)-DGS-14168
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/08/24
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
In Development
Department of General Services / Construction
University City Blvd Pedestrian Crossings
- Posting Number: 2026-Q3(Jul-Sep)-DGS-14167
- Anticipated Posting Date: 2026-07-01
- Last Updated: 10/08/24
This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347
In Development
Department of General Services / Construction
Belk Greenway Connector
- Posting Number: 2026-Q1(Jan-Mar)-DGS-15892
- Anticipated Posting Date: 2026-01-01
- Last Updated: 10/08/24
Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.
In Development
Department of General Services / Construction
North Tryon St Left Turn Lane at University City Blvd
- Posting Number: 2025-Q3(Jul-Sep)-DGS-14215
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/08/24
The purpose of this project is to improve traffic flow on North Tryon Street by extending the left turn lane. This project will include lane widening, drainage and pavement markings.
In Development
Department of General Services / Construction
Arrowood at Whitehall Commons Intersection
- Posting Number: 2026-Q2(Apr-Jun)-DGS-15966
- Anticipated Posting Date: 2026-04-01
- Last Updated: 10/08/24
This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.
In Development
Department of General Services / Construction
7th Street Parallel Bike Routes
- Posting Number: 2026-Q1(Jan-Mar)-DGS-14170
- Anticipated Posting Date: 2026-01-01
- Last Updated: 10/08/24
This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.
In Development
Aviation / Construction
CEP Chiller 5 Expansion
- Posting Number: 2025-Q1(Jan-Mar)-AVI-16092
- Anticipated Posting Date: 2025-01-15
- Last Updated: 10/08/24
The scope of this project is to connect one 2000-ton chiller (owner furnished and set on equipment pad) and corresponding mechanical equipment to the CEP. The addition of the chiller will also include the installation of one 2000-ton rooftop cooling tower, one chilled water pump, removal of existing filtration systems, new side filtration skids, and one condenser water pump. Existing structure and piping will be extended as needed to accommodate the installation of the listed equipment.
In Development
Department of General Services / Architectural / Engineering Services
Urban Design and Grant Writing
- Posting Number: 2024-Q4(Oct-Dec)-DGS-15251
- Anticipated Posting Date: 2024-10-30
- Last Updated: 10/08/24
This selection will consist of two separate types of work. The general scope of work for each generally includes:
Urban Design Services
The urban design services may be used for multiple projects and will be a task order-based agreement. This selected consultant(s) will support the city by providing services that encompass planning, economic development urban design, historic preservation and placemaking. Projects will range in scope and size.
Grant Preparation Services
The city has applied for various state and federal grants (SS4A, RAISE, etc.) and is looking for consultant(s) to provide assistance with grant preparation services for future applications. The selected consultants will be expected to lead the effort in coordination with city staff to provide all services needed to apply for various state and federal grants. It is anticipated that multiple consultants may be selected for this task.
In Development
Department of General Services / Construction
Remount Road and West Boulevard Intersection Improvements
- Posting Number: 2026-Q1(Jan-Mar)-DGS-14084
- Anticipated Posting Date: 2026-01-01
- Last Updated: 10/08/24
The project consists of intersection improvements at Remount Rd and West Blvd including sidewalks, curb and gutter, decorative pavers, bus shelters with amenities, pedestrian-scale lighting, crosswalks, curb ramps, pedestrian crossing signalization, and landscaping.
In Development
Department of General Services / Construction
Firehouse # 46 Infill Station at Miranda Road
- Posting Number: 2025-Q2(Apr-Jun)-DGS-14397
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/08/24
A new infill firehouse will be designed and constructed at 4032 Miranda Road to alleviate high call volumes and meet response time standards in the area. The firehouse will reflect the design of Firehouse #45, a 3-bay, 2-story firehouse programmed for approximately 14,600 square feet. The proposed facility will be located at the corner of Beatties Ford Road. Parcel #03741123 is approximately 6.54 acres. This location and site selection meets the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
Wharton-Smith has been awarded CMAR services and is working on prequalifying subcontractors for the project.
In Development
Charlotte Mecklenburg Police Department / General Services
CMPD Undercover Leased Vehicle Services
- Posting Number: 2024-Q4(Oct-Dec)-CMPD-10649
- Anticipated Posting Date: 2024-11-15
- Last Updated: 10/02/24
The City will issue a Request for Proposal (RFP) to select a vendor to provide leased vehicle services. The Company shall Maintain and make available a fleet of new Vehicles in various categories, given turnover and other requirements as is necessary to maintain confidentiality of CMPD Officers. These vehicles are used primarily by the Vice and Narcotics, and Gang Units in the specialized undercover investigations. Leasing Vehicles enables Police to rapidly switch out a vehicle if it is identified as an undercover car.
In Development
Aviation / Commodities & Goods
Badge, Credential Stock and other related items
- Posting Number: 2025-Q1(Jan-Mar)-AVI-14770
- Anticipated Posting Date: 2025-01-15
- Last Updated: 10/02/24
CLT Airport shall purchase miscellaneous items for re-stocking of badges and credential items including but not limited to badge holders and clips, printer and inline laminating supplies and badges.
In Development
Charlotte Department of Transportation / Technology Goods & Services
Curb Management Technology Platform
- Posting Number: 2025-Q2(Apr-Jun)-CDT-13764
- Anticipated Posting Date: 2025-06-30
- Last Updated: 09/25/24
Curbside Management technology solutions to assist in creating a digital inventory of the Uptown Charlotte curb, analyze and monitor the curb, and/or deploy intelligent sensor-based infrastructure to assess curb usage and demands.
In Development
Aviation / Construction
CLT Center Storm Drainage Project
- Posting Number: 2025-Q2(Apr-Jun)-AVI-10761
- Anticipated Posting Date: 2025-06-30
- Last Updated: 09/25/24
This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC. The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot. The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.
In Development
Charlotte Area Transit System / General Services
CATS Commercial Container Waste Management Collection
- Posting Number: 2024-Q4(Oct-Dec)-CATS-15987
- Anticipated Posting Date: 2024-12-20
- Last Updated: 09/25/24
Waste Removal and Container Rental Services – The Company shall provide Charlotte Area Transit System with collection of disposal services for its non-hazardous waste and cardboard recyclables and provides rental containers at (5) Charlotte Area Transit System locations throughout Mecklenburg County. The Company is responsible for providing container rental, waste collection and disposal services of Waste and Recyclables for Charlotte Area Transit System. Each location may have multiple waste container requirements and service requirements.
PSR # 1757
In Development
Charlotte Department of Transportation / Technology Goods & Services
Curb Management Infrastructure
- Posting Number: 2025-Q2(Apr-Jun)-CDT-13767
- Anticipated Posting Date: 2025-06-30
- Last Updated: 09/25/24
Technology solutions to assist the Charlotte team in creating a digital inventory of the Uptown Charlotte curbs and deploying intelligent sensor-based infrastructure to assess curb usage and demands.
In Development
Charlotte Department of Transportation / Technology Goods & Services
Micromobility Technology Platform
- Posting Number: 2025-Q2(Apr-Jun)-CDT-13769
- Anticipated Posting Date: 2025-06-30
- Last Updated: 09/25/24
Micromobility technology solutions to assist in analyzing and managing shared mobility devices within Charlotte’s right-of-way.
In Development
Charlotte Area Transit System / General Services
CATS Paratransit ADA Overflow
- Posting Number: 2025-Q1(Jan-Mar)-CATS-11290
- Anticipated Posting Date: 2025-03-01
- Last Updated: 09/25/24
The Charlotte Area Transit System (CATS) is seeking a Company to perform Americans with Disability Act (ADA) required complementary paratransit passenger service to augment the existing Special Transportation Service (STS). The Company will meet all Department of Transportation (DOT) Federal
Transit Administration (FTA) and ADA requirements in the safe and efficient service of the assigned passengers.
In accordance with the ADA, CATS offers complementary paratransit services to individuals who, because of a disability (physical, cognitive, or visual), cannot access fixed routes buses. The ADA defines eligibility for complementary Paratransit service in 49 CFR Section 37.123 of the federal regulations.
CATS operates the paratransit system, which is a pre-scheduled, shared-ride, origin to destination service.
This is a nonexclusive agreement. CATS reserves the right to certify other eligible private transportation service companies that apply to participate in the Program.
The term “customer” shall refer to CATS applicants and/or existing CATS clients and their companions or Personal Care Attendants (PCA). The term “CATS Transit System” shall refer to both CATS’ accessible fixed route bus and CATS’ accessible light rail.
The Company shall be responsible for transporting CATS paratransit eligible customers in accordance with the ADA. Disability alone does not determine paratransit eligibility; the decision is based on the customer’s functional ability to use the fixed-route bus and is not a medical decision.
CATS service area is 741 sq. miles and paratransit service consists of over 5,000 eligible passengers and 2,500 active passengers with at least one ride in past 12 months. With currently 700+ scheduled rides per weekday and 200+ on weekends. 25% of trips scheduled involve a customer with a mobility device. As the COVID-19 pandemic ridership is returning to pre-pandemic levels
While the City is flexible with respect to certain elements of the Special Transportation Services (STS) ADA Paratransit Services, the City has specific requirements and preferences for the Service delivery method.
PSR #1510
In Development
Aviation / Architectural / Engineering Services
ASR and Center Lighting Vault Relocation
- Posting Number: 2025-Q1(Jan-Mar)-AVI-8874
- Anticipated Posting Date: 2025-01-01
- Last Updated: 09/20/24
The Center Lighting Vault Relocation Project will relocate the existing lighting vault, located at the Mid-Field area at CLT Airport to a new proposed location. The project will consist of site work, building work, site utilities, and airfield lighting circuitry.
The selected Final Design Engineer or Engineer of Record (EOR or Consultant) will produce Construction Documents to be issued for competitive bidding of one or multiple construction packages, followed by Conformed or Released for Construction Plans issued to the responsive or responsible bidder for Construction. The design and documents are to be based on Preliminary Design or bridging documents prepared by the Owner’s Master Civil Engineer (Aviation Consulting Engineers, LLC, or ACE). The Preliminary Design effort will include completion of the Design Geotechnical Subsurface Investigation, preliminary design plans to a 30% level of completion, pavement design, and preliminary surveys. Final Design surveys, including pavement tie-ins, etc. will be the responsibility of the Consultant.
In Development
Charlotte Department of Transportation / Construction
Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)
- Posting Number: 2025-Q3(Jul-Sep)-CDT-8628
- Anticipated Posting Date: 2025-09-01
- Last Updated: 09/20/24
This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also includes fiber optic cable splicing, testing, Ethernet communications equipment, traffic management camera equipment and other related activities.
In Development
Charlotte Fire Department / Commodities & Goods
CCPA Firefighting Turnout Gear
- Posting Number: 2025-Q1(Jan-Mar)-CFD-15861
- Anticipated Posting Date: 2025-01-06
- Last Updated: 09/17/24
The City of Charlotte and Participating Public Agencies are seeking bids from qualified vendors for the supply of high-quality firefighting turnout gear. This turnout gear is essential for the safety and effectiveness of the firefighting personnel. We are seeking vendor who can provide durable and reliable turnout gear that will provide protection to the upper and lower body, excluding head, hands, and feet against adverse environmental effects during structural firefighting. All material and construction of turnout gear MUST meet or exceed NFPA standard #1971 – current edition and OSHA requirements for fire fighter protective clothing.
In Development
Strategy & Budget / General Services
Municipal Services Districts Administration RFP
- Posting Number: 2024-Q4(Oct-Dec)-SB-15281
- Anticipated Posting Date: 2024-10-01
- Last Updated: 09/17/24
The City has defined and established five (5) Municipal Service Districts (“MSD”). These partnerships extend the City’s capacity to address strategic priorities and concerns of the community, including but not limited to:
-
- Partnerships due to special legislation (such as tax allocations);
- Partnerships that support the City Council’s five strategic Focus Areas for the City (Community Safety, Economic Development & Global Competitiveness, Environment, Housing & Neighborhood Development, and Transportation & Planning); and
- Partnerships that contribute to community enrichment.
The City is seeking a Company or Companies to provide Municipal Service District Services for each of the existing 5 MSDs. Companies may choose to propose for services on one (1) or more MSDs, and the City shall contract individually for each MSD with the Company best meeting the City’s needs. Companies are coordinated by the Office of Strategy & Budget
In Development
Aviation / Architectural / Engineering Services
Concourse C Expansion (Design)
- Posting Number: 2025-Q1(Jan-Mar)-AVI-13246
- Anticipated Posting Date: 2025-03-31
- Last Updated: 09/04/24
Airport will seek qualifications for Architecture/Engineering consultant services for the expansion of Concourse C. The project will develop approximately 300,000 square feet with up to 16 aircraft boarding gates. Services will include concept development (including architectural planning and site planning), schematic design, design development, contract documents, bidding services, and construction administration.
In Development
Department of General Services / General Services
Vehicle Accessories and Up-fitting
- Posting Number: 2025-Q3(Jul-Sep)-DGS-15729
- Anticipated Posting Date: 2025-08-01
- Last Updated: 09/04/24
The City of Charlotte requires qualified light vehicle dealers and general service providers to work in conjunction with the Fleet Management Division to support the city’s various up-fitting needs including but not limited to window tenting, bed liner installing, lift gates, and truck bed shells.
In Development
City Wide, Department of General Services / General Services
General Vehicle Collision Repair Services
- Posting Number: 2025-Q4(Oct-Dec)-CTW-15735
- Anticipated Posting Date: 2025-12-02
- Last Updated: 09/04/24
The City requires qualified service providers to work in conjunction with the City’s Fleet Management staff to perform complete turnkey collision repairs and related services on city fleet and Mecklenburg County vehicles. Collision repairs may include but are not limited to paint and body work, frame, cooling systems, engine components, transmission, steering, and related part repairs or replacement.
In Development
Aviation, Department of General Services / General Services
Vehicle and Equipment Welding and Related Services
- Posting Number: 2025-Q3(Jul-Sep)-AVI-15731
- Anticipated Posting Date: 2025-07-01
- Last Updated: 09/04/24
The City requires a company to work in conjunction with Fleet Management, the Airport and other city departments to provide Vehicle and Equipment Welding and Related Services to the City of Charlotte. The Company shall perform vehicle or equipment maintenance, repair, and modification through the provision of Vehicle and Equipment Welding and Related services for vehicles and equipment owned, operated, or maintained by the City.
In Development
Department of General Services / General Services
Allison Transmission Repair Services
- Posting Number: 2025-Q2(Apr-Jun)-DGS-15726
- Anticipated Posting Date: 2025-06-03
- Last Updated: 09/04/24
The City’s Fleet Management Division is seeking to establish a relationship with an Allison authorized company to provide transmission services for vehicles and equipment owned by various departments within the City of Charlotte.
In Development
City Wide, Department of General Services / General Services
Light Vehicle Repairs
- Posting Number: 2025-Q1(Jan-Mar)-CTW-15723
- Anticipated Posting Date: 2025-02-15
- Last Updated: 08/28/24
The City of Charlotte requires qualified light vehicle dealers and general service providers to work in conjunction with the Fleet Management Division to support the city’s fleet comprising various makes, model years. The services for this requirement include but are not limited to repair, replacement, maintenance, diagnostic, warranty repair and representation related services for vehicles.
In Development
Charlotte Storm Water Services / Construction
Collective AH (6633 Brookfield Place, 524 Wilby Drive)
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-15660
- Anticipated Posting Date: 2024-12-14
- Last Updated: 08/23/24
524 Wilby Drive: The culvert will be constructed with a headwall and endwall, with the junction box In between. The 24” plastic pipe will be replaced with 24” RCP.
6633 Brookfield Place: 30” RCP from JB 9 to DCB 8 to be replaced with a 36” RCP , and curb to be added along Alexander Road and standard catch basins to be constructed along the curb.
In Development
Aviation / Construction
Aircraft Rescue and Firefighting Facility (ARFF)
- Posting Number: 2025-Q3(Jul-Sep)-AVI-12926
- Anticipated Posting Date: 2025-08-01
- Last Updated: 08/23/24
This project will construct a new Aircraft Rescue and Firefighting Facility (ARFF) at Charlotte Douglas International Airport. The facility will be constructed in a green field site within the airfield. The general scope of the project includes site preparation (grading and drainage), building construction, HVAC, plumbing, asphalt parking lot and roadway paving, electrical, and associated utilities.
In Development
Charlotte Storm Water Services / Construction
Edgewater/Rosecrest Storm Drainage Improvement Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-3465
- Anticipated Posting Date: 2025-08-13
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Magnolia/Winthrop Storm Drainage Improvement Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-15648
- Anticipated Posting Date: 2025-07-28
- Last Updated: 08/21/24
The Magnolia/Winthrop Storm Drainage Improvement Project (SDIP) consists of storm water infrastructure improvements along Ideal Way, Winthrop Avenue and Springdale Avenue. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), traffic control and any other associated work required by the Engineer.
In Development
Charlotte Storm Water Services / Construction
Pella Rd 6212 Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-15642
- Anticipated Posting Date: 2025-02-01
- Last Updated: 08/21/24
Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP. Three non-standard and three standard structures will be removed/replaced as well as two headwalls. 57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed. 70 LF of an 8″ water main will also be relocated.
In Development
Charlotte Storm Water Services / Construction
Faulconbridge Rd 5749 Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-15644
- Anticipated Posting Date: 2025-02-01
- Last Updated: 08/21/24
Project consists of lining 556 LF of 42 inch CMP and 131 LF of 15 inch RCP with CIPP. Eight existing drainage structures will be removed and replaced and two additional structures will be added. 221 LF of 15″ RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approx. 15 locations throughout the 42″ CMP.
In Development
Charlotte Storm Water Services / Construction
Queens Storm Drainage Improvement Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-15633
- Anticipated Posting Date: 2025-07-30
- Last Updated: 08/21/24
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Queens Storm Drainage Improvement Project (SDIP) area.
The Queens Storm Drainage Improvement Project is bordered by East 4th Street to the north, Baxter Street to the south, Caswell Road to the east and Baldwin Avenue to the west. This project area is within a drainage area of approximately 40 acres and the improvements will include pipe system upgrades and channel improvements.
In Development
Charlotte Storm Water Services / Construction
Eastway Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-15631
- Anticipated Posting Date: 2025-02-15
- Last Updated: 08/21/24
The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Eastway Storm Drainage Improvement Project (SDIP) area.
The Eastway Storm Drainage Improvement Project is bordered by Arnold Drive to the north, Central Avenue to the south, Temple Lane to the east and Eastway Drive to the west. This project area is within a drainage area of approximately 200 acres and the improvements may include pipe system upgrades and channel improvements.
In Development
Charlotte Storm Water Services / Construction
Hunter Acres Water Quality Enhancement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-15629
- Anticipated Posting Date: 2024-12-12
- Last Updated: 08/21/24
Dredging of pond forebay, addition of stormwater pipe, and replacement of existing box culverts to address forebay erosion issues at the site.
In Development
Charlotte Storm Water Services / Construction
Hill Street Storm Drainage Improvement Project
- Posting Number: 2026-Q2(Apr-Jun)-CSWS-3451
- Anticipated Posting Date: 2026-04-03
- Last Updated: 08/21/24
The storm drainage improvement project is for the area in and around Hill Street. The construction project boundaries are Tryon Street to the southeast, Trade Street to the northeast, South Cedar Street and West 1st Street to the north, and Palmer Street to the southwest. The project includes storm drainage improvements that reduce house and street flooding or will repair failing infrastructure.
In Development
Charlotte Storm Water Services / Construction
Collective M (Sharon Hills)
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-7054
- Anticipated Posting Date: 2025-01-15
- Last Updated: 08/21/24
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is a collective package of 7 small Storm Drain Improvement projects that will be constructed under one contract. This project package is under review and location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Flintridge Dr (2831) Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3469
- Anticipated Posting Date: 2025-02-08
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Crestmont Drive (4724) Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3471
- Anticipated Posting Date: 2025-01-02
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Storm Water Services / Construction
Fawnbrook Ln (514) Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3475
- Anticipated Posting Date: 2025-02-15
- Last Updated: 08/21/24
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Storm Water Services / Construction
Shamrock Drive Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3459
- Anticipated Posting Date: 2025-01-13
- Last Updated: 08/21/24
This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.
In Development
Charlotte Storm Water Services / Construction
Chatham Storm Drainage Improvement Project
- Posting Number: 2026-Q2(Apr-Jun)-CSWS-5451
- Anticipated Posting Date: 2026-04-14
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Collective Series K Storm Drainage Improvement Project
- Posting Number: 2024-Q3(Jul-Sep)-CSWS-6409
- Anticipated Posting Date: 2024-09-04
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is a collective package of three small storm drain improvement projects that will be constructed under one contract. This project package is under review and location and project details will be provided after review is complete. |
In Development
Charlotte Storm Water Services / Construction
Barrington Drive 5919 Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-7056
- Anticipated Posting Date: 2025-01-15
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Storm Water Services / Construction
Farmer Street/Romare Bearden Storm Drainage Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-8363
- Anticipated Posting Date: 2024-12-16
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is bordered by West Boulevard to the north, Farmer Street the south, Clanton Road to the east and Ross Avenue to the west. The drainage system consists of closed corrugated metal pipe systems underneath City maintained roads. Approximately 3,200 linear feet of 60-inch deteriorated corrugated metal pipe will need to be replaced.
In Development
Charlotte Storm Water Services / Construction
Log Cabin 937 Storm Drainage Improvement Project
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-8371
- Anticipated Posting Date: 2025-05-16
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Riverbend Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-8347
- Anticipated Posting Date: 2025-03-15
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.
In Development
Charlotte Storm Water Services / Construction
Redman Road SDIP
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-9158
- Anticipated Posting Date: 2025-05-04
- Last Updated: 08/21/24
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work will also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.
In Development
Charlotte Storm Water Services / Construction
Rounding Run Storm Drainage Improvement Project
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-8361
- Anticipated Posting Date: 2025-05-04
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Piccadilly Storm Drainage Improvement Project
- Posting Number: 2026-Q1(Jan-Mar)-CSWS-8365
- Anticipated Posting Date: 2026-03-15
- Last Updated: 08/21/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
Collective W (Multiple Isolated Storm Drainage Improvements Projects)
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-9972
- Anticipated Posting Date: 2025-01-15
- Last Updated: 08/21/24
This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage replacement and sewer relocations within the street right-of-way and private, residential properties.
In Development
Charlotte Storm Water Services / Construction
Foxrun/Burtonwood Storm Drainage Improvement Project
- Posting Number: 2025-Q4(Oct-Dec)-CSWS-9838
- Anticipated Posting Date: 2025-11-03
- Last Updated: 08/21/24
This project is bordered by Rama Road to the north, McAlpine Creek to the south, Monroe Road to the east and Burlwood Road to the west. The drainage system consists of open channel and closed pipe systems underneath City maintained roads. This was previously identified as a major capital project from the watershed ranking prioritization process with a score of 54 of 100. The ranking protocol identifies 30 structures that experience flooding in the 100-year storm event and 16 roads that experience transverse overtopping events that do not meet current standards. A holistic project is needed to cost beneficially address the drainage system issues.
In Development
Charlotte Storm Water Services / Construction
Collective X (Multiple Isolated Storm Drainage Improvements Projects)
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-11749
- Anticipated Posting Date: 2025-01-02
- Last Updated: 08/21/24
This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage replacement and sewer relocations within the street right-of-way and private, residential properties.
In Development
Charlotte Storm Water Services / Construction
Collective AG Storm Water Drainage Improvement Project
- Posting Number: 2024-Q4(Oct-Dec)-CSWS-13371
- Anticipated Posting Date: 2024-12-15
- Last Updated: 08/21/24
Collective Storm Drainage Improvement Projects Series AG will involve 2 projects throughout the City of Charlotte, 1845 Pinewood Cr and 6009 Rexwood Pl. 1845 Pinewood Cr will consist of reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, and new watermain. 6009 Rexwood Pl will consist of reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, and concrete driveway.
In Development
Charlotte Water / Construction
Belmont Force Main Construction
- Posting Number: 2025-Q2(Apr-Jun)-CW-12289
- Anticipated Posting Date: 2025-04-15
- Last Updated: 08/21/24
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
In Development
Charlotte Water / Construction
Belmont Pump Station Construction
- Posting Number: 2025-Q2(Apr-Jun)-CW-12294
- Anticipated Posting Date: 2025-04-15
- Last Updated: 08/21/24
This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
In Development
Charlotte Water / Construction
Belmont Horizontal Directional Drilling Construction
- Posting Number: 2025-Q2(Apr-Jun)-CW-12291
- Anticipated Posting Date: 2025-04-15
- Last Updated: 08/21/24
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.
In Development
Charlotte Water / Construction
FY26 Large Service Contract #1
- Posting Number: 2025-Q3(Jul-Sep)-CW-12283
- Anticipated Posting Date: 2025-09-01
- Last Updated: 08/21/24
This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.
In Development
Charlotte Water / Construction
Lift Station Improvements Phase III
- Posting Number: 2025-Q2(Apr-Jun)-CW-12263
- Anticipated Posting Date: 2025-06-17
- Last Updated: 08/21/24
Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.
In Development
Charlotte Water / Construction
FY24 Water Main Replacement – Contract 1
- Posting Number: 2025-Q3(Jul-Sep)-CW-13336
- Anticipated Posting Date: 2025-08-20
- Last Updated: 08/21/24
This contract will consist of an undetermined number of individual projects consisting of water and/or sewer replacements, water and/or sewer extensions, and water distribution system reliability improvement projects, which will be assigned by the Project Engineer.
In Development
Charlotte Water / Architectural / Engineering Services
Upper Little Sugar Creek Interceptor Design
- Posting Number: 2025-Q3(Jul-Sep)-CW-12252
- Anticipated Posting Date: 2025-08-15
- Last Updated: 08/21/24
Design of Upper Little Sugar Creek Interceptor (at least Phase 1 from Wastewater Treatment Plant to East Boulevard). The complete project extends from Sugar Creek Wastewater Treatment Plant to Sugar Creek Rd.
In Development
Aviation / Construction
Asphalt Shoulder Rehabilitation-Phase II
- Posting Number: 2025-Q2(Apr-Jun)-AVI-13449
- Anticipated Posting Date: 2025-04-30
- Last Updated: 08/14/24
As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.
In Development
Charlotte Department of Transportation / General Services
2024 NBIS Bridge Inspection – Non-Qualifying
- Posting Number: 2025-Q3(Jul-Sep)-CDT-13548
- Anticipated Posting Date: 2025-07-01
- Last Updated: 08/14/24
Part of the Federal Highway Administration (FHWA) mandates that bridges and culverts are inspected every two years. Bridges are inspected for structural adequacy, safety, and functionality.
In Development
Aviation / Commodities & Goods
Airfield Deicing Chemicals
- Posting Number: 2025-Q1(Jan-Mar)-AVI-12908
- Anticipated Posting Date: 2025-03-03
- Last Updated: 08/08/24
Provide airport with liquid and solid deicing chemicals during inclement winter weather events. Liquid and solid deicing chemicals are used throughout the facility to treat surfaces to minimize the formation of ice.
In Development
Aviation / Commodities & Goods, General Services
Water Treatment Chemical Services
- Posting Number: 2025-Q4(Oct-Dec)-AVI-14865
- Anticipated Posting Date: 2025-10-07
- Last Updated: 08/08/24
The scope of this contract shall be to provide water treatment chemicals
and to furnish all professional services and expertise to operate a water treatment chemical program
In Development
Charlotte Department of Transportation / Construction
2024 NBIS Bridge Inspection Program -Qualifying
- Posting Number: 2025-Q3(Jul-Sep)-CDT-13528
- Anticipated Posting Date: 2025-07-01
- Last Updated: 08/07/24
Part of the Federal Highway Administration (FHWA) mandates that bridges and culverts are inspected every two years. Bridges are inspected for structural adequacy, safety, and functionality.
The City Council will seek contracts for the design and construction of needed repairs related to bridge inspection contracts.
In Development
Charlotte Storm Water Services / Construction
Zone 3 Stomwater and Site Improvements
- Posting Number: 2024-Q3(Jul-Sep)-CSWS-12300
- Anticipated Posting Date: 2024-08-01
- Last Updated: 07/25/24
This construction will improve site conditions at the Zone 3 Field Operation facility. Construction work will include stormwater settling basins, stormwater conveyance, and various site improvements. The design is already complete.
In Development
Finance / General Services
Long Term Investment Program (LTIP) Investment Consulting Services RFP ... Long Term Investment Program (LTIP) Investment Consulting Services RFP
- Posting Number: 2024-Q3(Jul-Sep)-FN-15115
- Anticipated Posting Date: 2024-08-15
- Last Updated: 07/16/24
The purpose of this solicitation is to select an investment consultant (Company) that will partner with the City of Charlotte to provide investment consulting services for the City’s Long-Term Investment Program (“LTIP”) and assist with fiduciary oversight for the City’s existing deferred compensation programs and retiree health investment plan.
In Development
Department of General Services / Construction
RFQ – CMAR Services – Charlotte Mecklenburg Goverment Cent ... RFQ – CMAR Services – Charlotte Mecklenburg Goverment Center ADA Implementation Phase II
- Posting Number: 2024-Q3(Jul-Sep)-DGS-14783
- Anticipated Posting Date: 2024-07-01
- Last Updated: 05/13/24
The Charlotte-Mecklenburg Government Center (CMGC) and the adjacent parking garage have been identified in the City-wide ADA Transition Plan for Program Implementation (Program).
The CMGC facility is an existing 14-story, nominally 440,000 square foot building, located at 600 East 4th Street (parcel ID 12502601) and houses several City & County Departments. The adjacent CMGC Parking Garage (parcel 12502501) is a 5-story concrete deck.
Phase II of this ADA Implementation includes all public and non-public facing spaces of the facilities (with the exception of the Council Chambers) and will resolve the physical, non-conforming ADA barriers identified in the ADA Transition Plan, or as required to meet the City of Charlotte ADA Design Guidelines and the 2010 ADA Standards for Accessible Design.
The CMGC is required to stay open to the public and staff during all phases of the project. Active coordination with tenants, facilities staff, and stakeholders will be critical for the successful completion of this project.
In Development
Aviation / General Services
Building Management Systems
- Posting Number: 2025-Q2(Apr-Jun)-AVI-14659
- Anticipated Posting Date: 2025-04-15
- Last Updated: 05/07/24
CLT is seeking proposals from qualified and experienced companies interested in maintaining existing or providing a Building Management Systems to monitor access control, cameras, HVAC and fire detection at the main Terminal, old Terminal building and at the CLT
Center.
In Development
Charlotte Department of Transportation / General Services
Snow and Ice Removal
- Posting Number: 2025-Q2(Apr-Jun)-CDT-14574
- Anticipated Posting Date: 2025-05-31
- Last Updated: 04/11/24
The City of Charlotte Department of Transportation (CDOT) is responsible for the removal of snow and ice on City maintained streets. Additional resources are needed to clear streets during extraordinary winter weather events. Contractors provide additional dump truck and plowing equipment with licensed operators to supplement City services.
In Development
Department of General Services / General Services
On Call Grounds Maintenance Services
- Posting Number: 2024-Q4(Oct-Dec)-DGS-14570
- Anticipated Posting Date: 2024-10-05
- Last Updated: 04/11/24
The City of Charlotte (City) plans to contract with one or more firm(s) to provide On-Call grounds maintenance services for various locations within the City of Charlotte and surrounding areas.
The Contractor shall provide all labor, equipment, supplies, and materials required to provide Grounds Maintenance for city owned properties. consists of but may not be limited to grounds maintenance, turf maintenance, shrub maintenance, groundcover maintenance, perennial maintenance, trash and debris removal, storm debris pickup, irrigation maintenance/ repair/operation, snow and ice removal, tree maintenance, and mulching, pesticide and herbicide application.
The Contractor agrees to an understanding of the current edition of the City of Charlotte-Landscape Management Division’s Landscape Construction Standards and to comply with the specifications and requirements described in this Contract.
The Contractor shall comply with applicable laws regulating the practice of pesticide applications as required by the NCDA. The Contractor will be required to continuously have at least one full-time employee on staff with the required license throughout the entire term of the contract.
In Development
Charlotte Mecklenburg Police Department / Technology Goods & Services
CMPD Cultural Competency Training RFP
- Posting Number: 2024-Q2(Apr-Jun)-CMPD-14565
- Anticipated Posting Date: 2024-05-31
- Last Updated: 04/11/24
The City of Charlotte (the City) is soliciting a Request for Proposals (RFP) to find a company and solution that can provide effective Cultural Competency Training for The Charlotte Mecklenburg Police Department (CMPD). The City will award one vendor with a multi-year contract.
CMPD would like to equip its sworn and civilian employees to address the needs of multicultural community members and visitors through the creation of a cultural competency training curriculum specific to the City of Charlotte. The objective of the training curriculum is to help understand, respect, and appropriately respond to cultural norms when responding to the needs of these communities. The proposed training curriculum is to be customized for the Charlotte-Mecklenburg Police Department.
The Company will:
- Provide a one-day session of training for all employees to include but not limited to officers, recruits, laterals and civilians.
- Provide a four-hour refresher advanced course for all employees who have taken the one-day course, including officers, laterals, and civilians.
- Provide Cultural Competency and Leadership training for CMPD Command College and Sergeants Training
- Develop a training curriculum that will teach social justice, empowerment, intersectionality, power and privilege, oppression, and the changing policing landscape.
- Provide resources that will assist the employee in enhancing self- awareness, foster relationships, and offer a community outlook.
- Be able to provide training to employees at the request of the Chain of Command or internal affairs ruling board.
In Development
Department of General Services / Construction
CMPD Animal Care and Control Phase 3 Expansion
- Posting Number: 2024-Q2(Apr-Jun)-DGS-14059
- Anticipated Posting Date: 2024-04-30
- Last Updated: 04/10/24
The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia. Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility. The expansion of the facility will possibly be located at 2700 Toomey Avenue and the parcel is currently 4.67 acres. This is the old location for the Animal Humane Society. We are currently in the advanced planning phase to acquire a schematic design to confirm the estimated construction cost.
The Construction delivery system will be Progressive Design Build. It is also anticipated that the city will acquire an Owner’s Advisor to assist with procurement and additional services during design and construction.
In Development
Charlotte Mecklenburg Police Department / General Services
Recruiting Advertising
- Posting Number: 2024-Q2(Apr-Jun)-CMPD-12017
- Anticipated Posting Date: 2024-05-31
- Last Updated: 04/10/24
This solicitation is needed to select a qualified consultant to assist with brand development, marketing, graphic design, website development and other marketing related services to implement recruitment campaigns for the CMPD.
Selected vendor shall provide brand development, marketing strategy, development, graphic design, website design and development, and other related services for developing and implementing a recruitment campaign for the Charlotte Mecklenburg Police Department (CMPD). Selected vendor shall be able to manage all campaign services in-house, and provide a comprehensive plan to include media buying, creative development, strategic advisement, etc.
In Development
Department of General Services / Architectural / Engineering Services
Solid Waste Services Master Plan – Advance Planning
- Posting Number: 2024-Q3(Jul-Sep)-DGS-14485
- Anticipated Posting Date: 2024-09-01
- Last Updated: 04/10/24
The project is a study of the current City of Charlotte Solid Waste collection process, the existing facilities for the processing of solid waste, and future needs that include providing strategic locations for additional facilities. The consultant needs to be able to make recommendations as well as have the resources to design a facility.
The selected firm will review the Solid Waste collection process and develop a master plan for how services should be provided throughout the City of Charlotte. This will include identifying possible locations for facilities, the make-up of facilities, and co-location opportunities with other new or existing City facilities.
In Development
Charlotte Department of Transportation / Construction
CDOT Sweden Rd EVSE
- Posting Number: 2024-Q3(Jul-Sep)-CDT-14489
- Anticipated Posting Date: 2024-08-01
- Last Updated: 04/10/24
In June 2018, the Sustainable and Resilient Charlotte by 2050 Resolution was unanimously passed by City Council. This resolution set aggressive and aspirational municipal and community-wide greenhouse gas emissions reduction goals for the City of Charlotte. Specifically, it strives to have City fleet and facilities be fueled by 100% zero-carbon sources by 2030. The CDOT Sweden Rd facility currently contains many fleet vehicles and buses that are run on gasoline. In order to meet the 2030 target, the City has begun and will continue purchasing Electric Vehicles (EV’s) and equip the CDOT Sweden Rd Facility with EV Chargers.
In Development
Department of General Services / General Services
Combination Sewer Truck Body Repair Services
- Posting Number: 2025-Q1(Jan-Mar)-DGS-10276
- Anticipated Posting Date: 2025-03-01
- Last Updated: 03/21/24
The City of Charlotte is seeking a qualified provider of Combination Sewer Truck Body Repair Services to work in conjunction with Fleet Management. The Company shall perform maintenance, and repair services on fleet combination sewer truck equipment owned, operated, or maintained by the City.
In Development
Department of General Services / General Services
Fleet Trailer Equipment Repair Services
- Posting Number: 2025-Q1(Jan-Mar)-DGS-10279
- Anticipated Posting Date: 2025-01-30
- Last Updated: 03/21/24
The City of Charlotte is seeking a qualified provider of Fleet Trailer Equipment Repair Services to work in conjunction with Fleet Management. The Company shall perform maintenance, and repair services on fleet trailed equipment owned, operated, or maintained by the City.
In Development
Charlotte Storm Water Services / Construction
Hidden Valley Storm Drainage Improvement Project
- Posting Number: 2027-Q1(Jan-Mar)-CSWS-9840
- Anticipated Posting Date: 2027-02-01
- Last Updated: 01/28/24
This project is bordered by Highway I-85 to the north, Cinderella Road to the south, Echo Glen Road to the east, and West Sugar Creek Road to the west. The drainage system consists of open channel and closed pipe systems underneath city-maintained roads. This was previously identified as a major capital project from the watershed ranking prioritization process, scoring 73 of 100. The ranking protocol identifies 18 structures that experience flooding in the 100-year storm event and 7 roads that experience transverse overtopping events that do not meet current standards. The entire neighborhood has received a patchwork of repairs over the years and a holistic project is needed to cost beneficially address the drainage system issues.
In Development
Charlotte Storm Water Services / Construction
Camp Greene/Freedom Drive Storm Drainage Improvement Project
- Posting Number: 2025-Q4(Oct-Dec)-CSWS-8369
- Anticipated Posting Date: 2025-11-02
- Last Updated: 01/28/24
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.
In Development
Charlotte Mecklenburg Police Department / General Services
Community Policing Crisis Response Team Services
- Posting Number: 2024-Q1(Jan-Mar)-CMPD-10941
- Anticipated Posting Date: 2024-03-30
- Last Updated: 01/12/24
The Charlotte-Mecklenburg Police Department’s (CMPD’s) Community Policing Crisis Response Team Services (CPCRT) was established to provide improved public safety and service through the deployment of Officers and licensed mental health clinicians. The objective of the CPCRT is to decrease the number of injuries and incarcerated mentally ill individuals by acting as an entry point into mental health treatment.
In Development
Charlotte Mecklenburg Police Department / General Services
Racial Equity Workshops
- Posting Number: 2024-Q2(Apr-Jun)-CMPD-10892
- Anticipated Posting Date: 2024-04-30
- Last Updated: 01/12/24
The City will issue a Request for Proposal (RFP) to select a consultant to facilitate equity training workshops to work with the CMPD to strengthen the knowledge of implicit bias and reduce disproportionality and disparities one class at a time.
In Development
Charlotte Mecklenburg Police Department / Technology Goods & Services
Emergency Communications CAD
- Posting Number: 2024-Q2(Apr-Jun)-CMPD-10884
- Anticipated Posting Date: 2024-06-30
- Last Updated: 01/12/24
The City of Charlotte will be issuing a Request for Proposals on behalf of the Charlotte-Mecklenburg Police Department to solicit for a contract with a qualified consulting company that can provide consulting services to develop and implement a CAD Solution to replace and consolidate the Charlotte-Mecklenburg Police Department, Charlotte Fire Department, and Mecklenburg County Medic respective systems.
In Development
Charlotte Department of Transportation / General Services
Snow and Ice Removal
- Posting Number: 2025-Q3(Jul-Sep)-CDT-13568
- Anticipated Posting Date: 2025-08-23
- Last Updated: 01/09/24
The City of Charlotte Department of Transportation (CDOT) is responsible for the removal of snow and ice on City maintained streets. Additional resources are needed to clear streets during extraordinary winter weather events. Contractors provide additional dump truck and plowing equipment with licensed operators to supplement City services.
In Development
Charlotte Storm Water Services / Construction
Toomey Storm Drainage Improvement Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-8373
- Anticipated Posting Date: 2025-08-04
- Last Updated: 11/15/23
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
In Development
Charlotte Storm Water Services / Construction
Bonlyn Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-9156
- Anticipated Posting Date: 2025-01-02
- Last Updated: 11/15/23
Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, and channels. Work could also include working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way or within storm drainage easements.
In Development
Charlotte Storm Water Services / Construction
Laurel Avenue Storm Drainage Improvement Project
- Posting Number: 2025-Q2(Apr-Jun)-CSWS-9836
- Anticipated Posting Date: 2025-04-16
- Last Updated: 11/15/23
This project is bordered by Laurel Avenue to the north, Dotger Avenue to the south, Randolph Road to the east and Hempstead Place to the west. The existing drainage system consists of closed pipe systems. This drainage system is currently undersized and street flooding has been reported on Colville Road and building flooding has been reported on Cranbrook Lane.
In Development
Housing & Neighborhood Services / General Services
Unspecified Demolition and Environmental Services
- Posting Number: 2023-Q3(Jul-Sep)-HNS-8538
- Anticipated Posting Date: 2023-09-30
- Last Updated: 07/20/23
The City anticipates selecting one (1) or more firms for On‐Call Services to include securing structures, asbestos abatement, utility coordination/relocation, demolition, clearing and grading of specified structures and related improvements, underground storage tank, and contaminated soil removal, well abandonment, tree removal, and miscellaneous environmental remediation. Services may be planned or as a result of an emergency and do not fall within the confines of an existing project’s contract. Most demolition services are urgent in nature and required to protect the health, welfare, and safety of our residents.
In Development
Charlotte Storm Water Services / Construction
Rocky Falls Storm Drainage Improvement Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-8367
- Anticipated Posting Date: 2025-09-15
- Last Updated: 11/14/22
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
In Development
Charlotte Storm Water Services / Construction
6th and Graham Storm Drainage Improvement Project
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-3467
- Anticipated Posting Date: 2025-02-08
- Last Updated: 11/14/22
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
The City of Charlotte vendor will provide Services that consist of the removal of concrete tripping hazards from sidewalks, curb ramps, and concrete curbing in the City of Charlotte’s sidewalk system that the City or its agents have identified. The identified concrete tripping hazards will be repaired without use of typical destructive construction methods, i.e. panel demolition and replacement. All work produced shall be compliant with the American with Disabilities Act (“ADA”) requirements for slope and Occupational Safety and Health Administration requirements for traction. Tripping hazards are defined as any change in vertical elevation more than 1/4”. The vendor is responsible for all traffic control in accordance with the most recent Work Area Traffic Control Handbook (“WATCH”), which can be found at https://charlottenc.gov/Transportation/Permits/Pages/RightofWayUse.aspx Any debris resulting from the removal of trip hazards shall be disposed of in a legal manner.
While the City is flexible with respect to certain elements of the Citywide Trip Hazard Removal Services, the City has specific requirements and preferences for the Service delivery method.
The City of Charlotte vendor shall identify and repair the trip and fall hazards that are ¼” to 2 ½” in height in the City of Charlotte’s sidewalk system. The City of Charlotte vendor shall repair hazards greater than 2 ½” where the thickness of the concrete is greater than 4″.