charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Farmer Street/Romare Bearden Storm Drainage Improvement Project

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-06-18 2024-06-18 Farmer Street/Romare Bearden Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is bordered by West Boulevard to the north, Farmer Street the south, Clanton Road to the east and Ross Avenue to the west. The drainage system consists of closed corrugated metal pipe systems underneath City maintained roads. Approximately 3,200 linear feet of 60-inch deteriorated corrugated metal pipe will need to be replaced.

Posting Number 2024-Q2(Apr-Jun)-CSWS-8363

Anticipated Posting Date 2024-06-18

Commodity Code(s): 74505, 91200, 91244, 91345, 91430, 92912, 92915, 96884, 98814

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is bordered by West Boulevard to the north, Farmer Street the south, Clanton Road to the east and Ross Avenue to the west. The drainage system consists of closed corrugated metal pipe systems underneath City maintained roads. Approximately 3,200 linear feet of 60-inch deteriorated corrugated metal pipe will need to be replaced.

Requirements

Last Updated: 01/28/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov