charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective AC Storm Drainage Improvement Program

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-05-15 2024-05-15 Collective AC Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 1925 Arnold Dr, 10112 Fairway Ridge, and 1127 Willhaven Dr.  1925 Arnold Dr will involve new drainage structures and reinforced concrete pipe, a modified pipe alignment, new curb and gutter, concrete driveway replacement, sanitary sewer replacement as well as full depth asphalt replacement along Arnold Dr.  10112 Fairway Ridge will involve new drainage structures and elliptical reinforced concrete pipe, a modified pipe alignment, sanitary sewer replacement, concrete driveway and full depth asphalt replacement along Fairway Ridge.  1127 Willhaven Dr will consist of reinforced concrete pipe and drainage structure installation, ditch grading, full-depth asphalt replacement as well as curb and gutter replacement along Willhaven Drive.  There will be 2 culvert replacements not located along Willhaven Drive, 1 will be a driveway culvert located at 5328 Randolph Rd and the other will be crossing under Crestbrook Drive.  Both culverts will consist of reinforced concrete pipe, drainage structures, asphalt replacement, and channel grading.  The culvert under Crestbrook Drive will also require curb and gutter as well as sidewalk replacement.

 

Posting Number 2024-Q2(Apr-Jun)-CSWS-12090

Anticipated Posting Date 2024-05-15

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 1925 Arnold Dr, 10112 Fairway Ridge, and 1127 Willhaven Dr.  1925 Arnold Dr will involve new drainage structures and reinforced concrete pipe, a modified pipe alignment, new curb and gutter, concrete driveway replacement, sanitary sewer replacement as well as full depth asphalt replacement along Arnold Dr.  10112 Fairway Ridge will involve new drainage structures and elliptical reinforced concrete pipe, a modified pipe alignment, sanitary sewer replacement, concrete driveway and full depth asphalt replacement along Fairway Ridge.  1127 Willhaven Dr will consist of reinforced concrete pipe and drainage structure installation, ditch grading, full-depth asphalt replacement as well as curb and gutter replacement along Willhaven Drive.  There will be 2 culvert replacements not located along Willhaven Drive, 1 will be a driveway culvert located at 5328 Randolph Rd and the other will be crossing under Crestbrook Drive.  Both culverts will consist of reinforced concrete pipe, drainage structures, asphalt replacement, and channel grading.  The culvert under Crestbrook Drive will also require curb and gutter as well as sidewalk replacement.

 

Requirements

Last Updated: 03/21/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov