charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Severn/Tyndal Storm Drainage Improvement Project

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-07-15 2024-07-15 Severn/Tyndal Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is located in the overall Sunnyvale Storm Drainage Improvement Project (SDIP) area. The scope of work for the Tyndale Avenue project includes replacing a corrugated metal pipe between Tyndale Avenue and Chandworth Road. Replacement of the system is needed to address reported house flooding in the immediate area. The upgrade to the system also allows for the construction of the upstream improvements currently in design from the Storm Water’s queue that will address seven requests for service of failing infrastructure and flooding requests. Approximately 500 linear feet of 48-inch to 66-inch corrugated pipe will need to be replaced to address the undersized and deteriorating system in the Severn Avenue project area.

Posting Number 2024-Q3(Jul-Sep)-CSWS-8349

Anticipated Posting Date 2024-07-15

Commodity Code(s): 74505, 91244, 91345, 92912, 92915, 96884, 98814

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is located in the overall Sunnyvale Storm Drainage Improvement Project (SDIP) area. The scope of work for the Tyndale Avenue project includes replacing a corrugated metal pipe between Tyndale Avenue and Chandworth Road. Replacement of the system is needed to address reported house flooding in the immediate area. The upgrade to the system also allows for the construction of the upstream improvements currently in design from the Storm Water’s queue that will address seven requests for service of failing infrastructure and flooding requests. Approximately 500 linear feet of 48-inch to 66-inch corrugated pipe will need to be replaced to address the undersized and deteriorating system in the Severn Avenue project area.

Requirements

Last Updated: 11/14/22
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov