engineering-property-management-bluet  Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-03-22 2025-03-22 Cross Charlotte Trail (XCLT)− Matheson to Craighead

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Posting Number 2025-Q1(Jan-Mar)-DGS-14020

Anticipated Posting Date 2025-03-22

Commodity Code(s): 55078, 91200, 91223, 91319, 91347, 91361, 91396, 91430, 91479, 96239

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

Requirements

Last Updated: 03/20/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.winebrenner@charlottenc.gov