charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective AD Storm Drainage Improvement Program

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-08-18 2024-08-18 Collective AD Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.

Posting Number 2024-Q3(Jul-Sep)-CSWS-12092

Anticipated Posting Date 2024-08-18

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Collective Storm Drainage Improvement Projects Series AC will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.

Requirements

Last Updated: 03/21/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov