The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is located in the overall Sunnyvale Storm Drainage Improvement Project (SDIP) area. The scope of work for the Tyndale Avenue project includes replacing a corrugated metal pipe between Tyndale Avenue and Chandworth Road. Replacement of the system is needed to address reported house flooding in the immediate area. The upgrade to the system also allows for the construction of the upstream improvements currently in design from the Storm Water’s queue that will address seven requests for service of failing infrastructure and flooding requests. Approximately 500 linear feet of 48-inch to 66-inch corrugated pipe will need to be replaced to address the undersized and deteriorating system in the Severn Avenue project area.
Riverbend Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. The project area is bordered by Ashton Drive to the north, Sharon Road to the south and east, and Park Road to the west. The existing drainage system consists of open channel and closed concrete and metal pipe systems.
Thermal Culvert Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Camp Greene/Freedom Drive Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.
Log Cabin 937 Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Rocky Falls Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.
Toomey Storm Drainage Improvement Project
The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after the review is complete.
Fuel Line Replacement (Canceled Re-Advertise Later Date)
Replace the fuel lines serving the Bank of America and Wilson Air fuel dispending cabinets from the fuel farm. The work includes a combination of fuel line removal/replacement and piping/dispenser cabinet modifications. The associated civil site work includes demolition, minor fencing, asphalt pavement milling, pavement removal, asphalt paving, and landscaping.
Project will Re-Advertise at a later date.