FY2020 CATS Bus Stops Improvements

Install American with Disabilities Act (ADA) compliant bus stops in various locations throughout Charlotte. The bus stop locations are: 1003 Toddville Rd.; 5141 Freedom Dr.; 10610 Westlake Dr.; 10023 Callabridge Ct.; 9800 Callabridge Ct.; 9729 Callabridge Ct.; 6219 Monroe Rd.; 6103 Fairview Rd.; 4536 Sharon Rd.; 1420 N. Tryon St.; 116 Dalton Ave.; and Tryon St. @ White Hall Commons.

Canceled COVID Handsfree Plumbing Fixtures

Using an existing contract to perform work.

As a part of COVID-19 prevention the City of charlotte General Services has started an initiative to replace all city bathroom fixtures with hands free devices to reduce the amount of contact required when using facilities. This project will replace all sink faucets, toilet flush mechanisms, and add bottle fillers at the bathrooms located in South Tryon Bus Facility, North Davidson Bus Facility, Charlotte Transportation Center, North Rail yard and South Boulevard Light Rail Facility.

PSR 1126

Security Booth/Guard House

REBID – CATS is requesting a Request For Proposal for the purchase of four Security Booths. This will include: Installation and Site Preparation Services for Pre-Engineered / Prefabrication Guard House; Ancillary Services related to Pre-Engineered / Prefabricated Buildings and Structures; Construction/Installation of a stationary Security Booth/Guard House with HVAC, LED lighting interior and exterior.

Security Booths/Guard Houses will be located at: Arrowood Station; Pelton Street (VMF rear gate); North Davidson, McGill Street.

PSR 1058

Sugar Creek 78” Sanitary Sewer Rehabilitation Project

The Project consists of rehabilitation of approximately 2,700 feet of 78-inch sanitary sewer via cured-in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning nd television inspection, bypass pumping of wastewater flows, and complete restoration.

Backlot Trail

This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.

DeArmon Road Improvements Project

The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program.  The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.

Sandy Porter S Tryon Intersection Improvements

This project includes pedestrian safety and capacity improvements at the intersection of Sandy Porter and South Tryon Street. The project will add a left turn lane off of South Tryon onto Sandy Porter and install widened sidewalks.

Lakeview-Reames Intersection Improvement and Sidewalk

This project will provide a roundabout at the intersection of Lakeview Road and Reames Road, and a sidewalk on Lakeview Road between Beatties Ford Road and Reames Road. This project is located in the Beatties Ford Road Comprehensive Neighborhood Improvement Program (CNIP) Area.

Kilborne Drive Streetscape

This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)