Posting Number 2022-Q2(Apr-Jun)-CW-8467

Anticipated Posting Date 2022-05-23

Commodity Code(s): 90735, 90775, 91063, 91223, 91378, 91392, 96879

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1950

The purpose of Zone 2 Water Replacement Package project is to expand Charlotte Water’s ongoing water replacement program by expediting the replacement of older water mains that are of pipe materials known to have a high likelihood of failure. Through research of main break data, a group of neighborhoods have been identified with a high concentration of these water mains made from these pipe materials. This project will focus on the replacement of the galvanized steel pipe (GSP) and asbestos cement pipe (ACP) within the project area but will consider other mains within the scope areas as well if deemed necessary. For this project, Charlotte Water staff believes the Progressive Design-Build delivery method will be best.

Requirements

Last Updated: 07/11/22
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background