Beckwith-Meadow Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Park and Slope Repairs, Old Concord Road Park-n-Ride

Repair of detention pond slopes and egress pipe; removal of erosion control devices left over from construction; repair and restoration of failing slopes along Orchid Bridge Road and an adjacent portion of the park and ride lot.

 

PSR#: 1164

Maintenance of Way – Specialty Track Work Contractor

Charlotte Area Transit System (CATS) is looking for a contractor to surface interlockings to maintain proper track geometry. Vendor must have the machinery to tamp through switches and crossings. Surfacing equipment must have the ability to tamp, lift, level and line in order to remove existing faults in longitudinal and alignment faults in the track. This will be a slow process as the track geometry is constantly changing as the machine moves through the switch. Typically, it takes around 1 to 1.30 hours to complete a single switch, due to the cabling and condition. CATS will provide a pilot that will help with track access. CATS will provide ballast for use as needed. Vendor is responsible to ensure all machines can safely traverse the alignment, specs and diagrams for the alignment will be available from CATS if needed. Vendors will need to be RWPP certified that will be given by CATS personnel before shift begin.
The work will be performed during CATS annual shutdown which will consist over 2 days. Beginning on Friday night 0000 and ending on Sunday evening 1800. Vendor would be required to have sufficient resources to support work throughout the shutdown time period to maximize production during the shutdown window. The shutdown will occur between August 2021 and September 2021.

Equipment needed to perform work:
1. 2 Mark IV Tampers (or similar)
2. 2 Ballast Regulators
3. Hi-Rail Roto Dump
4. Front end Loader
5. At minimum, 5-man section team equipped with hand tampers and track jacks for each tamper/regulator team (10 workers per shift)

A pre-tamp inspection of the 2 work locations will be required to document track and interlocking conditions. The vendor will then work closely with CATS personnel to ensure track time allocations are appropriate for the required work and to account for various logistics that need to be addressed to ensure efficient and reliable surfacing unit operations.

All work will be performed in accordance with MOW rail maintenance and track safety standards. Surfacing made by the contractor will play an important role in achieving high performance and quality for long lasting track, which is an important interest for CATS light rail.

 

PSR 1149

FY2020 CATS Bus Stops Improvements

Install American with Disabilities Act (ADA) compliant bus stops in various locations throughout Charlotte. The bus stop locations are: 1003 Toddville Rd.; 5141 Freedom Dr.; 10610 Westlake Dr.; 10023 Callabridge Ct.; 9800 Callabridge Ct.; 9729 Callabridge Ct.; 6219 Monroe Rd.; 6103 Fairview Rd.; 4536 Sharon Rd.; 1420 N. Tryon St.; 116 Dalton Ave.; and Tryon St. @ White Hall Commons.

Canceled COVID Handsfree Plumbing Fixtures

Using an existing contract to perform work.

As a part of COVID-19 prevention the City of charlotte General Services has started an initiative to replace all city bathroom fixtures with hands free devices to reduce the amount of contact required when using facilities. This project will replace all sink faucets, toilet flush mechanisms, and add bottle fillers at the bathrooms located in South Tryon Bus Facility, North Davidson Bus Facility, Charlotte Transportation Center, North Rail yard and South Boulevard Light Rail Facility.

PSR 1126

Security Booth/Guard House

REBID – CATS is requesting a Request For Proposal for the purchase of four Security Booths. This will include: Installation and Site Preparation Services for Pre-Engineered / Prefabrication Guard House; Ancillary Services related to Pre-Engineered / Prefabricated Buildings and Structures; Construction/Installation of a stationary Security Booth/Guard House with HVAC, LED lighting interior and exterior.

Security Booths/Guard Houses will be located at: Arrowood Station; Pelton Street (VMF rear gate); North Davidson, McGill Street.

PSR 1058

Sugar Creek 78” Sanitary Sewer Rehabilitation Project

The Project consists of rehabilitation of approximately 2,700 feet of 78-inch sanitary sewer via cured-in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning nd television inspection, bypass pumping of wastewater flows, and complete restoration.

Backlot Trail

This project will install a 10-foot asphalt path that connects Park South Drive to Park Road. This will include two pedestrian signals.

DeArmon Road Improvements Project

The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program.  The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.