Beaverdam Creek Trunk Sewer – Phase 2 – CANCELLED charlotte-water

Charlotte Water / Construction

Beaverdam Creek Trunk Sewer – Phase 2 – CANCELLED

This project consists of the design and construction of a gravity outfall along Beaverdam Creek West Branch. This outfall is a tributary to the existing Beaverdam Creek Lift Station and Force Main. Phase 2 is approximately 2,100 linear feet of pipe and will continue from the anticipated Phase 1 West Blvd extension north to a …

Lift Station Improvements Phase 4 – CANCELLED charlotte-water

Charlotte Water / Construction

Lift Station Improvements Phase 4 – CANCELLED

Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis. -inactive due to budget reprioritization

RFQ AVIA 23-65 Safety Management System Consulting Services aviation

Aviation / General Services

RFQ AVIA 23-65 Safety Management System Consulting Services

Charlotte Douglas International Airport (“CLT” or “Airport”), which is owned and operated by the City of Charlotte, North Carolina, is seeking statement of qualifications (“SOQ”) from qualified and experienced firms (individually or collectively, the “Firm”) interested in providing professional consulting services toward the completion and implementation of CLT’s Safety Management System (SMS), an organization-wide approach …

McAlpine 54″ Sanitary Sewer Rehabilitation Phase 4 charlotte-water

Charlotte Water / Construction

McAlpine 54″ Sanitary Sewer Rehabilitation Phase 4

The project consists rehabilitation of approximately 4,784 feet of 8-inch and 8,320 feet of 54-inch sanitary sewer via cured in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning and television inspection, rehabilitation of connecting manholes as specified, bypass pumping of wastewater flows, and complete restoration.

Can Lift Stations Phase III-CANCELLED charlotte-water

Charlotte Water / Construction

Can Lift Stations Phase III-CANCELLED

Rehabilitation of wastewater pumping stations. Includes replacement of submersible pumps and pump controls. Makes improvements to flow metering and SCADA systems. 5/13 consolidated with Lift Station Improvements Phrase III.

CMPD Animal Care and Control Compliance & ADA Renovations, Phase II engineering-property-management

Department of General Services / Construction

CMPD Animal Care and Control Compliance & ADA Renovations, Phase II

Phase II Animal Care & Control renovations will address non-compliant issues per the NC Department of Agriculture and Consumer Services, Animal Welfare Section (NCDA&CS) Inspection reports issued in 2018, 2020, and 2021. Phase II will address renovations for separation of species, inadequate ventilation surfaces not impervious to moisture, slab repair, additional square footage for dog …

Blumenthal Performing Arts Center Phase II Roof Replacement engineering-property-management

Department of General Services / Construction

Blumenthal Performing Arts Center Phase II Roof Replacement

Roof Replacement at the Blumenthal Performing Arts Center This work includes the provision of labor, material, equipment, supervision and administration to includes: 1. Roof Areas C1‐C3, D, E1‐E3, F1‐F3 and G: a. Remove and dispose of base flashings, walkway pads and sheet metal. b. Prepare two‐ply modified bitumen roof membrane to receive recovering roof system. …

Franklin Water Treatment Plant Main Building Renovations – CANCELLED charlotte-water

Charlotte Water / Architectural / Engineering Services

Franklin Water Treatment Plant Main Building Renovations – CANCELLED

This will be a request for an Architectural and Engineering service package to retrofit the Franklin Water Treatment Plant Administrative Building. Phase 1 will include overall schematics, the proposed layout of the building, structural assessment, existing conditions drawings, and mapping. Phase 2 will include detailed engineering and structural design, along with architectural design. Phase 3 …

McDonald Avenue (Culvert) Storm Drainage Improvement Project – CANCELLED charlotte-storm-water-services

Charlotte Storm Water Services / Construction

McDonald Avenue (Culvert) Storm Drainage Improvement Project – CANCELLED

Cancel reason: “This will be done as part of a design-build project: Dairy Branch Sewer Improvements.  I think this will be Phase 3 of that project.  The design-build team has already been selected and are currently working through their guaranteed max price (GMP) before they go to Council for approval.  We had a couple questions …