CMPD Animal Care and Control Phase 3 Expansion engineering-property-management

Department of General Services / Construction

CMPD Animal Care and Control Phase 3 Expansion

The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia.  Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility.  The expansion of the facility will possibly be located at …

Charlotte Solar Photovoltaic (PV) Initiative – Phase 3 engineering-property-management

Department of General Services / Construction

Charlotte Solar Photovoltaic (PV) Initiative – Phase 3

The project involves the design / installation of solar photovoltaic systems at the following city facilities: PHASE 3: Firehouse 18 – 2337 Dr Webber Ave. and Firehouse 33 – 2001 Mt Holly-Huntersville Rd. The solar photovoltaic systems will be installed on the roofs of each location. This project will help the city reduce its carbon …

Automatic Meter Reading (AMR) Replacement Phase 3 Construction charlotte-water

Charlotte Water / Technology Goods & Services

Automatic Meter Reading (AMR) Replacement Phase 3 Construction

This project will upgrade the existing meter reading system to a self-reporting network and replace end of life residential meters. Existing communication endpoints not compatible with the network selected will be replaced. Most residential meters will be replaced; those meters not replaced will require a replacement register compatible with the new endpoints. Commercial meters will …

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS) charlotte-department-transportation

Charlotte Department of Transportation / Construction

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove existing copper communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management cameras. This project also …

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)-DUPLICATE charlotte-department-transportation

Charlotte Department of Transportation / Construction

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)-DUPLICATE

This project will install single‐mode fiber optic cable installed in new directionally bored, hand dug and trenched conduit, existing conduit and aerial attachments to poles. It will remove and replace existing copper and fiber communication cables. This project includes entrances and interconnect equipment for existing traffic signal control cabinets and the installation of traffic management …

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP) charlotte-water

Charlotte Water / Construction

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists …

Concourse E – Phase 10 aviation

Aviation / Construction

Concourse E – Phase 10

Add a small addition onto concourse E of approximately 4,350-7,150sf for offices.  Base bid will be a 4,350sf addition with 2ea add alternates to add a 1,400sf bay/ea alternate for a potential maximum of 7,150sf.  This area to be shell space, divided into 2 separate tenant spaces.  Divider wall will be designed and installed to separate …

Briar Creek Phase 4 Sewer Rehab-CANCELLED charlotte-water

Charlotte Water / Construction

Briar Creek Phase 4 Sewer Rehab-CANCELLED

This will be an invitation to bid for construction and will consist of cured-in-place pipe lining, manhole rehab, and other miscellaneous services for several thousand linear feet of current infrastructure. This was originally paired with the Paw Creek/Diversion project and will now be two separate construction projects. 5/13/2024 – cancelled due to project reprioritization.

Asphalt Shoulder Rehabilitation-Phase II aviation

Aviation / Construction

Asphalt Shoulder Rehabilitation-Phase II

As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie. The project includes erosion and sedimentation control, airfield asphalt paving …