Zone 4 Field Operations Center (Construction Manager-at-Risk) charlotte-water

Charlotte Water / Construction

Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as …

LYNX Silver Line Safety and Security Consultant charlotte-area-transit-system

Charlotte Area Transit System / General Services

LYNX Silver Line Safety and Security Consultant

The purpose of this PSR is to procure a Safety and Security consultant for the Pre-Project Development and Project Development phase of the LYNX Silver Line. This scope of work is currently in the LYNX Silver Line Design RFQ currently being advertised, however it has been determined that it is in CATS interest to directly …

4th Parallel Runway Runway Package 1: Taxiway V and Connectors aviation

Aviation / Construction

4th Parallel Runway Runway Package 1: Taxiway V and Connectors

The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways.  The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage.  The new taxiway will meet FAA Taxiway Design Group (TDG) …

CMGC HVAC Replacement Construction Manager-at-Risk engineering-property-management

Department of General Services / Architectural / Engineering Services

CMGC HVAC Replacement Construction Manager-at-Risk

City of Charlotte (City) is seeking to acquire the services of a Construction Manager-at-Risk (CMR) for the Charlotte-Mecklenburg Government Center HVAC Replacement Project (Project). The Guaranteed Maximum Price (GMP) estimate for the Project is $20,400,000 (the Target GMP Range). The City has selected CMTA, Inc. (Mechanical Engineer) to provide mechanical design services for replacement of …