aviation-bluet  Aviation / Construction

4th Parallel Runway Runway Package 1: Taxiway V and Connectors

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-04-10 2024-04-10 4th Parallel Runway Runway Package 1: Taxiway V and Connectors

The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways.  The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Posting Number 2024-Q2(Apr-Jun)-AVI-3134

Anticipated Posting Date 2024-04-10

Commodity Code(s): 91223, 91240, 91310, 92528, 98136, 98814

Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/Taxiway-V-and-Connectors

The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways.  The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Requirements

Last Updated: 04/10/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com