Beaverdam Creek Trunk Sewer – Phase 2 – CANCELLED

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2024-Q1(Jan-Mar)-CW-12630

Anticipated Posting Date 2024-02-01

Commodity Code(s): 91200, 91340, 91360, 91389

This project consists of the design and construction of a gravity outfall along Beaverdam Creek West Branch. This outfall is a tributary to the existing Beaverdam Creek Lift Station and Force Main. Phase 2 is approximately 2,100 linear feet of pipe and will continue from the anticipated Phase 1 West Blvd extension north to a terminus near I-485. This project will accommodate economic growth in the River One area by expanding the wastewater collection system.

Cancelled as of 1/18/2024

Requirements

Last Updated: 01/31/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Bridgette Maxie

City Contact

bridgette.l.maxie@charlottenc.gov