charlotte-water-bluet  Charlotte Water / Architectural / Engineering Services

Franklin Water Treatment Plant Main Building Renovations – CANCELLED

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 05 2024-Q2(Apr-Jun)-CW-12296

Anticipated Posting Date 2024-05-07

Commodity Code(s): 90600, 91893, 92500, Plant

This will be a request for an Architectural and Engineering service package to retrofit the Franklin Water Treatment Plant Administrative Building. Phase 1 will include overall schematics, the proposed layout of the building, structural assessment, existing conditions drawings, and mapping. Phase 2 will include detailed engineering and structural design, along with architectural design. Phase 3 will include technology requests (Supervisory Control and Data Acquisition system, security, etc.), construction phasing/planning office spaces, finishings, exterior and landscaping. Phase 4 will include project permitting and construction admin services. There is a potential for the renovations to be broken up into smaller projects after Phase 1 is complete.

-inactive due to budget reprioritization

Requirements

Last Updated: 05/07/24
Insurance Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Daniel Lindholm

City Contact

daniel.lindholm@charlottenc.gov