Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Collective AD Storm Drainage Improvement Program

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-12092
  • Anticipated Posting Date: 2026-03-15
  • Last Updated: 12/17/25
Add to Calendar 2026-03-15 2026-03-15 Collective AD Storm Drainage Improvement Program

Collective Storm Drainage Improvement Projects Series AD will involve 3 projects throughout the City of Charlotte, 4213 Tipperary Pl, 2607 Vail Ave, 4600 Randolph Rd.  4213 Tipperary Pl will consist of a reinforced box culvert replacement as well as reinforced concrete pipe replacement and realignment, CIPP liner, storm drainage structure replacement, full depth asphalt, curb and gutter, concrete driveway, new sanitary sewer pipe and sanitary sewer structures, as well as sidewalk replacement all along Tipperary Place.  2607 Vail Ave will reroute water along Vaile Ave that will consist of new storm drainage pipe and structures as well as sanitary sewer line replacement, concrete driveway and curb replacement, as well as full depth asphalt replacement.  4600 Randolph Rd will consist of CIPP lining across Randolph Rd, a new reinforced concrete pipe alignment with structures, concrete curb, concrete driveway, full depth asphalt, and ditch work along commercial properties and an apartment complex.

In Development Charlotte Water

Charlotte Water / Construction

FY28 Large Diameter Water & Sewer Services Contract

  • Posting Number: 2027-Q2(Apr-Jun)-CW-12283
  • Anticipated Posting Date: 2027-06-01
  • Last Updated: 12/10/25
Add to Calendar 2027-06-01 2027-06-01 FY28 Large Diameter Water & Sewer Services Contract

This contract is for the continuous installation of large water and sewer services, as needed, for commercial or residential purposes with a diameter one and a half inches or larger. Customers apply for quotes for service connection and pay the applicable fees to get into the construction queue. This contract will help meet the demand for these kinds of service connections for the next two years.

In Development Engineering Property Management

Department of General Services / Construction

Safe Streets for All (SS4A) – Phase 1

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-18342
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 12/10/25
Add to Calendar 2026-04-01 2026-04-01 Safe Streets for All (SS4A) – Phase 1

This project includes safety improvements at 8 sites, focusing on low-cost, high-impact measures such as pedestrian crossings, accessible pedestrian signals (APS), leading pedestrian intervals (LPIs), and priority projects from a Safe Routes to School study.

In Development Engineering Property Management

Department of General Services / Construction

Robinson Church Road Widening – Phase 1

  • Posting Number: 2027-Q1(Jan-Mar)-DGS-19425
  • Anticipated Posting Date: 2027-01-01
  • Last Updated: 11/21/25
Add to Calendar 2027-01-01 2027-01-01 Robinson Church Road Widening – Phase 1

Widen Robinson Church Road from WT Harris Blvd. to the Plott Road/Highland Avenue intersection from two lanes to three lanes with intermittent islands. Amenities include: curb & gutter, shared-use path, planting strip, underground stormwater filers, accessible ramps, and mid-block crossings. Includes the construction of a roundabout.

In Development Engineering Property Management

Department of General Services / Construction

Vision Zero Safe to School: WT Harris at Grier

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-19244
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 11/21/25
Add to Calendar 2026-04-01 2026-04-01 Vision Zero Safe to School: WT Harris at Grier

Fixing non-compliant ramps and pedestrian signals at 2 signalized intersections. Curb ramp and sidewalk replacements at multiple unsignalized intersections. Mill & overlay and pavement marking work will be required. Traffic signal wiring/conduit work will be required.

In Development Charlotte Water

Charlotte Water / Construction

Service Water Improvements and Flow Meter Modifications

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17350
  • Anticipated Posting Date: 2026-01-31
  • Last Updated: 11/21/25
Add to Calendar 2026-01-31 2026-01-31 Service Water Improvements and Flow Meter Modifications

This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.

In Development Charlotte Area Transit System

Charlotte Area Transit System / Construction

CTC Drainage Repairs

  • Posting Number: 2026-Q1(Jan-Mar)-CATS-19081
  • Anticipated Posting Date: 2026-01-20
  • Last Updated: 11/21/25
Add to Calendar 2026-01-20 2026-01-20 CTC Drainage Repairs

The Charlotte Area Transit System (CATS) anticipates soliciting for the repair of a damaged storm drain pipe along 4th Street in order to improve drainage at the Charlotte Transportation Center.

PSR # 1955

In Development Charlotte Water

Charlotte Water / Construction

Ashe Plantation Lift Station 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18598
  • Anticipated Posting Date: 2027-07-15
  • Last Updated: 10/22/25
Add to Calendar 2027-07-15 2027-07-15 Ashe Plantation Lift Station 

The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

 

 

 

 

 

In Development Charlotte Water

Charlotte Water / Construction

Reclaimed Water Pumping Capacity Improvements at Mallard

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17938
  • Anticipated Posting Date: 2026-01-31
  • Last Updated: 10/22/25
Add to Calendar 2026-01-31 2026-01-31 Reclaimed Water Pumping Capacity Improvements at Mallard

This contract will provide services to improve reclaimed water pumping capacity at the Mallard facility. The improvements will enhance system efficiency and support increased demand for reclaimed water usage. Upgrades will include pump replacements and infrastructure modifications.

In Development Charlotte Water

Charlotte Water / Construction

Sugar Creek Gasoline and Diesel Fuel Tank Installation

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17944
  • Anticipated Posting Date: 2026-01-31
  • Last Updated: 10/22/25
Add to Calendar 2026-01-31 2026-01-31 Sugar Creek Gasoline and Diesel Fuel Tank Installation

This contract covers the installation of a new gas and diesel fuel tank at the Sugar Creek facility. The project will support fleet fueling operations and ensure compliance with environmental regulations. Proper installation and containment measures will be included.

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Street Main Extensions Contract 2

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17887
  • Anticipated Posting Date: 2026-01-15
  • Last Updated: 10/06/25
Add to Calendar 2026-01-15 2026-01-15 Fiscal Year 2026 Street Main Extensions Contract 2

This contract will include the construction of street main extensions and various infrastructure projects. The contract will provide construction assistance for other capital projects as needed. It covers the entire Charlotte Water service area, ensuring water distribution system improvements.

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Street Main Extensions Contract 1

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17885
  • Anticipated Posting Date: 2026-01-15
  • Last Updated: 10/02/25
Add to Calendar 2026-01-15 2026-01-15 Fiscal Year 2026 Street Main Extensions Contract 1

This contract includes the construction of multiple street main extensions and other miscellaneous infrastructure projects. It will provide construction assistance on an as-needed basis for other capital projects. The scope covers the entire Charlotte Water service area, ensuring water distribution system improvements where necessary.