Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Rounding Run Storm Drainage Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-8361
  • Anticipated Posting Date: 2024-11-02
  • Last Updated: 01/28/24
Add to Calendar 2024-11-02 2024-11-02 Rounding Run Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Hidden Valley Storm Drainage Improvement Project

  • Posting Number: 2027-Q1(Jan-Mar)-CSWS-9840
  • Anticipated Posting Date: 2027-02-01
  • Last Updated: 01/28/24
Add to Calendar 2027-02-01 2027-02-01 Hidden Valley Storm Drainage Improvement Project

This project is bordered by Highway I-85 to the north, Cinderella Road to the south, Echo Glen Road to the east, and West Sugar Creek Road to the west.  The drainage system consists of open channel and closed pipe systems underneath city-maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process, scoring 73 of 100.  The ranking protocol identifies 18 structures that experience flooding in the 100-year storm event and 7 roads that experience transverse overtopping events that do not meet current standards.  The entire neighborhood has received a patchwork of repairs over the years and a holistic project is needed to cost beneficially address the drainage system issues.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Camp Greene/Freedom Drive Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-8369
  • Anticipated Posting Date: 2025-11-02
  • Last Updated: 01/28/24
Add to Calendar 2025-11-02 2025-11-02 Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Shamrock Drive Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-3459
  • Anticipated Posting Date: 2024-06-15
  • Last Updated: 01/28/24
Add to Calendar 2024-06-15 2024-06-15 Shamrock Drive Storm Drainage Improvement Project

This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Log Cabin 937 Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-8371
  • Anticipated Posting Date: 2025-02-13
  • Last Updated: 01/25/24
Add to Calendar 2025-02-13 2025-02-13 Log Cabin 937 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Hill Street Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-3451
  • Anticipated Posting Date: 2025-01-01
  • Last Updated: 12/12/23
Add to Calendar 2025-01-01 2025-01-01 Hill Street Storm Drainage Improvement Project

The storm drainage improvement project is for the area in and around Hill Street.  The construction project boundaries are Tryon Street to the southeast, Trade Street to the northeast, South Cedar Street and West 1st Street to the north, and Palmer Street to the southwest. The project includes storm drainage improvements that reduce house and street flooding or will repair failing infrastructure.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Toomey Storm Drainage Improvement Project

  • Posting Number: 2025-Q3(Jul-Sep)-CSWS-8373
  • Anticipated Posting Date: 2025-08-04
  • Last Updated: 11/15/23
Add to Calendar 2025-08-04 2025-08-04 Toomey Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Foxwood Road 2727 Storm Drain Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-7058
  • Anticipated Posting Date: 2024-10-02
  • Last Updated: 11/15/23
Add to Calendar 2024-10-02 2024-10-02 Foxwood Road 2727 Storm Drain Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Collective V (Multiple Isolated Storm Drainage Improvements Projects)

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-9970
  • Anticipated Posting Date: 2024-04-15
  • Last Updated: 11/15/23
Add to Calendar 2024-04-15 2024-04-15 Collective V (Multiple Isolated Storm Drainage Improvements Projects)

This project consists of multiple isolated storm drainage improvements projects located throughout the City of Charlotte. Projects include storm drainage improvements and replacement and repair of existing storm drainage system facilities within the street right-of-way and private, residential properties.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Chatham Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-5451
  • Anticipated Posting Date: 2025-03-04
  • Last Updated: 10/11/23
Add to Calendar 2025-03-04 2025-03-04 Chatham Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Barrington Drive 5919 Storm Drainage Improvement Project

  • Posting Number: 2024-Q3(Jul-Sep)-CSWS-7056
  • Anticipated Posting Date: 2024-09-17
  • Last Updated: 09/18/23
Add to Calendar 2024-09-17 2024-09-17 Barrington Drive 5919 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development Charlotte Department Transportation

Charlotte Department of Transportation / Construction

Bridge Repairs

  • Posting Number: 2027-Q1(Jan-Mar)-CDT-16788
  • Anticipated Posting Date: 2027-03-08
  • Last Updated: 09/15/23
Add to Calendar 2027-03-08 2027-03-08 Bridge Repairs

This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.