Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Water

Charlotte Water / Construction

Belmont Pump Station Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-12294
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 10/02/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development Engineering Property Management

Department of General Services / Construction

McCullough Drive Extension

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-17950
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 10/02/25
Add to Calendar 2026-01-01 2026-01-01 McCullough Drive Extension

An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles

In Development Charlotte Water

Charlotte Water / Construction

Belmont Horizontal Directional Drilling Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18602
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 10/02/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Horizontal Directional Drilling Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.

In Development Engineering Property Management

Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

  • Posting Number: 2027-Q2(Apr-Jun)-DGS-14020
  • Anticipated Posting Date: 2027-04-01
  • Last Updated: 07/09/25
Add to Calendar 2027-04-01 2027-04-01 Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer

In Development Engineering Property Management

Department of General Services / Construction

Firehouse 44

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-18355
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 06/23/25
Add to Calendar 2026-01-01 2026-01-01 Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

In Development Engineering Property Management

Department of General Services / Construction

WT Harris SUP (JW Clay to N Tryon)

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-17369
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/03/25
Add to Calendar 2026-04-01 2026-04-01 WT Harris SUP (JW Clay to N Tryon)

A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path.  Project Length = 0.33 miles.

In Development Engineering Property Management

Department of General Services / Construction

Kuykendall Road Improvements

  • Posting Number: 2026-Q4(Oct-Dec)-DGS-17367
  • Anticipated Posting Date: 2026-10-01
  • Last Updated: 02/03/25
Add to Calendar 2026-10-01 2026-10-01 Kuykendall Road Improvements

This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.

In Development Engineering Property Management

Department of General Services / Construction

Lawyers Rd SW (Harri Ann to Chestnut)

  • Posting Number: 2026-Q4(Oct-Dec)-DGS-17342
  • Anticipated Posting Date: 2026-10-01
  • Last Updated: 11/05/24
Add to Calendar 2026-10-01 2026-10-01 Lawyers Rd SW (Harri Ann to Chestnut)

The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.

In Development Engineering Property Management

Department of General Services / Construction

Arrowood at Whitehall Commons Intersection

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-17318
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 09/20/24
Add to Calendar 2026-04-01 2026-04-01 Arrowood at Whitehall Commons Intersection

This is an intersection project which will involve installing a new traffic signal with pedestrian signals, widening some of the approaches, replacing all curb ramps, mill & overlay, and pavement markings. The traffic signal will use steel strain poles.

In Development Engineering Property Management

Department of General Services / Construction

University City Blvd Pedestrian Crossings

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-14167
  • Anticipated Posting Date: 2026-04-23
  • Last Updated: 03/20/24
Add to Calendar 2026-04-23 2026-04-23 University City Blvd Pedestrian Crossings

This Project will install 270 LF of proposed 12′ wide multi-use-path, curb ramps, crosswalks across NC 49, Pedestrian concrete island, milling/resurfacing, storm drainage and pedestrian hybrid beacon with mast arms near the intersection of University Blvd and Mark Twain Road. This project will also install pedestrian crossings, wheelchair ramps, traffic signals milling/resurfacing and storm drainage system at the intersection of University City Blvd and Suther Rd.91347

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Hidden Valley Storm Drainage Improvement Project

  • Posting Number: 2027-Q1(Jan-Mar)-CSWS-9840
  • Anticipated Posting Date: 2027-02-01
  • Last Updated: 01/28/24
Add to Calendar 2027-02-01 2027-02-01 Hidden Valley Storm Drainage Improvement Project

This project is bordered by Highway I-85 to the north, Cinderella Road to the south, Echo Glen Road to the east, and West Sugar Creek Road to the west.  The drainage system consists of open channel and closed pipe systems underneath city-maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process, scoring 73 of 100.  The ranking protocol identifies 18 structures that experience flooding in the 100-year storm event and 7 roads that experience transverse overtopping events that do not meet current standards.  The entire neighborhood has received a patchwork of repairs over the years and a holistic project is needed to cost beneficially address the drainage system issues.