Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Street Main Extensions Contract 3

  • Posting Number: 2026-Q1(Jan-Mar)-CW-17889
  • Anticipated Posting Date: 2026-01-15
  • Last Updated: 10/02/25
Add to Calendar 2026-01-15 2026-01-15 Fiscal Year 2026 Street Main Extensions Contract 3

This contract will focus on the construction of street main extensions and other necessary infrastructure projects. It will also serve as an on-call contract for capital project construction support. The work will be performed throughout Charlotte Water’s service area, ensuring continued system reliability and expansion where needed.

In Development Charlotte Water

Charlotte Water / Construction

McAlpine Creek WRRF Digesters Rehabilitation 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18600
  • Anticipated Posting Date: 2027-07-15
  • Last Updated: 10/02/25
Add to Calendar 2027-07-15 2027-07-15 McAlpine Creek WRRF Digesters Rehabilitation 

The McAlpine Digesters Rehabilitation project focuses on restoring key components of the biosolids treatment facilities. This includes structural repairs and a new cover for the first digested sludge storage tank, along with installation of new sludge pumps, valves, and piping. The project also replaces an outdated programmable logic controller system and adds a new sludge line to separate gravity-fed and pumped flows. Additional improvements include a new dewatering well system for draining the storage tanks and structural evaluation and repairs to the second digested sludge storage tank.

 

 

 

 

 

 

 

 

 

 

In Development Charlotte Water

Charlotte Water / Construction

McDowell Creek WRRF Digesters Rehabilitation 

  • Posting Number: 2027-Q3(Jul-Sep)-CW-18608
  • Anticipated Posting Date: 2027-07-11
  • Last Updated: 10/02/25
Add to Calendar 2027-07-11 2027-07-11 McDowell Creek WRRF Digesters Rehabilitation 

This will be an Invitation to Bid for Charlotte Water. The project will involve the rehabilitation of biosolids treatment facilities at the McDowell Creek Water Resource Recovery Facility. Work will focus on existing digesters and may include structural repairs, floor regrouting, replacement of mechanical components, and upgrades to valves and associated piping. Electrical and instrumentation systems will be reconnected or replaced as needed to support restored operations. These improvements aim to enhance the performance, safety, and reliability of the digester systems and associated infrastructure.

 

 

 

 

 

In Development Charlotte Water

Charlotte Water / Construction

Fiscal Year 2026 Water Main Replacement

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18568
  • Anticipated Posting Date: 2026-04-30
  • Last Updated: 10/02/25
Add to Calendar 2026-04-30 2026-04-30 Fiscal Year 2026 Water Main Replacement

This construction contract is designated for the replacement of aging water main infrastructure. The scope of work primarily targets water mains that have reached or exceeded their expected service life and are now contributing to operational challenges such as increased maintenance, reduced reliability, and potential service interruptions. Priority is given to pipeline segments 12 inches in diameter or smaller. This contract supports Charlotte Water’s long-term asset management strategy by improving system resilience, reducing unplanned outages, and enhancing overall water service reliability.

 

In Development Charlotte Water

Charlotte Water / Construction

Belmont Pump Station Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-12294
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 10/02/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

In Development Charlotte Water

Charlotte Water / Construction

Unspecified Water and Sewer Repairs

  • Posting Number: 2025-Q4(Oct-Dec)-CW-17896
  • Anticipated Posting Date: 2025-12-05
  • Last Updated: 10/02/25
Add to Calendar 2025-12-05 2025-12-05 Unspecified Water and Sewer Repairs

This contract covers on-call repairs for water and sewer systems throughout Charlotte Water’s collection and distribution areas. Work may include emergency mobilization for critical pipeline repairs and other maintenance activities. The contract ensures rapid response capabilities for unforeseen infrastructure issues.

In Development Engineering Property Management

Department of General Services / Construction

McCullough Drive Extension

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-17950
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 10/02/25
Add to Calendar 2026-01-01 2026-01-01 McCullough Drive Extension

An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles

In Development Charlotte Water

Charlotte Water / Construction

Belmont Horizontal Directional Drilling Construction

  • Posting Number: 2026-Q2(Apr-Jun)-CW-18602
  • Anticipated Posting Date: 2026-04-15
  • Last Updated: 10/02/25
Add to Calendar 2026-04-15 2026-04-15 Belmont Horizontal Directional Drilling Construction

This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.

In Development Engineering Property Management

Department of General Services / Construction

Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025) ... Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

  • Posting Number: 2027-Q2(Apr-Jun)-DGS-14020
  • Anticipated Posting Date: 2027-04-01
  • Last Updated: 07/09/25
Add to Calendar 2027-04-01 2027-04-01 Cross Charlotte Trail (XCLT)− Matheson to Craighead (REVISED 7/2025)

The Matheson to Craighead segment of the Cross Charlotte Trail will implement a 14-foot shared use path beginning at E 36th Street. The path will continue down Cullman Ave and board walk up into a pedestrian bridge spanning the Norfolk Southern Railroad tracks utilizing a prefabricated structure within railroad right of way. The structure will then connect to the existing trail built by Brand Properties within the Kaleido Noda apartment complex.

July 2025 Update: This project will not go out for public bid; it is now being designed and constructed through a reimbursement agreement with a private developer

In Development Engineering Property Management

Department of General Services / Construction

Firehouse 44

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-18355
  • Anticipated Posting Date: 2026-01-01
  • Last Updated: 06/23/25
Add to Calendar 2026-01-01 2026-01-01 Firehouse 44

Firehouse 44 will be an integral asset to support Charlotte Fire Department’s efficient response to emergencies in the community; providing a location within the newly developed River District community and expanding their response area in this newly incorporated region of Charlotte. This 14,600 SF, two-story, 3-bay facility will be the first mass timber firehouse in the Southeast US and will meet Living Future’s (LF) Zero Carbon certification for total project embodied carbon. The project will comply with Charlotte’s Sustainable Facilities Policy and fully support the sophisticated and time-sensitive operations of the Fire Department.

In Development Engineering Property Management

Department of General Services / Construction

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

  • Posting Number: 2026-Q3(Jul-Sep)-DGS-17368
  • Anticipated Posting Date: 2026-07-01
  • Last Updated: 02/03/25
Add to Calendar 2026-07-01 2026-07-01 Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

In Development Engineering Property Management

Department of General Services / Construction

WT Harris SUP (JW Clay to N Tryon)

  • Posting Number: 2026-Q2(Apr-Jun)-DGS-17369
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 02/03/25
Add to Calendar 2026-04-01 2026-04-01 WT Harris SUP (JW Clay to N Tryon)

A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path.  Project Length = 0.33 miles.