Earlybird, Business Opportunity Pipeline, City of Charlotte

Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.

If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Department

Solicitation Category

Utilization

Expected Release Date

Estimated Total Value

Clear

In Development Engineering Property Management

Department of General Services / Construction

7th Street Parallel Bike Routes

  • Posting Number: 2025-Q4(Oct-Dec)-DGS-14170
  • Anticipated Posting Date: 2025-11-05
  • Last Updated: 03/14/24
Add to Calendar 2025-11-05 2025-11-05 7th Street Parallel Bike Routes

This project will build bike facilities in several different locations throughout the Elizabeth neighborhood to create safer conditions and improve ease of travel for cyclists and pedestrians, including approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 10 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street, and a curb extension located at the intersection of Pecan Avenue and 8th Street.

In Development Engineering Property Management

Department of General Services / Construction

DeArmon Road Improvements Project

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-5221
  • Anticipated Posting Date: 2026-03-31
  • Last Updated: 03/14/24
Add to Calendar 2026-03-31 2026-03-31 DeArmon Road Improvements Project

The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program.  The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.

In Development Engineering Property Management

Department of General Services / Construction

Prosperity Church Road (Old Ridge to Benfield) Improvements

  • Posting Number: 2024-Q2(Apr-Jun)-DGS-9862
  • Anticipated Posting Date: 2024-06-17
  • Last Updated: 03/05/24
Add to Calendar 2024-06-17 2024-06-17 Prosperity Church Road (Old Ridge to Benfield) Improvements

The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.

In Development Charlotte Department Transportation

Charlotte Department of Transportation / Construction

Traffic Signal Installation and Maintenance

  • Posting Number: 2024-Q2(Apr-Jun)-CDT-13594
  • Anticipated Posting Date: 2024-05-31
  • Last Updated: 03/01/24
Add to Calendar 2024-05-31 2024-05-31 Traffic Signal Installation and Maintenance

This traffic signal contract will provide resources to install and maintain traffic signals and support infrastructure citywide.

In Development Charlotte Department Transportation

Charlotte Department of Transportation / Construction, General Services

Pavement Markings, Thermoplastic Pavement Markings

  • Posting Number: 2024-Q2(Apr-Jun)-CDT-13590
  • Anticipated Posting Date: 2024-05-31
  • Last Updated: 03/01/24
Add to Calendar 2024-05-31 2024-05-31 Pavement Markings, Thermoplastic Pavement Markings

The pavement markings and line removal will be performed on roadways that are maintained by the City of Charlotte and by the North Carolina Department of Transportation (NCDOT). This is a task order-based contract for on-call services. The services will be established via task orders which include the following: Mobilization, Pavement Markings, Thermoplastic Pavement Markings, Thermoplastic Line Removal, and Traffic Control.

In Development Engineering Property Management

Department of General Services / Construction

Sharon Road at Eastburn Road Improvements

  • Posting Number: 2026-Q1(Jan-Mar)-DGS-14074
  • Anticipated Posting Date: 2026-01-02
  • Last Updated: 02/28/24
Add to Calendar 2026-01-02 2026-01-02 Sharon Road at Eastburn Road Improvements

This project is located on Sharon Road at Eastburn Road. The project proposes a curve realignment adding a left-turn lane from Sharon Road on to Eastburn Road and removing the superelevation.

In Development Engineering Property Management

Department of General Services / Construction

Idlewild Road and Monroe Road Intersection

  • Posting Number: 2025-Q2(Apr-Jun)-DGS-8922
  • Anticipated Posting Date: 2025-06-30
  • Last Updated: 02/14/24
Add to Calendar 2025-06-30 2025-06-30 Idlewild Road and Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Rounding Run Storm Drainage Improvement Project

  • Posting Number: 2024-Q4(Oct-Dec)-CSWS-8361
  • Anticipated Posting Date: 2024-11-02
  • Last Updated: 01/28/24
Add to Calendar 2024-11-02 2024-11-02 Rounding Run Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Hidden Valley Storm Drainage Improvement Project

  • Posting Number: 2027-Q1(Jan-Mar)-CSWS-9840
  • Anticipated Posting Date: 2027-02-01
  • Last Updated: 01/28/24
Add to Calendar 2027-02-01 2027-02-01 Hidden Valley Storm Drainage Improvement Project

This project is bordered by Highway I-85 to the north, Cinderella Road to the south, Echo Glen Road to the east, and West Sugar Creek Road to the west.  The drainage system consists of open channel and closed pipe systems underneath city-maintained roads.  This was previously identified as a major capital project from the watershed ranking prioritization process, scoring 73 of 100.  The ranking protocol identifies 18 structures that experience flooding in the 100-year storm event and 7 roads that experience transverse overtopping events that do not meet current standards.  The entire neighborhood has received a patchwork of repairs over the years and a holistic project is needed to cost beneficially address the drainage system issues.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Camp Greene/Freedom Drive Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-8369
  • Anticipated Posting Date: 2025-11-02
  • Last Updated: 01/28/24
Add to Calendar 2025-11-02 2025-11-02 Camp Greene/Freedom Drive Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is located near the intersection of Camp Greene Street and Freedom Drive.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Shamrock Drive Storm Drainage Improvement Project

  • Posting Number: 2024-Q2(Apr-Jun)-CSWS-3459
  • Anticipated Posting Date: 2024-06-15
  • Last Updated: 01/28/24
Add to Calendar 2024-06-15 2024-06-15 Shamrock Drive Storm Drainage Improvement Project

This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.

In Development Charlotte Storm Water Services

Charlotte Storm Water Services / Construction

Log Cabin 937 Storm Drainage Improvement Project

  • Posting Number: 2025-Q1(Jan-Mar)-CSWS-8371
  • Anticipated Posting Date: 2025-02-13
  • Last Updated: 01/25/24
Add to Calendar 2025-02-13 2025-02-13 Log Cabin 937 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.