Monroe Road Streetscape

Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center.  Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.

Tuckaseegee Rd (Little Rock Rd to Westerwood Dr) Sidewalk

This project will fill in gaps in the existing sidewalk system on the south side along Tuckaseegee Road from Little Rock Road to West Mecklenburg High School, and along the north side of Tuckaseegee Road from Burkholder Road to Toddville Road.

Idlewild Road and Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

Idlewild Road/Rama Road/Monroe Road Intersection

This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.

Early Grading Package (4th Parallel Runway Project)

As part of the 4th Parallel Runway project, the Airport will solicit bids for grading, drainage, fencing, and erosion and sediment control. Other scopes of work include:

  • Excavation of in-site soil and rock from existing Airport property areas
  • Stockpiling, placement, and compaction of excavated material in CLT-recommended locations
  • Isolated, minor site surface drainage features along regraded areas and stockpile locations
  • May include extension of existing Coffey Creek box culvert – currently under construction as part of the South Crossfield (SCF) project (TBD)
  • May include extension of existing sanitary sewer line relocation – currently under construction as part of the SCF project (TBD)
  • Identification of and relocation of existing security perimeter fence as needed.

Specialized Roadway Construction Services FY23A

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Carolina Aviation Museum Sitework

This project consists of site preparation for the future development of the Carolinas Aviation Museum. Specific work includes demolition of existing facilities, earthwork, grading, utility installation, associated asphalt, concrete masonry work, landscaping, and other miscellaneous items.