Work performed under this transportation repair (TR) contract will consist of storm water infrastructure maintenance, repair and maintenance projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. See section 1.28 – Scope of Work for additional details and information.
FY2025A – Storm Drainage Repair and Improvement – Various Locations
Work performed under this contract will consist of nine (9) stormwater improvement projects throughout Charlotte, NC as illustrated in the plans of the contract documents. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the respective project plan.
Storm Water Repair and Improvement FY2024-G
Work performed under this contract will consist of storm water infrastructure maintenance, repair and improvement projects within the city limits of Charlotte, NC. Work may include but is not limited to mobilization, earthwork, installation of storm drainage structures and pipes/culverts, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm drainage structure and pipe repair and/or rehabilitation pipe lining, water and sanitary sewer (relocations, installations, and adjustments). Locations of work will vary and can be within public right of way, private property with easements or a combination of both.
Rea Road Widening (I-485 to Williams Pond Lane)
The purpose of this project is to increase capacity along Rea Road. Capacity will be increased by utilizing the right turn lane drops and median to develop an additional NB and SB through lane along Rea Road between the I-485 ramps and Williams Pond Lane. This project will also result in increased turn lane capacity and intersection improvements at Piper Station Drive and Ballantyne Commons Parkway. Pedestrian safety and mobility will be improved by providing sidewalks on both sides of Rea Road. Other specific improvements include: curb and gutter, accessible ramps, and driveways.
CMPD Animal Care and Control Phase 3 Expansion
The purpose of the CMPD Animal Care and Control, Phase 3 Expansion project is primarily to provide additional kennels for dogs and reduce the increasing rate of euthanasia. Secondly, to provide additional space for other animals and improve the efficiencies of operations for the facility. The expansion of the facility will possibly be located at 2700 Toomey Avenue and the parcel is currently 4.67 acres. This is the old location for the Animal Humane Society. We are currently in the advanced planning phase to acquire a schematic design to confirm the estimated construction cost.
The Construction delivery system will be Progressive Design Build. It is also anticipated that the city will acquire an Owner’s Advisor to assist with procurement and additional services during design and construction.
Ornamental Aluminum Fencing
The Charlotte Fire Department is requesting a new contract for fencing installation services. Work to be performed under this contract is to furnish and install an approximately 960’x 8′ tall ornamental aluminum fence with four (4) single gates. The location of the fence will be in the back parking lot of the Charlotte Fire Department Headquarters.
Bridge Structures Repairs
This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.
Cross Charlotte Trail (XCLT)− Tryon to Orr
This project will extend the Cross Charlotte Trail main alignment from N. Tryon Street to Orr Road with additional connectors to the surrounding area.
Beatties Ford Sidewalk Phase 1
This project will improve the curbs, driveway, sidewalks and ramps for Beatties Ford Road between Russell Avenue and Lasalle Street. Concrete shall be 6-inch Portland cement, asphalt shall be two-inch course and four-inch intermediate course. Gravel shall be six-inch incidental stone. Limits of proposed slopes are indicated in the plans. The contractor shall maintain erosion control devices in accordance with the appropriate city and state erosion and sediment control ordinances. Contractor shall sawcut existing asphalt and/or concrete surfaces prior to removal unless otherwise directed by the engineer. Project length is 0.281 miles.