charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Storm Water Repair and Improvement FY2024-G

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-05-01 2024-05-01 Storm Water Repair and Improvement FY2024-G

Work performed under this contract will consist of storm water infrastructure maintenance, repair and improvement projects within the city limits of Charlotte, NC.  Work may include but is not limited to mobilization, earthwork, installation of storm drainage structures and pipes/culverts, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm drainage structure and pipe repair and/or rehabilitation pipe lining, water and sanitary sewer (relocations, installations, and adjustments).  Locations of work will vary and can be within public right of way, private property with easements or a combination of both.

Posting Number 2024-Q2(Apr-Jun)-CSWS-14706

Anticipated Posting Date 2024-05-01

Commodity Code(s): 55078, 74565, 91244, 91319, 91339, 91345, 91347, 91396, 91430, 91438, 91455, 92914, 96185, 96239, 96884, 97524, 98814, 98815, 98852

Solicitation Link: https://charlottenc.bonfirehub.com/projects/137744/details

Work performed under this contract will consist of storm water infrastructure maintenance, repair and improvement projects within the city limits of Charlotte, NC.  Work may include but is not limited to mobilization, earthwork, installation of storm drainage structures and pipes/culverts, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm drainage structure and pipe repair and/or rehabilitation pipe lining, water and sanitary sewer (relocations, installations, and adjustments).  Locations of work will vary and can be within public right of way, private property with easements or a combination of both.

Requirements

Last Updated: 05/06/24
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov