aviation-bluet  Aviation / Construction

Early Grading Package (4th Parallel Runway Project)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2023-Q1(Jan-Mar)-AVI-8797

Anticipated Posting Date 2023-01-09

Commodity Code(s): 33010, 33065, 91223, 91244, 92935, 98136, 98815

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=2090

As part of the 4th Parallel Runway project, the Airport will solicit bids for grading, drainage, fencing, and erosion and sediment control. Other scopes of work include:

  • Excavation of in-site soil and rock from existing Airport property areas
  • Stockpiling, placement, and compaction of excavated material in CLT-recommended locations
  • Isolated, minor site surface drainage features along regraded areas and stockpile locations
  • May include extension of existing Coffey Creek box culvert – currently under construction as part of the South Crossfield (SCF) project (TBD)
  • May include extension of existing sanitary sewer line relocation – currently under construction as part of the SCF project (TBD)
  • Identification of and relocation of existing security perimeter fence as needed.

Requirements

Last Updated: 01/24/23
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com