Specialized Roadway Construction Services FY23B

This unspecified contract will provide horizontal construction services on an as-needed basis to the General Services Department. The work includes: traffic control; erosion control; clearing and grading; drainage; milling; asphalt paving; pavement markings; retaining wall; concrete curb, sidewalk, and driveways; pedestrian refuge island, and wheelchair ramps; utility relocation and installations; and related activities.

Carolina Aviation Museum Hangar Restoration – CANCELLED

This project’s purpose is to provide a ‘shell restoration’ of the Historic 1938 Aircraft Hangar located on CLT property and will include adaptive reuse of the hangar to maintain the local historic designation and bring the structure up to code making it shell space ready for future interior upfit.

Carolina Aviation Museum Sitework

This project consists of site preparation for the future development of the Carolinas Aviation Museum. Specific work includes demolition of existing facilities, earthwork, grading, utility installation, associated asphalt, concrete masonry work, landscaping, and other miscellaneous items.

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Zone 4 Field Operations Center (Construction Manager-at-Risk)

The proposed Zone 4 project will include a 36,000 sf operations center, approximately 20,000 sf of pre-engineered metal structures to house open storage, crew storage, raw materials bunkers, two (2) combination trucks, fabrication shop, and two (2) fleet maintenance bays.  The project will also include demolition of existing facilities in a phased approach so as to minimally impact or impede current operations on the site. The project may also include roadway improvements to West Tyvola Road to increase accessibility to the site.

Rodgers Builders was selected as the Construction Manager at Risk (CMAR)  for this project.

 

Emergency Egress Gate Additions

Fabricate and install new galvanized emergency egress gates and galvanized gate posts at Tom Hunter (three new gates) University City Boulevard (six new gates) McCullough (three new gates) and J W Clay (six new gates) stations for a total of 18 new gates. New gates and gate posts are to match existing gates and gate posts submittal drawings.

 

PSR-666

Storm Water Repair and Improvement FY2021-A

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.