Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Airport Traffic Services

Direct pedestrian, vehicular and construction-related traffic on upper and lower levels of the terminal entrances, and other areas as assigned, to prevent congestion.  Provide information to the public and give directions to airport and off-airport locations. Provide exceptional customer service while maintaining an obstruction-free walkway for the movement of pedestrians across the crosswalk.  Provides assistance to individuals needing help crossing the street. Directing smokers to appropriate smoking areas. Report unattended bags. Perform other duties as required. Use proper radio etiquette for communication over the radio.

Lakeview Road Improvements

This project spans approximately 1.5 miles and will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road to accommodate the additional traffic expected as a result of the construction of NCDOT’s I-77 Lakeview Road Direct Connect Interchange project. Improvements under this project will include pavement upgrades, intersection modifications, additional through/turning lanes, upgrading drainage infrastructure, and pedestrian and bicycle facilities.

Collective Series J Storm Drain Improvement Project

The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.

Spectrum Center Traffic Control – CANCELLED

DUPLICATE of “Traffic Control Services”

 

The City of Charlotte provides direct traffic control and logistical support for the Spectrum Center which is host to an estimated 125 sporting, music, business, and other events a year. To reduce visitor risk, increase visitor return rates and minimize oversight and recurring management of City staff, the City has determined that a Traffic Control Plan, and a Company to perform portions of this plan are necessary for select events. During the last year, the City and current Company have provided this support for over 69 events. The selected Company shall be the sole provider of traffic control services for the Spectrum Center and designated areas around the Spectrum Center.

N. Tryon St- 36th St. Streetscape

The project will provide infrastructure improvements that include sidewalk, curb and gutter, milling- resurfacing, pedestrian refuge and signals, cross walks, planting strips, street trees, pedestrian and street lighting, bike lanes, and on-street parking. The project will provide 0.4 miles of streetscape along 36th street between North Tryon Street and Davidson Street. The project will tie into the Blue Line Extension project on 36th street.

Specialized Roadway Construction Services FY22D

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction FY22C

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.

Specialized Roadway Construction Services FY22A

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island, and wheelchair ramps.