Log Cabin 937 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Rocky Falls Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after review is complete.

Toomey Storm Drainage Improvement Project

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Fiscal Year 22 Water Main Rehabilitation

This project will clean and apply a polymer coating to the interior walls of old, but still structurally sound cast iron water mains.  Also included is the replacement of all valves, hydrants, and galvanized service lines associated with each project.  The work completed in this contract will improve water quality and flow in the distribution system; consists of an undetermined number of individual projects consisting of water infrastructure rehabilitation; and/or replacements, which will be assigned by the Project Engineer.

Queens Road West Water Pipe Replacement Project

Charlotte Water (CLTWater) is planning to replace water services on Queens Road West between East Boulevard and Selwyn Avenue and water pipes under Queens Road West from Wellesley Avenue to Selwyn Avenue and East Boulevard near Queens Road West. The Queens Water Main Replacement Project’s completed design and construction have not been scheduled yet.

Upper Little Sugar Creek Replacement Sewer – Phase 2 and Phase 3 from Bilmark Avenue to Canterwood Drive and 911 Georgetown Storm Drainage Improvement Project (SDIP)

The Project consists of the installation of 250 LF of 8” sewer; 3,060 LF of 16” sewer; 3,100 LF of 18” sewer; 37 manholes; bypass pumping of wastewater; and other related sewer installation/replacement work for the Upper Little Sugar Creek Replacement Sewer Phases 2 and 3 portions. For the 911 Georgetown SDIP, the project consists of the Installation of 394 LF of 5’ X 4’ Precast R.C. Box Culvert; 60 LF of 10’ X 8’ Precast R.C. Box Culvert; 9 masonry drainage structures; and other related storm drainage installation work.

Airport Traffic Services

Direct pedestrian, vehicular and construction-related traffic on upper and lower levels of the terminal entrances, and other areas as assigned, to prevent congestion.  Provide information to the public and give directions to airport and off-airport locations. Provide exceptional customer service while maintaining an obstruction-free walkway for the movement of pedestrians across the crosswalk.  Provides assistance to individuals needing help crossing the street. Directing smokers to appropriate smoking areas. Report unattended bags. Perform other duties as required. Use proper radio etiquette for communication over the radio.

Lakeview Road Improvements

This project spans approximately 1.5 miles and will add transportation capacity along Lakeview Road from Cushing Drive to Old Statesville Road to accommodate the additional traffic expected as a result of the construction of NCDOT’s I-77 Lakeview Road Direct Connect Interchange project. Improvements under this project will include pavement upgrades, intersection modifications, additional through/turning lanes, upgrading drainage infrastructure, and pedestrian and bicycle facilities.

Collective Series J Storm Drain Improvement Project

The Collective Storm Drainage Improvement Project (SDIP) Series J contains three separate projects which vary in size and each bring their unique differences. The work involves various storm drainage improvements including replacement of storm drainage pipes, culvert, masonry drainage structures, water line, sewer line, asphalt pavement, concrete driveways, concrete sidewalk and concrete curb. These improvements will realign storm drainage to reduce structure flooding and address failing infrastructure. Due to the complexity of these projects and their proximity to utility poles/structures/retaining walls, active shoring will be required.