This project consists of all pavement and lighting for the new taxiway extensions and deicing pad construction. Specific work includes erosion control, asphalt paving, concrete paving, drainage installation, pavement markings, signage, conduit installation, electrical work, and associated miscellaneous items.
North End Around Taxiway Grading and Drainage
One of seven remaining bid packages within the North End Around Taxiway Program. This package includes the major grading, drainage, utility, and NAVAIDS relocations required by the NEAT. The modifications to the NAVAIDS include a localizer relocation, modifications to multiple MALSR light stations, new NAVAID shelters and the relocation of an ASOS. These include, but are not limited to, the following: (i) Runway 36C Localizer; (ii) Runway 18C Medium Intensity Approach Light System (MALSR); (iii) Runway 18C Precision Approach Path Indicator (PAPI). These relocations will require full communication (fiber) connections to the airport fiber system and back-up power.
Phase 2 of Private Access Drive – CANCELLED
SOW Construction of Access Drive
Cancelled – This project was consolidated into the Private Access Drive – Construction project.
Relocation of West Boulevard (NC 160) (Construction)
The West Boulevard Project includes the construction of approximately 1.2 miles of the future West Blvd by realigning existing Byrum Drive and existing Piney Top Drive from the intersection of Steele Creek Road and West Blvd to the intersection of West Blvd and Piney Top Drive. The Project includes construction of a new intersection of proposed West Blvd and Byrum Drive and a new intersection of proposed West Blvd and Piney Top Drive. Disciplines will include roadway, hydraulics, erosion control, signals, traffic management, pavement marking, signing, utility design, and utility relocation. Existing portions of West Blvd between Steele Creek Road and Piney Top Drive will be removed as part of a separate project.
4th Parallel Runway Runway Package 1: Taxiway V and Connectors
The first phase of constructing the Fourth Parallel Runway at CLT is the southward extension of existing Taxiway V and construction of related connector taxiways. The project includes demolition, erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, fencing, and airfield lighting/signage. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.