Replacing the McAlpine Waste Water Treatment Plant Dewatering Building HVAC system including all associated mechanical equipment, electrical, I&C, and ancillary components.
This project includes the HVAC upgrades at McAlpine Creek WWTP Thickening/Dewatering Building. The upgrades would include the replacement of air handling units, make up air units, exhaust fans, ductworks, the addition of split AC units, and the addition of an alarm and monitoring system for HVAC equipment. The scope will also include some structural and architectural rehabilitation needed to accommodate new ductwork and HVAC equipment.
Project limits are from just south of Evergreen Cemetery Dr to about 400’ south of Central Ave at Kilborne Dr on Norland Rd (0.43 miles). The project includes a shared-use path on one side of the street, storm drainage, water line work, and 2 Rectangular Rapid Flashing Beacons (RRFBs).
This project will provide pedestrian and bicycle facilities on Sunset Road from Day Lilly Lane to Beatties Ford Road.
This project consists of constructing one new elevated storage tank 2 MG (million gallons in size). There will be waterline work associated to extend the mainline to the tank site. The selected firm would be asked to provide clearing and grading services in preparation of the tank installation.
This contract will provide for new water and sanitary sewer main construction throughout the Charlotte, NC water service area. The majority of this contract will be used to build projects for the Street Main Extension Program.
This project includes the removal of two high-density polyethene chemical storage tanks and mixers, the construction of a new chemical storage tank containment area, the installation of three new chemical storage tanks (two in the existing containment area and one in the new containment area), installation of a chemical mixer at each tank, installation of a new chemical metering pump in the new containment area, construction of an enclosed pump room within the containment areas, installation of new and replacement of piping, and construction of a canopy over the new containment area.
This project consists of the sanitary sewer rehabilitation of approximately 13,500 linear feet of sewer outfall with cured-in-place lining. This project will extend along the Briar Creek and Paw Creek outfalls. A 112 linear feet 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 linear feet 8-inch linear feet collector sewer.
Project site is mainly wooded and has minimal housing. There will be one crossing on Lawyers Rd. The project will consist of approximately 5,500 linear feet of 8-inch gravity sewer.