An extension of McCullough Drive, from it’s current terminus east
of southeast of North Tryon Street, to the disconnected terminus
southwest of W.T. Harris Blvd. It is already designed and real
estate acquired. This is necessary for splitting this project apart
from the McCullough Streetscape Project. Length = 0.272 miles
Little Sugar Creek Bridge Scour Repair
The Charlotte Area Transit System (CATS) anticipates contracting out the repair of the Little Sugar Creek Bridge scour.
PSR # 1843
Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)
This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.
WT Harris SUP (JW Clay to N Tryon)
A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path. Project Length = 0.33 miles.
Old Concord Road Shared-Use Path (Meadow Vista to Arlyn Cir)
This project will construct a shared-use path along the west side of Old Concord Road from Meadow Vista Road to Arlyn Circle. Construction of driveway improvements and wheelchair ramps are included in this scope. The construction of the shared-use path will help to improve safety and walking conditions for citizens along this minor thoroughfare. This project will also connect several miles of pedestrian walkways within this area. Old Concord Road Shared-Use Path is considered a high priority project based on CDOT’s sidewalk Priority list and was requested by the residents and business owners in the area. Improvements for Charlotte Water are also included in the project scope. Project Length= .85 miles.
Kuykendall Road Improvements
This project will connect sidewalk along Kuykendall Road from
Thorn Blade Drive to McKee Road, and add a right-turn lane from
Kuykendall Road on to McKee Road in order to to increase
pedestrian safety and help alleviate traffic congestion at the
intersection. Project will also fill in small sidewalk gap on the south
side of McKee Rd at Kuykendall Rd and add pedestrian signals with
crosswalk at this intersection. Project length = approximately 0.75
miles.
Belk Greenway Connector
Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.
Construction Manager at Risk for Robinson Church Road Phase 2
Construction Manager at Risk (CMAR) Services
A CMAR will bring value in determining the most cost-effective alignment and provide potential construction phasing options, thereby minimizing schedule risks and constructability concerns.
The proposed design includes a 12’‐wide concrete shared‐use path along one side of Robinson Church Road, beginning at Plott Road (connects to Robinson Church Road Phase 1 Improvements) and continues to Harrisburg Road. Accommodations for pedestrian / bicycle crossings and minor upgrades at major intersections (Hood Road, the future Eastern Circumferential Roadway and Harrisburg Road) and minor side streets (Alanbrook Road, Ludell Lane, Irwin Road, Fairford Drive, Solares Drive, Jerimoth Drive, Culver Spring Way, Hammond Drive, Atlas Cedar, Deluca Drive, Castle Garden Lane, Williams Gate Lane and Jones Creek Circle) will also be included in the scope. The project team is early in the design phase and plans are currently at a 10% milestone level. The CMAR shall provide input on the design, including side‐of‐street analysis for the shared‐use path and pedestrian / bicycle crossings at all major and minor intersections to identify potential cost savings and schedule efficiencies.
Storm Water Maintenance, Repair, and Improvement – TR2025
Work performed under this transportation repair (TR) contract will consist of storm water infrastructure maintenance, repair and maintenance projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties. See section 1.28 – Scope of Work for additional details and information.