aviation-bluet  Aviation / Construction

4th Parallel Runway Package 2: Runway

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-08-30 2024-08-30 4th Parallel Runway Package 2: Runway

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure.

Posting Number 2024-Q3(Jul-Sep)-AVI-12920

Anticipated Posting Date 2024-08-30

Commodity Code(s): 91223, 91395, 98136, 98814, Aspha

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure.

Requirements

Last Updated: 10/30/23
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com