North End-Around Taxiway (NEAT) Extension

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-04-29 2024-04-29 North End-Around Taxiway (NEAT) Extension

As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the north end of new Runway 1C-19C and existing Runway 18C-36C.  This project will construct the North End-Around Taxiway (NEAT).  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the NEAT.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Posting Number 2024-Q2(Apr-Jun)-AVI-12916

Anticipated Posting Date 2024-04-29

Commodity Code(s): 74500, 91223, 98814, airfi

As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the north end of new Runway 1C-19C and existing Runway 18C-36C.  This project will construct the North End-Around Taxiway (NEAT).  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the NEAT.  The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Requirements

Last Updated: 10/11/23
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com