N. Tryon St- 36th St. Streetscape

The project will provide infrastructure improvements that include sidewalk, curb and gutter, milling- resurfacing, pedestrian refuge and signals, cross walks, planting strips, street trees, pedestrian and street lighting, bike lanes, and on-street parking. The project will provide 0.4 miles of streetscape along 36th street between North Tryon Street and Davidson Street. The project will tie into the Blue Line Extension project on 36th street.

McAlpine Biosolids Improvements-CANCELLED

This project involves the rehabilitation of Biosolids Facilities and Processes which includes the dewatering facility, digester complexes, and digesters. Major mechanical process work and electrical upgrades will also be completed.

Cancelled as of 10/22/2024

McAlpine Biosolids Improvements – cancelled

This project involves the rehabilitation of Biosolids Facilities and Processes which includes the dewatering facility, digester complexes, and digesters. Major mechanical process work and electrical upgrades will also be completed.

this opportunity was archived earlier

DELETE – Construction of Phase II of the Ashe Plantation Wastewater Treatment Plant

Two customers submitted this project under slightly different titles.  This entry is redundant of the “Ashe Plantation Phase II” project.  Please delete this one.

 

Construction of a new wastewater treatment plant in South Mecklenburg County near Mint Hill.  The construction consists of process piping, wastewater equipment installation, and electrical power and controls.  The project shall also include provision of a temporary treatment plant during construction of the new plant.

Water and Wastewater Roofing Replacement Packages 14 and 15 – cancelled

Roofing Replacement of various Wastewater Treatment Plants’ structures:   McDowell, Irwin,          Sugar Creek and McAlpine.  Replacement consists of complete tear off of existing roof down to substrate.  Minor mechanical and electrical relocation/replacement work will be performed, if necessary.  

This item was archived earlier.

Water and Wastewater Roofing Replacement Packages 14 and 15 – CANCELLED

Roofing Replacement of various Wastewater Treatment Plants’ structures:   McDowell, Irwin,          Sugar Creek and McAlpine.  Replacement consists of complete tear off of existing roof down to substrate.  Minor mechanical and electrical relocation/replacement work will be performed, if necessary.  

  • Cancelled as of 8/13

Water and Wastewater Roofing Replacement Packages 12

Roofing Replacement of various Water Treatment Plants and Lift Stations. The Project consists of replacing roofing systems at Sharon Repump Station, Hoskins Booster Pump Station, and Plaza Booster Pump Station, as well as removing existing skylight and install clerestory and roof structure at Plaza Booster Pump Station and replacing the skylight at Idlewild Booster Pump Station. complete tear-off of the existing roof down to the substrate.  Minor mechanical and electrical relocations and re-hook-ups are required.

Specialized Roadway Construction Services FY22D

This unspecified contract will provide horizontal construction services on an as-needed basis to the Engineering Department. The work includes traffic control, erosion control, clearing and grading, drainage, milling, asphalt paving, pavement markings, retaining wall, concrete curb, sidewalk, driveways, pedestrian refuge island and wheelchair ramps, utility relocation and installations.