Design and construct a new 2-story, 3-bay fire station approximately 14,000 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill fire station that will alleviate high call volume for surrounding stations. A new fire station must be built when a new “point of dispatch” is required in order to meet response time standards. The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.
This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.
Phase II Animal Care & Control renovations will address non-compliant issues per the NC Department of Agriculture and Consumer Services, Animal Welfare Section (NCDA&CS) Inspection reports issued in 2018, 2020, and 2021. Phase II will address renovations for separation of species, inadequate ventilation surfaces not impervious to moisture, slab repair, additional square footage for dog and cat housing, and if funding is available fencing and gate replacement for dog kennels. This phase also will address ADA Barrier renovations to meet international ADA code requirements.
The facility is located at 8315 Byrum Drive, near the airport. This facility is just under 30 years old and the renovations required are a direct response to the NCDA&CS inspection reports. Also, the project will incorporate renovations to address ADA barriers in the facility, such as door hardware, signs, plumbing, minor parking lot curbing, etc.
CMPD background checks will be required for all construction staff, vendors, and anyone occupying the site during construction and deliveries.
Charlotte Water (CLTWater) treats raw water drawn from the Catawba River Basin and distributes treated drinking water to customers within Mecklenburg County and surrounding regions. Wastewater generated from consumptive use in eastern Mecklenburg County is discharged into the Rocky River Basin via two wastewater treatment plants (WWTPs). CLTWater intends to offset some wastewater flows that are currently tributary to the Rocky River basin due to transfer constraints and limited treatment capacities.
This Progressive Design-Build (PDB) project will likely involve the construction of at least one pumping station and force main to transfer flows from east Mecklenburg county to a wastewater treatment plant within the Catawba River Basin. Gravity sewer improvements may be necessary on the receiving sewer. The PDB firm will be required to analyze options for pumping to minimize or eliminate receiving sewer improvements. The Firm will need to consider options for storage at the pumping station or elsewhere in the system to achieve this goal.
The total anticipated CIP budget for this project is approximately $45M, assuming forcemain and gravity sewer improvements will be sized without EQ storage. The budget will vary depending on storage needs. A phased approach for the mentioned improvements, considering future connections to transfer additional flows, will be necessary to align with CIP funding schedules. CLTWater intends to have the initial project phase completed and activated to offset partial flows within two years of the notice to proceed for the planning and design work.
The PDB Team will need to have all the necessary resources to complete the planning, design, permitting, easement acquisition, and construction of this project.
CANCELLED – This project has been consolidated with a currently advertised entry “Briar Creek and Paw Creek Sewer Rehabilitation“.
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 400 total services.