The scope of this contract shall be to provide asbestos and lead based paint reports on structures the Airport intends to demolish.
The term of the Contract shall be for three (3) years with two optional one-year renewals.
The scope of this contract shall be to provide asbestos and lead based paint reports on structures the Airport intends to demolish.
The term of the Contract shall be for three (3) years with two optional one-year renewals.
CATS is seeking a vendor that can assist with valuation of its assets and develop/administer a naming rights program that will produce revenue for the system.
PSR # 1284
The City of Charlotte requires professional security guard services at the CMGC (Charlotte Mecklenburg Government Center), Old City Hall, Belmont Center and CMPD HQ.
The City of Charlotte (“City”) is seeking proposals from qualified firms interested in serving as the City’s Third-Party Administrator (“TPA”) for Workers’ Compensation claims. The TPA shall be responsible for providing all services required to supervise, manage, and administer the City’s self-insured workers’ compensation program.
Mid-life Vehicle Rehabilitation Programs involve taking railcars out of service for the overhaul, remanufacturer, or upgrade of a substantial number of vehicle systems and subsystems at once (usually in year 15 of the vehicle in service). The Rail Transit Agency requires a vendor to restore vehicles to “like new” condition and performance and to implement essential technology upgrades. As an industry practice, it recommended best practice, which is to be completed by solicitation by an offsite vendor.
PSR 1441
Provide rate model consulting services utilizing the existing rate model methodology. This consultation will assist Charlotte Water in preparing annual residential and commercial rate recommendations. All reports, data generated, etc. are the sole property of the City of Charlotte.
Provide technical consultant services to analyze, prepare and present data to the ACR that supports noise abatement initiative.
The term of the Contract shall be for three (3) years with two optional one-year renewals.
The Express Deck signage demolition will be a turnkey project for the removal and disposal of the sign assembly with the demolition of the supporting concrete columns, per construction drawings. The contract term of the shall be for a one-time purchase in which the project is estimated to be completed within 60 days.