Private Access Drive (Construction)
This is one of seven bid packages within the North End Around Taxiway Program. The construction of the Private Access Drive includes constructing approximately 3,700 feet of a two-lane roadway from the existing traffic roundabout adjacent to the Fuel Farm, along the Long Term 1 Parking Lot and Duke Energy property line and connecting to Wilkinson Boulevard with a redesigned intersection at Barry drive. This project includes utility relocations, roadway lighting, drainage, new water main and additional parking areas within Long Term 1. The purpose of this project is to construct a new access drive along the western edge of Long Term #1 parking lot to allow Long Term #1 exiting customers access to Wilkinson Blvd as well as access for terminal deliveries and Gate 80 traffic. This work will include roadway, storm drainage, traffic signal, fiber installation, parking lot, water and sewer relocation, and landscaping. The project will include work on Charlotte (CLT) owned property as well as NCDOT owned facilities. Completion of this project allows CLT Airport to take a portion of Old Dowd road out of service for North End Around Taxiway improvements.
Airport Overlook Construction (Cancelled)
One of seven bid packages within the North End Around Taxiway Program. The construction of the relocated overlook site will include a parking lot layout, as well as sidewalks, access roadway, landscaping, and restroom facilities.
North End Around Taxiway Pavement and Lighting – (Cancelled)
One of seven bid packages within the North End Around Taxiway Program. This work includes the construction of the North End Around Taxiway (NEAT) to make it fully operational. Major work items in this package include minor grading, concrete taxiway paving, related airfield lighting, pavement markings and signage
Roofing Replacement (W2R2) – Construction Package 10 Sugar Creek WWTP
The Project consists of roof replacement for package 10 – Sugar Creek WWTP Administration Building, East EQ Electrical Building and Main Lift Pump Station.
Vest Water Treatment Plant Clearwell No. 3 Roof Replacement
The Vest WTP’s Clearwell No. 3 existing precast concrete panels which already had its existing TPO Membrane roof demolished will be replaced with a new FRP Deck and TPO Membrane roof.
McKee Creek Tributary – Larkhaven GC Trunk Sewer – Cancelled
Project consists of approximately 6,700 linear feet (LF) of gravity sewer along McKee Creek Tributary.
McKee Road Water Main Extension – Cancelled
Water main extension will coincide with the extension of McKee Road to East John Street, and will consist of approximately 2 miles of 12-16″ pipe.
Uptown Cycle Track
The project includes implementation of a two-way separated cycle track in Uptown Charlotte along portion of 5th and 6th street. It will provide a connection between Little Sugar and Irwin Creek Greenways. The cycle track will be constructed mostly within the existing roadway, currently used as vehicular travel lanes and on‐street parking. Traffic signals will be modified and an at‐grade crossing of the Lynx Blue Line is required. Work includes the construction of cycle tracks and ramps, concrete medians, pavement markings, milling, resurfacing, traffic signals and signage.