engineering-property-management-bluet  Department of General Services / Construction

I-277 Rail Trail Bridge – Construction

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-10-31 2024-10-31 I-277 Rail Trail Bridge – Construction

This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform.

Posting Number 2024-Q4(Oct-Dec)-DGS-5934

Anticipated Posting Date 2024-10-31

Commodity Code(s): 74505, 91200, 91319, 91345, 91347, 91396, 91430, 96239, 96861, 96884, 98814

This project will construct a pedestrian bridge over I-277 to connect South End to Uptown. The bridge will be located just west of the existing light rail bridge and will include aesthetic elements to create a signature design. It will also include a new pedestrian rail crossing on the Morehead landing area and will tie the Stonewall plaza into the existing light rail platform.

Requirements

Last Updated: 03/14/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.winebrenner@charlottenc.gov