charlotte-water-bluet  Charlotte Water / Construction

Stowe Regional Water Resource Recovery Facility Southern Access Roads

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 2021-Q2(Apr-Jun)-CW-6035

Anticipated Posting Date 2021-06-15

Commodity Code(s): 91360

Solicitation Link: https://charlottenc.gov/DoingBusiness/Pages/SolicitationDetails.aspx?ID=1707

The Project is for the construction of an extension of the existing access road at the Long Creek Pump Station for operational connectivity between the proposed Stowe Regional Water Resource Recovery Facility (WRRF) and Long Creek Pump Station (Southern Access Road). The Southern Access Road consists of approximately 650 linear feet of paved roadway with 2-12 feet travel lanes and a three span approximately 235 feet long bridge that accommodates the two travel lanes and a pedestrian/utility corridor lane over Long Creek.

Requirements

Last Updated: 07/06/21
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov