McAlpine Low Lift Pump Station Improvements

This project consists of the replacement of low lift station pump check valves. The project will also include filter improvements and non-potable water upgrades, electrical updates, and a sluice gate replacement.

Water Master Plan 2023 (Engineering Services)

This project will update the 2015 Water Master Plan.  Charlotte Water seeks the services of a qualified engineering firm to perform a comprehensive Master Plan of the water supply and distribution system in the City of Charlotte and Mecklenburg County, develop a prioritized Capital Investment Plan and provide a continuous improvement plan.

Water and Sewer Design Consulting Services

For the supplemental design and project assistance in the completion of miscellaneous water and sewer projects.  Services will be needed for an undetermined number of individual street main projects, of varying length, throughout Charlotte Water service area. (PS) Professional Services

Overflow Lots 1 and 2 Crack Sealing (Construction)

This project will consist of approximately 75,000 LF (not to exceed) of crack sealing in Overflow Parking, Lots 1 & 2.

The contractor will properly remove/clean vegetation and debris from cracks and hot pour crack seal in running/random cracks throughout each lot.
Heavily alligator cracked areas will be excluded in lieu of asphalt patching under separate contract.  These areas will be identified on site prior to commencement of work.   Cleaning and sealing of concrete at concrete/asphalt joints (at curbs and islands) are not included.
Parking Lots will be empty and clear of vehicles during this work

Overflow Lots 1 & 2 Asphalt Patching (Construction)

This project will consist of Asphalt Patching in Overflow Parking for Lots 1 & 2.:

1. Approximately 7,500 square feet of asphalt patching at 2” depth per NCDOT Standards
2. Approximately 3,200 square feet of asphalt patching at 10.5” depth per standard below.

Compact 6” ABC stone will be included, as needed, estimated at 100 tons.

These areas will be identified/confirmed on site prior to commencement of work.  Parking lots will be empty and clear of vehicles during this work.

FY22 New Construction Services Miscellaneous Contract #1

This solicitation will provide for ongoing construction services for the installation of large water and sewer services as requested for commercial/residential use.  The work also includes opportunities for installation of short street main extensions (< 100′), fire hydrant relocations and dismantlements as related to new requests. 

FY22 New Services Miscellaneous Contract #2 – CANCELLED

Ongoing contract for installation of large water and sewer services as requested for commercial/residential use.  Also includes opportunities for short street main extensions (< 100′), fire hydrant relocations and dismantlements as related to new requests

Westbourne Storm Drainage Improvement Project

The project area covers approximately 20 acres and is roughly bounded by Old Plank Road to the north, Larkhaven Road to the east, Westbourne Drive to the west, and Bellhaven Boulevard to the south. The project includes storm drain improvement including culvert replacements, repair of aging and deteriorating storm drains by way of pipe system upgrades, and channel stabilization improvements. The project also includes water line upgrades and sanitary sewer relocations along with road resurfacing and seeding in affected project areas.

Elvis Storm Drainage Improvement Project

This project consists of two culverts in series under Cedarbrook Drive and Denbur Drive. Both culvert crossings consist of triple barrel corrugated metal pipe systems. This is a project that was identified by the asset management team and both culvert crossings are actively failing, and preliminary calculations show that the culverts are also undersized.