The purpose of this contract will be for Concourse A Ramp Level Break Room Addition. This will add a break room and restroom for use of building maintenance staff. This will be a turnkey project for the addition one room and one restroom. This work is outlined in the narrative and drawings provided by AME Consulting Engineers. Contract term is 6 months.
SBE Targeted ITB: The City has established that this project will be targeted to City certified SBE firms only. Only firms registered and have an active SBE certification with the City of Charlotte can bid on this project.
Charlotte Area Transit System is the largest Rail Transit System in North Carolina and has various maintenance needs along the rail lines. This is a solicitation for fall protection for Track 4 in the SBLRF. This will protect personnel from falling while performing maintenance on a light rail vehicle. The selected vendor will design, engineering, fabricate, and install a fall protection system for track four (4) middle and south sections of the South Boulevard Light Rail Facility.
PSR 1108
Charlotte Water intends to implement the Thermal Hydrolysis Process (THP) and other biosolids treatment improvements at the McAlpine Creek Wastewater Management Facility (WWMF) utilizing the Progressive-Design-Build delivery method to create a sustainable, regionalized, diversified, and resilient biosolids management program. The project will include the design and construction of multiple facilities at the McAlpine Creek WWMF including a Pre-Dewatering building with associated process equipment, screened sludge storage tanks, THP systems as furnished by CAMBI, improvements to the existing anaerobic digester complex including steam boilers, replacement odor control facility, sidestream deammonification treatment, electrical distribution system improvements, and other ancillary components.
One of four remaining bid packages within the North End Around Taxiway Program. The relocation of Old Dowd Road includes the construction of one two-lane bridge over the Norfolk Southern Railway (NSRR), as well as retaining structures, civil site work, and approximately 3,800 feet of a two-lane roadway connecting existing Old Dowd Road directly to Wilkinson Boulevard. The work also includes demolition of the existing bridge over the NS railroad tracks at Marshall Drive and the construction of approximately 10,000 feet of 24-inch water main and the construction of a regional detention basin.
The purpose of this project to remove four (4) existing wind cones located at the north and south ends of airfield at Charlotte Douglas International Airport and install four (4) new wind cones, provided by the Airport. Contractor is responsible to maintain a safe and clean operation and for security of all material and equipment while on site. Contractor is responsible to repair any items damage caused by work performed while on site. All staff assigned to project are required to be badge in accordance with airport security policy. Staff must properly display badge at all time, on the upper part of body visual to security and official members of the Airport. Any loss, damaged or stolen badges MUST be reported immediately to your airport contract.
Charlotte Douglas International Airport is seeking a contractor to perform crack sealing on CLT’s airfield. The work performed on the airfield will include working on runways, taxiways, aprons, and areas around the terminal ramp.
The working hours for this project will be from 11:15 pm to 5:30 am. The contractor will be required to provide all materials, equipment, labor to install crack sealant and cleaning for the work area. The airport will furnish and install
the required barricades for this project.
Project consists of roof replacement at Fleet Management, Charlotte, North Carolina. This work includes
the provision of labor, material, equipment, supervision and administration to includes:
1. Roof Areas A, B, C and D:
a. Complete removal of all existing metal roof, insulation, bituminous flashings and metal flashings,
gutters and downspouts, abandoned vents and discard.
b. Furnish and install new roof insulation, structural metal roof panels and all associated
miscellaneous work as specified herein.
c. Furnish and install new gutters, downspouts and bituminous and metal flashings.
2. Roof Area E:
a. Furnish and install new roof insulation, fully adhered PVC roof membrane and all associated
miscellaneous work as specified herein.
b. Furnish and install new gutters, downspouts and bituminous and metal flashings.
This contract is for water and sanitary sewer service installations including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer cleanout. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 800 total services.