This contract is for Task Order based new Traffic Signal Installations and modifications to existing Traffic Signals at several intersections and roadways that are maintained by the City of Charlotte and North Carolina Department of Transportation on an “as needed” basis. This contract also includes fiber-optic cable installation, splicing and testing.
Police and Fire Training Academy Roof Replacement
The project consists of a roof replacement at Police and Fire Training Academy, in Charlotte, North Carolina. This work includes labor, materials, equipment, supervision, and administration to replace the existing two-ply modified bitumen roof system with the specified thermoplastic, single-ply roof system on 4 roof areas totaling approximately 59,115 square feet of roof area.
South End Station CMAR RFP
South End Station Project will design and construct a new light rail station with offset side platforms adjacent to the Publix Supermarket and 2161 Hawkins development in South End. The project team completed a project delivery assessment and selected Construction Manager at Risk (CMAR) as the appropriate method to deliver this project.
PSR# 1483 |
Construction for Stairway Repairs for Archdale Station
Repair all stairways at Archdale, Sharon Road, and I-485
PSR # 1374
Firestation 33 Roof Replacement
Project consists of roof replacement of Fire Station 33 in Charlotte, NC. This work includes the provision of labor, material, equipment, supervision, an administration.
Replace the existing built-up asphalt roof system with the specified two-ply modified bitumen roof system on 2 roof areas totaling approximately 9,700 square feet of roof area.
FY24 Small Diameter Water/Sewer Service Contract #1
This contract is for water and sanitary sewer service installations, including connection to the existing public main, which extends a small diameter line to the property, and includes a water meter box or sanitary sewer clean out. Customers pay connection fees for the installation service, which is based on costs incurred by Charlotte Water in these contracts. The work covered by this contract will provide approximately 900 total services.
Concourses B and C Gate Modifications
The project scope includes the modifications to the arrangement of the gate counters at B concourse, gates B1-B4, and C concourse, gates C2-C5 & C7, to mitigate congestion at the north end of each concourse. The project also includes modifications required to existing partitions upon relocation of art walls, floor cores for power and data, and revised seating layouts.
CATS MOW Tremont Grade Crossing Gate Mast Relocation FY24 Shutdown CANCELLED
Contractor shall furnish the necessary equipment, traffic control and labor to remove the existing west bound traffic gate and install a new gate per the approved Plans. The Owner (CATS) shall provide the existing cable, gate foundation and new crossing gate, with all appurtenances, to be installed.
Contractor shall:
A. Contractor shall submit a schedule and detailed workplan for approval prior to the start of work.
B. Contractor shall develop, and submit for approval, test procedures and test forms for the new gate and crossing prior to executing field work.
C. Set up approved traffic control to protect the crossing during the Work both vehicle traffic and pedestrian traffic..
D. Remove the existing gate and deliver it to the North Yard Maintenance Facility or other CATS property as directed.
E. Remove all, or a sufficient amount, of the gates’ foundation so as to replace the soil and sidewalk.
F. Contractor shall demolish the sidewalk and excavate for a new gate foundation per approved Plans. Existing conduit shall be intercepted and rerouted into the new foundation. Contractor shall provide the necessary conduit, sweeps, supports, couplings and glue. Existing cable shall be un-landed, tested and terminated for the new gate.
G. Contractor shall remove and install new ADA compliant Truncated Dome.
H. Contractor shall set the new foundation and gate, provided by the Owner, and adjust gate arm length, counterweights, arm lights and light directions per the approved Plans and MUTCD requirements.
I. Contractor shall test the new gate and crossing operation.
J. Contractor shall submit test results for review and approval.
PSR #1476
ADA Improvements – Old City Hall
Scope of work will involve addressing the physical barriers identified in the City ADA Transition Plan for this facility. Areas include restrooms, water fountains, signage, handrails/guardrails, doors & hardware, reception area, exterior sidewalks, signage and parking striping.