This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s Stowe Regional Wastewater Reclamation Facility via Charlotte Water’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
Belmont Horizontal Directional Drilling Construction-cancelled
This project will deliver a new lift station and force main to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional WWRF via CLTWater’s Paw Creek Pump Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at This facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of Design and three separate construction contracts.
This opportunity has been cancelled.
Belmont Pump Station Construction-cancelled
This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.
This project has been consolidated
Sanitary Sewer Rehab – cancelled
This will be for a construction contract utilized for sanitary sewer rehab and repairs. Work will be focused on failed or failing sanitary sewer collection system assets. Work performed for this contract will help prevent future sanitary sewer overflows.
this opportunity was archived earlier
Sanitary Sewer Rehab-CANCELLED
This will be for a construction contract utilized for sanitary sewer rehab and repairs. Work will be focused on failed or failing sanitary sewer collection system assets. Work performed for this contract will help prevent future sanitary sewer overflows.
Cancelled as of 10/21/2024
FY25 Street Mains Extensions Contract 1 – CANCELLED
This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.
Cancelled as of 3/25/2024.
FY24 Street Mains Extensions Contract 2 – CANCELLED
This solicitation will be for the construction of an undetermined number of street main extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as-needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.
Cancelled as of 3/25
Lift Station Improvements Phase 4 – CANCELLED
Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis. |
-inactive due to budget reprioritization
Lift Station Improvements Phase III – cancelled
Provides for the rehabilitation of 10 to 12 sanitary sewer lift stations. Modernization of electrical and controls, installation of flow measurement equipment and miscellaneous safety and security upgrades as deemed needed on a per site basis.
This opportunity has been cancelled.