South End-Around Taxiway (SEAT)

As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the south end of new Runway 1C-19C and existing Runway 18C-36C.  This project will construct the South End-Around Taxiway (SEAT).  The project includes erosion and sedimentation control, grading, drainage, retaining wall construction, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the SEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.

Charlotte Fire Station #37 HVAC & Plumbing Equipment Replacement

This project includes HVAC and Plumbing equipment replacements for Charlotte Fire Station #37, located at 13828 South Tryon St, Charlotte, NC 28278. The scope of work includes replacing five (5) roof top air conditioning units with gas heating, one (1) roof mounted energy recovery ventilator, two (2) gas fired water heaters, and related updates to power and controls for all roof top equipment and interior VVT zone dampers. All work is to be completed in a manner to allow Charlotte Fire to maintain full access and use of the facility during the entire scope of the project.

Concrete Slab Joint Seal – Project Cancelled

Concrete expansion joints are cuts in concrete slabs, or the joints between walls and concrete slabs, that go completely through the slab to the base material. The purpose of an expansion joint is to allow the concrete slab to expand and contract with temperatures changes, without cracking the slab. Expansion joints must be sealed with a flexible sealant, to prevent water from penetrating the joint and deteriorating the sub-base.

Sweden Rd Surface Water Quality Improvement project

The project is located at an existing CDOT facility located at 4600 Sweden Rd. The project improvements include the installation of SCMs along the perimeter of the existing parking areas to capture, treat, and reduce runoff discharge pollutants that are contributing to the Sugar Creek watershed in compliance with site NPDES permit requirements.

 

Bridge Structures Repairs

This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.

Bridge Repairs

This project involves repairing bridge structures in various locations within the city limits. This work shall consist of furnishing all labor, equipment, and materials to repair noted structures. Work includes but not limited to: concrete pavement repairs, asphalt surface sealing / repair / replacement, debris removal, soil / erosion repairs, bridge substructure / superstructure repairs, expansion joint repair / replacement, barrier rail repairs, guardrail repairs, cleaning and painting bridge structures, sealing concrete wearing surface, culvert repairs, and repairs as deemed necessary by the engineer; removing, containment and disposal of existing materials; seeding and mulching all grassed areas disturbed; all incidental items necessary to complete the project as specified and shown on the Bridge Structures Repair Details and Drawings.

Water Transmission Mains – Assessment -CANCELLED

The task is to evaluate the state of the water pipes that carry water throughout the Charlotte Water System. The evaluation will mainly focus on prestressed concrete cylinder pipe, which is a type of pipe that has a concrete core, a steel cylinder, and high tensile wires. However, the evaluation may also cover other types of pipe materials.

-Cancelled due to reprioritization of projects

CMGC – ADA Implementation – Phase 1 – Chambers

This project will address the non-conforming, physical ADA barriers to the greatest extent feasible and where applicable under code provisions. Phase 1 addresses barriers in the Charlotte Mecklenburg Government Center Chamber Space. Scope includes the following, but is not limited to, Doors and Door Hardware, Ramps, Seating, Millwork, Speaker Podiums, Media Pit, Dias Access and Entry Vestibule Controlled Access.

Beaverdam Creek Trunk Sewer – Phase 2 – CANCELLED

This project consists of the design and construction of a gravity outfall along Beaverdam Creek West Branch. This outfall is a tributary to the existing Beaverdam Creek Lift Station and Force Main. Phase 2 is approximately 2,100 linear feet of pipe and will continue from the anticipated Phase 1 West Blvd extension north to a terminus near I-485. This project will accommodate economic growth in the River One area by expanding the wastewater collection system.

Cancelled as of 1/18/2024