Repair tile columns at 11 Blue Line stations that were installed in 2007. Reasons for repair include vandalism, bullnose wear on top course causing tile failure, and other freeze/thaw issues.
PSR # 1488
Repair tile columns at 11 Blue Line stations that were installed in 2007. Reasons for repair include vandalism, bullnose wear on top course causing tile failure, and other freeze/thaw issues.
PSR # 1488
The ETOD Policy and Implementation Plan will be developed to achieve the City’s goals of creating transit oriented development along the Silver Line is equitable, multimodal and economically resilient. There will be two phases to this Policy and Implementation Plan- Phase 1 will consist of a community driven road map to develop equitable policies that center around cultural, social, economical, and environmental resilience and housing stability within station areas. A co-created policy between vulnerable station-area community members and small business owners facing displacement risks. Phase 2 will focus on implementation and transforming policy frameworks into actionable steps.
PSR # 1457
The Charlotte Area Transit System (CATS) Charlotte Transportation Center (CTC) Redevelopment Project will construct a mixed-use development through a public-private partnership.
White Point previously purchased a 1.2-acre, half city block directly across the street from the CTC. This 1.2-acre property will be used to construct a temporary facility while the new structure is built at the existing location
The project will be achieved through a White Point partnership with CATS, coordination with City of Charlotte departments and stakeholders as well as communication with nearby property owners.
PSR # 1470
Contract multiple turnkey microtransit operators with dedicated fleet to operate multiple microtransit zones consistent with the adopted Envision My Ride Plan. FY 24 budget request covers initial software integration with CATS-Pass App ($35,000 estimated cost) plus the operation of up to four microtransit zones with up to seven dedicated vehicles ($2,212,021 estimated cost). Procurement process should allow for contract renewal and expansion of services annually consistent with approved operating budgets.
CANCELLED
PSR # 1487
CATS BOD is requesting a Contract (one-year terms with four one-year options for renewal) to purchase bus’s in the following tiers; as pulled from the City of Charlotte Sustainable and Resilient Fleet Policy, as available and in following the City of Charlotte Strategic Energy Action Plan;
Tier I – Zero emission vehicle
Tier II – Alternative fueled internal combustion engine
Tier III – Hybrid internal combustion engine
Tier IV – Conventional internal combustion engine – Gasoline
Tier V – Conventional internal combustion engine – Diesel
The transit buses will range from 30-60′. Estimating up to 20 buses annually at a cost of up to 1,300,000 ea.(based on the first tier of vehicle, which is zero emission/electric) with an anticipated pricing adjustment based on PPI
PSR 1402
Rail Car Maintenance requires the following service performed on two selected LRVs:
Scope of Work:
This is a 5 year requirement to purchase inventory spare Rubber Wedge / Thyssen Spider Rubbers used on the LRV S70 and Street car Wheels. Items are being purchased from the OEM in order to guarantee interchangeability with the existing hardware.
PSR # 1459
South End Station Project will design and construct a new light rail station with offset side platforms adjacent to the Publix Supermarket and 2161 Hawkins development in South End. The project team completed a project delivery assessment and selected Construction Manager at Risk (CMAR) as the appropriate method to deliver this project.
PSR# 1483 |
Telware will install a network cable from the MG90 modem to the farebox to support the mobile app validation.