Opportunities per Page
/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
Solicitation Category
- Architectural / Engineering Services
- Commodities & Goods
- Construction
- Construction Cost Estimating
- General Services
- Technology Goods & Services
Utilization
- SBE-Small Business Enterprise
- DBE-Disadvantaged Business Enterprise
- MBE-Minority Business Enterprise
- WBE-Women Owned Business Enterprise
Expected Release Date
From Date
To Date
Estimated Total Value
- $10,000 - 49,999
- $50,000 - 99,999
- $100,000 - 249,999
- $250,000 - 499,999
- $500,000 - 999,999
- $1,000,000 -4,999,999
- $5,000,000 - 9,999,999
- $10,000,000+
In Development
Aviation / Construction
Asphalt Shoulder Rehabilitation-Phase II
In Development
Aviation / Construction
Cell Phone Lot Auxiliary Lane
- Posting Number: 2034-Q1(Jan-Mar)-AVI-13447
- Anticipated Posting Date: 2034-02-27
- Last Updated: 12/20/23
The Cell Phone Lot Auxiliary Lane project will provide a full auxiliary lane along Josh Birmingham Highway that spans from the Cell Phone Lot and Long Term 1 Bus Exit to the entrance of the Cell Phone Lot. This project includes construction of a modular precast block wall, traffic control, erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, relocation of light and banner poles, asphalt paving, fencing, and signage.
In Development
Aviation / Construction
Commercial Vehicle Connector Road
- Posting Number: 2024-Q2(Apr-Jun)-AVI-13445
- Anticipated Posting Date: 2024-06-28
- Last Updated: 12/20/23
The Commercial Vehicle Connector Road project includes the addition of a commercial vehicle road bypass near Gate 80 that connects the existing Rental Car Road and the lower commercial vehicle entrance at the Charlotte Douglas International Airport (CLT) terminal. This project includes erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, asphalt paving, signage, and utilities.
In Development
Aviation / Construction
Concourses D & E Conveying Systems Replacements
- Posting Number: 2024-Q1(Jan-Mar)-AVI-13226
- Anticipated Posting Date: 2024-02-29
- Last Updated: 11/20/23
The project will consist of replacement of 3 moving walkways in Concourse E and modernization of 5 Escalators in Concourse D. The projects may be separate or combined. Minor electrical and waterproofing may be a part of the Concourse D escalator modernization project.
In Development
Aviation / Architectural / Engineering Services
Building Infrastructure Masterplan – ON HOLD
- Posting Number: 2024-Q4(Oct-Dec)-AVI-12820
- Anticipated Posting Date: 2024-11-01
- Last Updated: 11/17/23
Perform a masterplan analysis of the base building infrastructure including, but not limited to, mechanical, electrical, plumbing, and fire protection systems at Charlotte Douglas International Airport for both the main terminal campus and all Airport-owned outlying buildings. The masterplan development includes a review of the existing building infrastructural systems, establishment of a forecast analysis and growth requirements, development of implementation strategies, and preparation of budget estimates.
In Development
Aviation / Construction
4th Parallel Runway Package 2: Runway
- Posting Number: 2024-Q3(Jul-Sep)-AVI-12920
- Anticipated Posting Date: 2024-08-30
- Last Updated: 10/30/23
As part of the Fourth Parallel Runway Program at CLT, this construction package will include the construction of new Runway 1C-19C and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, fencing, vehicle service roads, miscellaneous utilities, airfield concrete and asphalt paving, marking, airfield lighting/signage, and approach lighting infrastructure.
In Development
Aviation / Construction
Aircraft Rescue and Firefighting Facility (ARFF)
- Posting Number: 2024-Q3(Jul-Sep)-AVI-12926
- Anticipated Posting Date: 2024-08-30
- Last Updated: 10/11/23
This project will construct a new Aircraft Rescue and Firefighting Facility (ARFF) at Charlotte Douglas International Airport. The facility will be constructed in a green field site within the airfield. The general scope of the project includes site preparation (grading and drainage), building construction, HVAC, plumbing, asphalt parking lot and roadway paving, electrical, and associated utilities.
In Development
Aviation / Construction
4th Parallel Runway Package 4: NAVAIDs
- Posting Number: 2024-Q3(Jul-Sep)-AVI-12924
- Anticipated Posting Date: 2024-08-30
- Last Updated: 10/11/23
To support CLT’s Fourth Parallel Runway Program, this project will include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure. The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.
In Development
Aviation / Construction
4th Parallel Runway Package 3: West Parallel Taxiway
- Posting Number: 2024-Q4(Oct-Dec)-AVI-12922
- Anticipated Posting Date: 2024-10-28
- Last Updated: 10/11/23
As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.
In Development
Aviation / Construction
North End-Around Taxiway (NEAT) Extension
- Posting Number: 2024-Q2(Apr-Jun)-AVI-12916
- Anticipated Posting Date: 2024-04-29
- Last Updated: 10/11/23
As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the north end of new Runway 1C-19C and existing Runway 18C-36C. This project will construct the North End-Around Taxiway (NEAT). The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the NEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.
In Development
Aviation / Construction
South End-Around Taxiway (SEAT)
- Posting Number: 2024-Q2(Apr-Jun)-AVI-12918
- Anticipated Posting Date: 2024-05-31
- Last Updated: 10/11/23
As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the south end of new Runway 1C-19C and existing Runway 18C-36C. This project will construct the South End-Around Taxiway (SEAT). The project includes erosion and sedimentation control, grading, drainage, retaining wall construction, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the SEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.
In Development
Aviation / General Services
Snow Removal Equipment and Assistance
- Posting Number: 2024-Q2(Apr-Jun)-AVI-12906
- Anticipated Posting Date: 2024-04-29
- Last Updated: 10/10/23
The company shall provide equipment, including operators and mechanics as needed on a contingency basis to assist with snow removal on Airport Ramp Area. Company must provide equipment and operators within four (4) hours of notification. The equipment and operators may be required to work in 12-hour shifts, 24-hours per day until conditions are cleared. This will be at the airport’s discretion.
As part of the airfield master plan effort to repair runway and taxiway asphalt shoulders asphalt crack seal and replacement is needed to meet Part-139 FAA requirements. This project will re-construct and repair asphalt shoulders for Runway 18R/36L, Runway 18C/36C, Taxiway’s Echo, Whiskey, and Charlie.
The project includes erosion and sedimentation control, airfield asphalt paving and repair which meet FAA circular requirements.