aviation-bluet  Aviation / Construction

4th Parallel Runway Package 3: West Parallel Taxiway

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-10-28 2024-10-28 4th Parallel Runway Package 3: West Parallel Taxiway

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.

Posting Number 2024-Q4(Oct-Dec)-AVI-12922

Anticipated Posting Date 2024-10-28

Commodity Code(s): 91395, 98814, Aspha

As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways.  The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.

Requirements

Last Updated: 10/11/23
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com