Aviation / Construction
South End-Around Taxiway (SEAT)
Details


As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the south end of new Runway 1C-19C and existing Runway 18C-36C. This project will construct the South End-Around Taxiway (SEAT). The project includes erosion and sedimentation control, grading, drainage, retaining wall construction, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the SEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.
Posting Number 2024-Q2(Apr-Jun)-AVI-12918
Anticipated Posting Date 2024-05-31
Commodity Code(s): 90569, 91395, 98814, Aspha
As part of the Fourth Parallel Runway Program at CLT, an end-around taxiway is required at the south end of new Runway 1C-19C and existing Runway 18C-36C. This project will construct the South End-Around Taxiway (SEAT). The project includes erosion and sedimentation control, grading, drainage, retaining wall construction, airfield concrete and asphalt paving, marking, and airfield lighting/signage to construct the SEAT. The new taxiway will meet FAA Taxiway Design Group (TDG) 5 requirements.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
Tweets by EarlyBirdCLT