Opportunities per Page
/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
Solicitation Category
- Architectural / Engineering Services
- Commodities & Goods
- Construction
- Construction Cost Estimating
- General Services
- Technology Goods & Services
Utilization
- SBE-Small Business Enterprise
- DBE-Disadvantaged Business Enterprise
- MBE-Minority Business Enterprise
- WBE-Women Owned Business Enterprise
Expected Release Date
From Date
To Date
Estimated Total Value
- $10,000 - 49,999
- $50,000 - 99,999
- $100,000 - 249,999
- $250,000 - 499,999
- $500,000 - 999,999
- $1,000,000 -4,999,999
- $5,000,000 - 9,999,999
- $10,000,000+
In Development
Charlotte Storm Water Services / Construction
Rhodes SDIP
In Development
Charlotte Storm Water Services / Construction
Collective Storm Drainage Improvement Projects Series AJ
- Posting Number: 2025-Q1(Jan-Mar)-CSWS-16566
- Anticipated Posting Date: 2025-03-15
- Last Updated: 12/03/24
Collective Storm Drainage Improvement Projects Series AJ will involve 6 projects throughout the City of Charlotte, 1614 Lombardy Circle, 2033 Teddington Drive, 2316 Kilborne Drive, 10513 Moss Mill Lane, 435 Norwood Drive, and 5447 Kerry Glen Lane. These projects will consist of reinforced concrete pipe replacement and realignment. The project pipe will consist of a range of different sizes from 15 inch to 36 inch as well as some elliptical pipe. These projects will also consist of CIPP liner, storm drainage structure replacement, non-standard endwalls, full depth asphalt, curb and gutter, concrete driveway, foundation assessment, foundation protection, boulder toe, soil lifts, and watermain replacement.
In Development
Charlotte Storm Water Services / Construction
Morning Dale Storm Drainage Improvement Project
- Posting Number: 2026-Q1(Jan-Mar)-CSWS-16551
- Anticipated Posting Date: 2026-01-10
- Last Updated: 11/22/24
The Morning Dale Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 560 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. This project area is bordered by Hinson Drive to the north, Stratfordshire Drive to the south, Tadlock Place to the east and Morning Dale Road to the west.
In Development
Charlotte Water / Construction
Service Water Improvements and Flow Meter Modifications
- Posting Number: 2025-Q2(Apr-Jun)-CW-16474
- Anticipated Posting Date: 2025-05-30
- Last Updated: 11/14/24
This project includes significant improvements to the existing service water system at the Franklin Water Treatment Plant. The scope of work involves the replacement of existing pumps, piping, valves, and backflow devices within the service water system. Additionally, new flow meters will be installed on the Franklin Water Treatment Plant service water system, while existing flow meters on the filter effluent lines at the Lee S. Dukes Water Treatment Plant will also be replaced. These upgrades are expected to enhance the accuracy of flow measurements and improve the efficiency of the service water system.
In Development
Charlotte Water / Construction
Paw Creek Sewer Rehabilitation and Sewer Diversion
- Posting Number: 2025-Q4(Oct-Dec)-CW-13021
- Anticipated Posting Date: 2025-11-01
- Last Updated: 11/14/24
This project consists of the sanitary sewer rehabilitation of approximately 4,700 LF of sewer outfall with cured-in-place lining. This project will extend along the Paw Creek outfall. A 112 LF, 24-inch diversion sewer will also be constructed under Briar Creek along with a 118 LF, 8-inch LF collector sewer. All work will occur within Charlotte Water’s existing easement. A small portion of work on a county parcel.
In Development
Department of General Services / Construction
Lawyers Rd SW (Harri Ann to Chestnut)
- Posting Number: 2026-Q4(Oct-Dec)-DGS-16279
- Anticipated Posting Date: 2026-10-01
- Last Updated: 11/05/24
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
In Development
Charlotte Storm Water Services / Construction
Newell Stream Restoration Project
- Posting Number: 2025-Q3(Jul-Sep)-CSWS-12167
- Anticipated Posting Date: 2025-09-25
- Last Updated: 11/05/24
The Newell Stream Restoration Project is located near WT Harris Boulevard (NC 24) and Old Concord Road along a network of tributaries to Toby Creek. Project improvements include restoring approximately 2,500 LF of degraded stream channel, floodplain, and riparian buffer.
In Development
Aviation / Construction
4th Parallel Runway Package 3: Parallel Taxiway and NAVAIDS
- Posting Number: 2025-Q2(Apr-Jun)-AVI-12922
- Anticipated Posting Date: 2025-04-22
- Last Updated: 11/05/24
As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.
To support CLT’s Fourth Parallel Runway Program, this project will also include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure. The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.
In Development
Department of General Services / Construction
Morris Field Bridge Replacement
- Posting Number: 2025-Q2(Apr-Jun)-DGS-8971
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/28/24
This project will replace the bridge on Morris Field Drive between Wilkinson Boulevard and Golf Acres Drive, over the Norfolk Southern Railroad.
In Development
Department of General Services / Construction
DeArmon Road Improvements Project
- Posting Number: 2026-Q2(Apr-Jun)-DGS-5221
- Anticipated Posting Date: 2026-04-01
- Last Updated: 10/28/24
The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
In Development
Department of General Services / Construction
Monroe Road Streetscape
- Posting Number: 2025-Q2(Apr-Jun)-DGS-8925
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/28/24
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
In Development
Department of General Services / Construction
Central Kilborne Norland Intersection & Street Upgrade
- Posting Number: 2025-Q3(Jul-Sep)-DGS-8945
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/28/24
Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.
Rhodes SDIP is a minor bid project that was created to address the service request at 3738 Rhodes and is located on the City project dashboard.